ML18101A193

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A193
Person / Time
Site: Salem 
Issue date: 07/31/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260301
Download: ML18101A193 (1)


Text

~

CORRECTED COPY

~

OPERATING DATA REPORT ~

Docket No:

Date:

Completed by:

Mike Morroni Telephone:

Operating Status

1.

Unit Name Salem No. 2 Notes

2.

Reporting Period July 1994

3.

Licensed Thermal Power {MWt) 3411

4.

Nameplate Rating {Gross MWe) 1170

5.

Design Electrical Rating {Net MWe) 1115

6.

Maximum Dependable Capacity{Gross MWe) 1149

7.

Maximum Dependable Capacity {Net MWe) 1106

8.

If Changes Occur in Capacity Ratings {items 3 through 7)

Report, Give Reason NA

9.

Power Level to Which Restricted, if any {Net MWe)

10. Reasons for Restrictions, if any
11. Hours in Reporting Period
12. No. of Hrs. Rx. was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated

{MWH)

Gross Elec. Energy Generated

{MWH)

18. Net Elec. Energy Gen. {MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit capacity Factor

{using MDC Net)

22. Unit Capacity Factor

{using DER Net)

23. Unit Forced Outage Rate N/A.

This Month 744 525.08 0

477.77 0

1582257.6 495560 466128 64.2 64.2 56.6 56.2 35.8 Year to Date 5087 4723.76 0

4517.07 0

  • 13498728.0 4332880 4116463 88.8 88.8 73.2 72.6 9.4 50-311 08/10/94 339-2122 since Last N/A Cumulative 112200 74003.32 0

71406.59 0

  • 175961667.4 74879398 71243740 63.6 63.6 57.4 56.9 21.9
24. Shutdowns scheduled over next 6 months {type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

8-1-7.R2 NA 9408260301 940818 PDR ADOCK 05000311 R

PDR