- HNP-94-030, Monthly Operating Rept for Mar 1994 for Shearon Harris Nuclear Power Plant,Unit 1 + (ML18011A415)
- ML18011A416 + (ML18011A416)
- HNP-94-034, Forwards Special Rept Re Steam Generator Tubes Plugged During Current ISI Period,Per TS 4.4.5.5.a + (ML18011A418)
- ML18011A420 + (ML18011A420)
- ML18011A423 + (ML18011A423)
- HNP-94-033, Shnpp Unit 1 Annual Environ (Nonradiological) Operating Rept,App B,Jan-Dec 1993 + (ML18011A424)
- ML18011A425 + (ML18011A425)
- IR 05000400/1994009 + (ML18011A427)
- HNP-94-038, Application for Amend to License NPF-63,revising TSs to Allow Reduced Power Operation as Function of RCS Total Flow Rate for Flow Rate Reductions of Up to 5% Below Currently Specified Flow Rate + (ML18011A428)
- ML18011A429 + (ML18011A429)
- ML18011A430 + (ML18011A430)
- ML18011A431 + (ML18011A431)
- HNP-94-042, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-06.Corrective Action:Vehicle Keys Turned Over to Unit Supervisor & Disciplinary Measures Taken Against Responsible Individual + (ML18011A432)
- HNP-94-039, Monthly Operating Rept for Apr 1994 for Shearon Harris Nuclear Power Plant Unit 1 + (ML18011A433)
- ML18011A434 + (ML18011A434)
- ML18011A436 + (ML18011A436)
- IR 05000400/1994005 + (ML18011A437)
- ML18011A438 + (ML18011A438)
- IR 05000400/1994300 + (ML18011A440)
- ML18011A442 + (ML18011A442)
- ML18011A444 + (ML18011A444)
- ML18011A446 + (ML18011A446)
- ML18011A454 + (ML18011A454)
- ML18011A455 + (ML18011A455)
- ML18011A457 + (ML18011A457)
- ML18011A458 + (ML18011A458)
- ML18011A459 + (ML18011A459)
- IR 05000400/1994001 + (ML18011A462)
- HNP-94-044, Suppl Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount, for Plant + (ML18011A463)
- ML18011A464 + (ML18011A464)
- IR 05000400/1994007 + (ML18011A466)
- IR 05000400/1994006 + (ML18011A467)
- 05000400/LER-1994-001-03, :on 940502,discovered That Slave Relay Test for K623 Did Not Verify Actuation of RCDT Pumps Discharge Valve 1ED-121.Caused by Procedural Deficiency in OST-1044. Procedure OST-1044 Has Been Revised + (ML18011A468)
- ML18011A474 + (ML18011A474)
- HNP-94-050, Forwards Response to NRC 940513 Request for Verification of Info Contained in NRCs Reactor Vessel Integrity Database Relating to Shnpp PTS & Use Parameters,Per GL 92-01,Rev 1. Corrected Page 7-14 of Bw Rept BAW-2154,dtd Mar 1992 Encl + (ML18011A475)
- ML18011A476 + (ML18011A476)
- ML18011A477 + (ML18011A477)
- HNP-94-046, Submits Info Required Per 10CFR50.46(a)(3)(ii) for Shnpp Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models.Margin Utilization Tables for Large Break LOCA & SBLOCA Analyses Encl + (ML18011A479)
- HNP-94-049, Monthly Operating Rept for May 1994 for Shearon Harris Nuclear Power Plant + (ML18011A480)
- ML18011A482 + (ML18011A482)
- ML18011A483 + (ML18011A483)
- ML18011A484 + (ML18011A484)
- ML18011A486 + (ML18011A486)
- ML18011A489 + (ML18011A489)
- HNP-94-052, Advises That Util Scheduled Emergency Preparedness Exercise for Shnpp for 940913.Proposed 940913 Exercise Objectives Encl + (ML18011A491)
- HNP-94-053, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-10.Corrective Actions:Review of Reg Guide 1.33,App A,Paragraph 3 Made to Check for Any Other Sys That Do Not Have Fill & Vent Procedure Steps + (ML18011A492)
- ML18011A494 + (ML18011A494)
- ML18011A497 + (ML18011A497)
- HNP-94-057, Monthly Operating Rept for June 1994 for Shearon Harris Nuclear Power Plant + (ML18011A500)
- HNP-94-056, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-12.Corrective Action:Acceptance Testing Performed Was Reviewed & Was Considered to Be Adequate + (ML18011A501)
- ML18011A502 + (ML18011A502)