CORRECTED COPY
~
OPERATING DATA REPORT W Docket No:
50-311 Date:
07/10/94 Completed by:
Mike Morroni Telephone:
339-2122 Operating Status
- 1.
Unit Name Salem No. 2 Notes
- 2.
Reporting Period June 1994
- 3.
Licensed Thermal Power (MWt) 3411
- 4.
Nameplate Rating (Gross MWe) 1170
- 5.
Design Electrical Rating (Net MWe) 1115
- 6.
Maximum Dependable Capacity(Gross MWe) 1149
- 7.
Maximum Dependable Capa9ity (Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
- 9.
Power Level to Which Restricted, if any (Net MWe)
-N/A
- 10. Reasons for Restrictions, if any N/A.
This Month Year to Date Cumulative
- 11. Hours in Reporting Period
- 12. No. of Hrs. Rx. was Critical
- 13. Reactor Reserve Shutdown Hrs.
- 14. Hours Generator on-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
Gross Elec. Energy Generated (MWH)
- 18. Net Elec. Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (using MDC Net)
- 22. Unit Capacity Factor (using DER Net)
- 23. Unit Forced Outage Rate 720 652.65 0
577.05 0
1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0
0 4039.3 70928.82 0
0
- 11916470.4
- 174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 63~6 76 57.4 75.4 57 4.8 21.8
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 days.
- 25. If shutdown at end of Report Period, Estimated Date of startup:
NA 8-l-7.R2
(~ ----
~