CORRECTED COPY
~
OPERATING DATA REPORT ~
Docket No:
Date:
Completed by:
Mike Morroni Telephone:
Operating Status
- 1.
Unit Name Salem No. 2 Notes
- 2.
Reporting Period May 1994
- 3.
Licensed Thermal Power (MWt) 3411
- 4.
Nameplate Rating (Gross MWe) 1170
- 5.
Design Electrical Rating (Net MWe) 1115
- 6.
Maximum Dependable Capacity (Gross MWe)
- 1149
- 7.
Maximum Dependable Capacity (Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings (items 3 through 7)
Report, Gi:ve Reason NA
- 9.
Power Level to Which Restricted, if any (Net MWe)
- 10. Reasons for Restrictions., if any
- 11. Hours in Reporting Period
- 12. No. of Hrs. Rx. was Critical
- 13. Reactor Reserve Shutdown Hrs.
- 14. Hours Generator on-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH}
Gross Elec. Energy Generated (MWH)
- 18. Net Elec. Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (using MDC Net)
- 22. Unit Capacity Factor (using DER Net)
- 23. Unit Forced Outage Rate N/A.
This Month Year to Date 744 3623 744 3546.0 0
0 744 3462.3 0
0 2335672.8
- 10070244.8 743330 3254460 711102 3098446 100 95.6 100 95.6 86.4 77.3 85.7 76.7 0
4.4 50-311 06/10/94 339-2122 since Last NIA Cumulative 110736 72825.6 0
70351. 8 0
- 172533164.2 73800978 70225723 63.5 63.5 57.3 56.9 21.9
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last
- 60 days.
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
NA 8-1-7.R2