Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1995-004-02, :on 950607,ESFA RT Occurred During Unit 2 Controlled Shutdown Per TS 3.0.3.Caused by RHR Sys Inoperability.Replaced All SBF-1 Failed Protection Relays on 500 Kv Breakers + (ML18101A809)
- 05000272/LER-1995-009, :on 950601,valid Test of 1B EDG & Subsequent Inoperability of 1B & 1C EDGs Identified.Caused by Inadequate Vibration Tolerant Design of Original Equipment. Cracked Nipple Replace to Restore EDG 1B Availability + (ML18101A810)
- ML18101A812 + (ML18101A812)
- ML18101A813 + (ML18101A813)
- ML18101A815 + (ML18101A815)
- ML18101A817 + (ML18101A817)
- ML18101A818 + (ML18101A818)
- ML18101A819 + (ML18101A819)
- ML18101A824 + (ML18101A824)
- IR 05000507/2006023 + (ML18101A826)
- ML18101A827 + (ML18101A827)
- ML18101A830 + (ML18101A830)
- ML18101A835 + (ML18101A835)
- ML18101A836 + (ML18101A836)
- IR 05000515/2006008 + (ML18101A838)
- ML18101A839 + (ML18101A839)
- ML18101A841 + (ML18101A841)
- ML18101A842 + (ML18101A842)
- 05000272/LER-1995-006-01, :on 950404,TS 3.0.3 for Both Units Was Entered Due to Inability of CR Emergency Air Conditioning Sys to Automatically Actuate.Operability Determination Has Been Completed + (ML18101A843)
- 05000272/LER-1995-008-01, :on 950517,controlled Shutdown Completed Due to Inoperability of Switchgear & Penetration Area Ventilation Sys (Spavs).Three Spavs Supply Fans Will Be Inspected & Fan Motors Replaced + (ML18101A844)
- 05000272/LER-1995-010-01, :on 950615,RHR Pumps for long-term Flow Requirements for Both Units Declared Inoperable Due to RHR Flow Instrument Uncertainties.Evaluated EOPs + (ML18101A845)
- 05000272/LER-1995-011, :on 880222,inconsistency Between WCAP-11634 Analysis Used for Postulated Steam Line Breaks Outside Containment & Updated FSAR Was Discovered Due to Inadequate Design Review + (ML18101A846)
- ML18101A847 + (ML18101A847)
- ML18101A848 + (ML18101A848)
- ML18101A850 + (ML18101A850)
- ML18101A851 + (ML18101A851)
- ML18101A854 + (ML18101A854)
- ML18101A855 + (ML18101A855)
- ML18101A856 + (ML18101A856)
- ML18101A858 + (ML18101A858)
- ML18101A859 + (ML18101A859)
- ML18101A861 + (ML18101A861)
- ML18101A865 + (ML18101A865)
- ML18101A866 + (ML18101A866)
- ML18101A867 + (ML18101A867)
- ML18101A868 + (ML18101A868)
- ML18101A869 + (ML18101A869)
- 05000272/LER-1995-013-01, :on 950703,surveillance Testing of Seismic Monitoring Instrumentation Was Performed Approx Six & One Half Hr Late Due to Personnel Error.Provides Appropriate Levels of Discipline to Personnel Involved + (ML18101A870)
- 05000311/LER-1995-005, Forwards LER 95-005-00 Re Failure to Analyze Second Sample W/Radiation Monitor Inoperable + (ML18101A871)
- ML18101A873 + (ML18101A873)
- 05000311/LER-1995-005-02, :on 950705,failure to Analyze Second Sample W/ Radiation Monitor Inoperable Occurred.Caused by Personnel Error.Second Sample Analyzed & Determined to Be in Agreement W/First Sample + (ML18101A875)
- ML18101A877 + (ML18101A877)
- ML18101A878 + (ML18101A878)
- ML18101A879 + (ML18101A879)
- 05000272/LER-1995-015-01, :on 950711,failed to Complete Documentation of EDG TS Surveillance.Caused by Lack of Procedural Clarity Re Method of Timing EDG Start & Standby Performance.Developed Special Surveillance Testing Procedures + (ML18101A880)
- ML18101A881 + (ML18101A881)
- ML18101A882 + (ML18101A882)
- ML18101A883 + (ML18101A883)
- ML18101A887 + (ML18101A887)
- ML18101A889 + (ML18101A889)
- 05000272/LER-1995-017, :on 950718,CR Emergency Air Conditioning Sys Failed to Meet GDC 19 Criteria.Performed Calculactions to Identify Alternative Operating Mode for Eacs to Ensure That Requirements of GDC 19 Satisfied + (ML18101A890)