Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101A034 + (ML18101A034)
- ML18101A035 + (ML18101A035)
- ML18101A042 + (ML18101A042)
- NL-18-0367, 1 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report, and Revised NRC Commitments Report + (ML18101A046)
- RA-18-0008, Response to Request for Additional Information Regarding Duke Energys Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installations (Isfsis) + (ML18101A058)
- ML18101A070 + (ML18101A070)
- ML18101A096 + (ML18101A096)
- ML18101A101 + (ML18101A101)
- ML18101A110 + (ML18101A110)
- ML18101A112 + (ML18101A112)
- ML18101A113 + (ML18101A113)
- ML18101A116 + (ML18101A116)
- ML18101A117 + (ML18101A117)
- ML18101A118 + (ML18101A118)
- ML18101A119 + (ML18101A119)
- ML18101A122 + (ML18101A122)
- IR 05000327/2018410 + (ML18101A132)
- PMNS20180399, Notice of Public Meeting with Florida Power & Light (FPL) Regarding a Planned License Amendment Request (LAR) for St. Lucie Plant, Unit 2 + (ML18101A138)
- IR 05000338/2018410 + (ML18101A139)
- ML18101A140 + (ML18101A140)
- ML18101A141 + (ML18101A141)
- BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D + (ML18101A142)
- PMNS20180473, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (ML18101A146)
- PMNS20180475, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (ML18101A147)
- IR 05000184/2018401 + (ML18101A149)
- ML18101A151 + (ML18101A151)
- ML18101A154 + (ML18101A154)
- ML18101A155 + (ML18101A155)
- ML18101A156 + (ML18101A156)
- ML18101A157 + (ML18101A157)
- PLA-7689, Submittal of Cycle 21 Core Operating Limits Report + (ML18101A162)
- 05000272/LER-1994-012, :on 940718,two Intentional TS 3.0.3 Entries Occurred 940718 Due to Deenergizing Arpi System for All Control Rods.Module 2C4 & Span of Module Were Adjusted & License Change Request Will Be Submitted + (ML18101A169)
- 05000311/LER-1994-009-01, :on 940715,two Intentional TS 3.0.3 Entries Occurred Due to Deenergizing Arpi Sys for All Control Rods.Caused by Design Manufacturing.Module 2SB2 & Span of Module Were Adjusted + (ML18101A170)
- ML18101A171 + (ML18101A171)
- ML18101A172 + (ML18101A172)
- ML18101A174 + (ML18101A174)
- ML18101A175 + (ML18101A175)
- ML18101A178 + (ML18101A178)
- ML18101A179 + (ML18101A179)
- ML18101A180 + (ML18101A180)
- 05000272/LER-1994-011, :on 940714,manual Reactor Trip Initiated Due to Loss of All Cw Pumps.Caused by Undervoltage Tripping of Cw Sys 4 Kv Switchgear Bus Infeed/Load Breakers.Time Delay Relays w/700 Millisecond Installed + (ML18101A182)
- ML18101A183 + (ML18101A183)
- ML18101A184 + (ML18101A184)
- IR 05000272/1994080 + (ML18101A186)
- ML18101A187 + (ML18101A187)
- ML18101A189 + (ML18101A189)
- ML18101A190 + (ML18101A190)
- ML18101A191 + (ML18101A191)
- ML18101A192 + (ML18101A192)
- ML18101A193 + (ML18101A193)
- ML18101A194 + (ML18101A194)