Text
~
CORRECTED COPY
~
OPERATING DATA REPORT ~
Docket No:
Date:
Completed by:
Mike Morroni Telephone:
Operating Status
- 1.
Unit Name Salem No. 2 Notes
- 2.
Reporting Period July 1994
- 3.
Licensed Thermal Power {MWt) 3411
- 4.
Nameplate Rating {Gross MWe) 1170
- 5.
Design Electrical Rating {Net MWe) 1115
- 6.
Maximum Dependable Capacity{Gross MWe) 1149
- 7.
Maximum Dependable Capacity {Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings {items 3 through 7)
Report, Give Reason NA
- 9.
Power Level to Which Restricted, if any {Net MWe)
- 10. Reasons for Restrictions, if any
- 11. Hours in Reporting Period
- 12. No. of Hrs. Rx. was Critical
- 13. Reactor Reserve Shutdown Hrs.
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated
{MWH)
Gross Elec. Energy Generated
{MWH)
- 18. Net Elec. Energy Gen. {MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit capacity Factor
{using MDC Net)
- 22. Unit Capacity Factor
{using DER Net)
- 23. Unit Forced Outage Rate N/A.
This Month 744 525.08 0
477.77 0
1582257.6 495560 466128 64.2 64.2 56.6 56.2 35.8 Year to Date 5087 4723.76 0
4517.07 0
- 13498728.0 4332880 4116463 88.8 88.8 73.2 72.6 9.4 50-311 08/10/94 339-2122 since Last N/A Cumulative 112200 74003.32 0
71406.59 0
- 175961667.4 74879398 71243740 63.6 63.6 57.4 56.9 21.9
- 24. Shutdowns scheduled over next 6 months {type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 da s.
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
8-1-7.R2 NA 9408260301 940818 PDR ADOCK 05000311 R