Forwards Insp Repts 50-280/97-03 & 50-281/97-03 on 970309-0419 & NOV
ML18153A134
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/19/1997
From: Belisle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152A129 List:
References
50-280-97-03, 50-280-97-3, 50-281-97-03, 50-281-97-3, NUDOCS 9705290334
Download: ML18153A134 (5)


See also: IR 05000280/1997003

Text

. "

May 19, 1997

Virginia Electric and Power Company

ATTN:* Mr. J. P. O'Hanlon

Senior Vice President - Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard .

Glen Allen, VA* 23060 .

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-280/97-03, 50-281/97-03

NOTICE OF VIOLATION

Dear Mr. O'Hanlon:

On April 19, 1997, the NRC completed an inspection at your Surry Units 1

and 2 reactor facilities. The enclosed report presents the results of that

inspection.

Du'ring the 6-week period covered by this inspection period, although three

violations were identified, your conduct of activities at the Surry Nuclear

Power Station was generally characterized by safety-conscious operatiuns,

sound engineering and maintenance practices, and careful radiological work

controls.

One violation for not maintaining refueling containment integrity

is of concern because after the corrective action was taken for one identified

leakage path, another leakage path was identified.

These violations are cited in the enclosed Notice of Violation (Notice). and

the circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice of

Violation when preparing your response. The NRC has concluded that

information regarding the reason for the violation associated with inaccurate

information (i.e .. Violation C in the enclosed-Notice), the corrective actions

taken and planned to correct the violation and prevent recurrence, and the

date when full compliance will be achieved is already adequately addressed on

the docket in your May 6, 1997, response to Violation No. 50-280, 281/97-02-04

issued on April 7, 1997. Therefore, you are not required to address this

violation in your response to the Notice unless the description therein does

not accurately reflect your corrective actions or your position.

In that*

case. or if you choose to provide additional information, you should follow

the instructions specified in the enclosed Notice.

The NRC will use your

response to Violations A and Band C should you choose to provide one, in

part. to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements ..

9705290334 970519

PDR

ADOCK 05000280

G

PDR

I IIIIII IIIII IIIII IIIIII IIII IIIII IIII IIII

Iii

&

2

C

6

7

'ft Of

VEPCO

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Docket Nos. 50-280, 50-281

License Nos. DPR-32, DPR-37

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

M. L. Bowling, Manager

Nuclear Licerising & Operations

Support

Virginia Electric & Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060

David A. Christian, Manager

Surry Power Station

Virginia Electric & Power Company

5570 Hog Island Road

Surry, VA

23883

W.R. Matthews, Manager

North Anna Power Station

P. 0. Box 402

Mineral, VA 23117

Ray D. Peace, Chairman

Surry County Board of Supervisors

P. 0. Box 130

Dendron, VA 23839

Dr. W. T_. Lough

Virginia State Corporation

Commission

Division of Energy Regulation

P. 0. Box 1197

Richmond, VA 23209

Sincerely,

Original signed by George A. Belisle

George A. Belisle, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Michael W. Maupin

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

Richmond. VA 23219

Robert B. Strobe, M.D .. M.P.H.

State Health Commissioner

Office of the Commissioner

Virginia Department of Health

P. 0. Box 2448

Richmond, VA 23218

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Distribution w/encls: See page 3

VEPCO

Distribution w/encls:

G. Edison, NRR

R. Gibbs, RII

P. Fillion. RII

D. Jones. RII

W. Stansberry, RII

R. Aiello. RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA

23883

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

1024 Haley Drive

Mineral. VA 23117

3

Je-(/i 4-1f~ c..

/;.: &--1 . (,,.,vu-

~Ji.-,/q-'\\

PByron

05 /

/ 97

I 97

YES

NO

NO

05 /

/ 97

05 /

/ 97

05 /

/ 97

YES

NO

YES

NO

YES

NO

MAY-19-1997

00:59

SURRY RESIDENT OFFICE

VEPCO

Distribution w/encls:

G. Edison, NRR

R. Gibbs, RII

P. Fillion. RII

D. Jones, RI!

W. Stansberry, RII

R. Aiello. RII

PUBLIC

NRC Resident Ins~ctor

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA 23883

NRC Resident Ins~ctor

U.S. Nuclear Regulatory Commission

1024 Haley Drive

Mineral, VA 23117

=,,,,.c

!ITT*"""

SIQIA'ME

/

I

I

IITT*fl&I>

~

I

/ I

I

I I

I

I

I

~IT*"'"'

3

IIAlti.

1.&rner alt

Rttasser

KPaertner

DA.TE

05 /

/ 97

/0~1/(/197

05 /

COPY?

YES

NO

YES

(!lo)

m

"CCTrc

DTT.nl':':

Off.

llfJ,

SI1i1A1W£

IW£

Bllryc

1"TE

05 /

/ 97

05 /

/ 97

05 /

COPY?

YES

NO

YES

KO

YES

I 97

NO

/ 97

NO

utr-u.1 IL l<.t.l.UW 1.,1,Jt'T

LJ.;tl'ltN I NAl1t.:

1:\\::,UK~/u.J.Kl'I

!HT*"""

/

/

!tr*

05 / Lt; I 97

VES

C-NO)

IITT*

05 /

/ 97

YES

NO

Ril*"""

JColey

05 I

YES

RTT*

05 I

YE5

P.02

l>TT,nD<:

DJones

/ 97

05 /

/ 97

MO

YES

NO

DTT,

I 97

05 '

I 97

Mil

YES

MO

TOTAL P.02

'

05-19-1997

10:05AM

Nortl-, Anna HRC Office

VEPCO

Distribution w/encls:

G. Edison.~

R. Gibbs, RII

P. Fi 11 ion, RII

D. Jones, RII

W. Stansberry, RII

R. Aiello, RII

PUBLIC

3

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA 23883

NRC Resident Ins~ctor

U.S. Nuclear Regulatory Commissi

1024 Haley Drive

Mineral, VA 23117

I

""'l't

1>n.noo

D11*-~

Sl~E

NME

LGamer alt

PJ4usser

om

05 /

I 97

OS I

.' 97

COPY?

'<ES

NO

~s

NO

"""""

Dn ,tTI"~

DTT,

SI91AnRE

NMIE

IIUr)'C'

DAT!;:

OS I

I 97

0'5 I

I 97

COPY?

YES

NO

YES

'IQ

vrrll.l u.. ru:.1..uw i..w, I U..lJl't.n I IW'lt:

DTT,nDD

.,_,,l..1.-..~

KPoert!IE!'

05 //'} I 91

YES

(trJ)

....

05 /

I '!11

m

NO

i:\\SUR97UJ.Kt'I

1 540 894 5650

P.02

DfT-""

DTr *"""

DT! *""'

~)'!'1)n

JCOl~y

OJonfs

05 /

I 97

OS /

f 97

OS /

I 97

'fES

NO

YES

NO

YES

HO

"'"*

....

  • H,

OS /

/ 97

11'.i /

191

05 /

I 91

'<ES

IIO

YES

NO

YES

NO

TOTAL P.02