Corrected Monthly Operating Rept for June 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A192
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260299
Download: ML18101A192 (1)


Text

CORRECTED COPY

~

OPERATING DATA REPORT W Docket No:

50-311 Date:

07/10/94 Completed by:

Mike Morroni Telephone:

339-2122 Operating Status

1.

Unit Name Salem No. 2 Notes

2.

Reporting Period June 1994

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe) 1170

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe) 1149

7.

Maximum Dependable Capa9ity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA

9.

Power Level to Which Restricted, if any (Net MWe)

-N/A

10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period
12. No. of Hrs. Rx. was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator on-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)

Gross Elec. Energy Generated (MWH)

18. Net Elec. Energy Gen. (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)
23. Unit Forced Outage Rate 720 652.65 0

577.05 0

1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0

0 4039.3 70928.82 0

0

  • 11916470.4
  • 174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 63~6 76 57.4 75.4 57 4.8 21.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 days.

25. If shutdown at end of Report Period, Estimated Date of startup:

NA 8-l-7.R2

(~ ----

~