ML18011A420

From kanterella
Jump to navigation Jump to search
Amend 47 to License NPF-63 Re Rev to TS 4.6.4.1 to Delete 12-hr Channel Check Eliminating Need for Continuous Operation of H Monitors
ML18011A420
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/26/1994
From: Bateman W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18011A422 List:
References
NPF-63-A-047 NUDOCS 9405040263
Download: ML18011A420 (7)


Text

1P,R Ilf00

+

Cy

~c I

nO I

p Vl f

~O

++**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CA A

0 R8 G

PN e

DOC 0

0-400

'SHEAR N H RR

'UC A

POWER PLANT UNIT AMENDM T TO AC T

OP ING-C NS Amendment No. 47 License No. NPF-63 2.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power SI Light Company, (the licensee),

dated February 4, 1994, comjlies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; II B.

The facility will operate'in'conformity with'the'application, the provisions of the Act, and-the rules"and regul'ations'of the Commission; it g C.

There-is reasonable assurance (i) th'at the"activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have'been satisfied.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph Z.C.(2) of Facility Operating.License No.

NPF-63 is hereby amended to read as follows:

l 94050402b3 94042b PDR ADOCK 05000400 P

PDR

~'

(2) i S

c fications and vironme ta rotect o

The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No. 47

, are hereby incorporated into this license.

Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

. April 26, 1994 Milliam H. Bateman, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor. Regulation

TT C

F C

TO C

NS N

OP RATING C

S NO NP -6 JODc~

5 -40 I Replace the following pages of 'the Appendix A Technical Specifications with the enclosed pages.

The revised areas are indicated by marginal lines.

Remove'a 3/4 6-30 t

a 3/4 6-30

CONTAAIMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

'a ~

b.

With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

~ ~

With both hydrogen monitors inoperable, restore at. least one moni.tor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at -least HOT STANDBY: within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen monitor shall be. demonstrated OPERABLE by the performance of an ANALOG-, CHANNEL OPERATIONAL,TEST. at l,east once geq 31 days, and at least once per 92 days on a

STAGGERED TEST BASIS by performing a

CHANNEL CALIBRATION using sample gas containing:

a.

Two volume percent

hydrogen, balance nitrogen, and b.

Six volume percent

hydrogen, balance nitrogen.

SHEARON HARRIS - UNIT 1

3/4 6-30 Amendment No. 47