Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-1997-003, :on 970219,loss of Pressurizer Heaters Resulted in Manual U1 Trip & U2 ESF Actuation.Caused by Loss of Group C Pressurizer Proportional Heaters.Reactor Trip Breakers Were Verified Open + (ML18153A120)
- ML18153A121 + (ML18153A121)
- ML18153A122 + (ML18153A122)
- 05000280/LER-1997-002, :on 970116,one Train of Auxiliary Ventilation Sys Was Inoperable Outside of Ts.Caused by Personnel Error. Submitted Deviation Rept Re Reverse Rotation of Fan & Work Request to Adjust Linkage + (ML18153A124)
- ML18153A125 + (ML18153A125)
- ML18153A126 + (ML18153A126)
- ML18153A127 + (ML18153A127)
- 05000280/LER-1997-004, :on 970317,main Steam Safety Valve Was Outside as Found Setpoint Tolerance.Specific Cause Unknown,However, Minor Setpoint Drift Can Be Expected.No Immediate Corrective Actions Performed + (ML18153A128)
- 05000280/LER-1997-006, :on 970320,loss of Refueling Integrity Due to Inadequate Containment Closure Process & Verification.Fuel Movement Stopped IAW Action Statement Requirements of TS 3.10.B + (ML18153A129)
- ML18153A130 + (ML18153A130)
- ML18153A131 + (ML18153A131)
- ML18153A132 + (ML18153A132)
- ML18153A133 + (ML18153A133)
- ML18153A134 + (ML18153A134)
- ML18153A135 + (ML18153A135)
- ML18153A136 + (ML18153A136)
- 05000280/LER-1950-280, Forwards LER 50-280/97-005 Which Has Been Reviewed by Station Nuclear Safety & Operating Committee & Will Be Forwarded to Mgt Safety Review Committee for Review. Commitments Made within Ltr,Listed + (ML18153A137)
- ML18153A138 + (ML18153A138)
- 05000280/LER-1997-005, :on 970502,Unit 1 Power Range Nuclear Instrumentation Was Inoperable Due to Personnel Error.Sro & STA That Were Involved in Event Were Counseled + (ML18153A139)
- ML18153A140 + (ML18153A140)
- 05000280/LER-1997-001, :on 970123,shutdown Occurred Due to Drain Line Weld Leak.Inspected & Tested Turbine Trip Actuation Circuitry + (ML18153A142)
- ML18153A143 + (ML18153A143)
- ML18153A145 + (ML18153A145)
- ML18153A147 + (ML18153A147)
- ML18153A148 + (ML18153A148)
- ML18153A149 + (ML18153A149)
- IR 05000280/1997003 + (ML18153A151)
- ML18153A152 + (ML18153A152)
- IR 05000280/1997005 + (ML18153A153)
- ML18153A154 + (ML18153A154)
- ML18153A158 + (ML18153A158)
- ML18153A159 + (ML18153A159)
- IR 05000280/1997006 + (ML18153A161)
- ML18153A163 + (ML18153A163)
- ML18153A164 + (ML18153A164)
- IR 05000280/1997007 + (ML18153A166)
- IR 05000280/1997008 + (ML18153A168)
- ML18153A169 + (ML18153A169)
- 05000280/LER-1997-007, Forwards LER 97-007-00,per 10CFR50.73.Commitments Contained in Ltr,Listed + (ML18153A170)
- ML18153A171 + (ML18153A171)
- 05000280/LER-1997-007-01, :on 970930,determined That Plant Was Outside App R Design Basis Due to Vital Bus Isolation Issue.Caused by Personnel Error.Installed Circuit Protective Device During Oct 1997 Refueling Outage + (ML18153A172)
- ML18153A174 + (ML18153A174)
- ML18153A176 + (ML18153A176)
- 05000280/LER-1997-008, Forwards LER 97-008-00 Re Invalid Actuation Esfs,Due to Personnel Errors.Lessons Learned from Event Will Be Presented to Safety Preparers/Reviewers + (ML18153A177)
- ML18153A178 + (ML18153A178)
- 05000280/LER-1997-008-01, :on 971011,invalid Actuation of ESF Occurred. Caused by Personnel Errors.Main CR Bottled Air Sys Isolated & Containment Hydrogen Analyzer Heat Tracing Actuation Signal Reset + (ML18153A179)
- ML18153A180 + (ML18153A180)
- ML18153A182 + (ML18153A182)
- ML18153A186 + (ML18153A186)
- ML18153A187 + (ML18153A187)
- ML18153A188 + (ML18153A188)