Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-90-123, Informs That Procedures for Supplemental Fracture Toughness Testing Submitted to NRC Via B&W Owners Group Which Transmitted BAW-2086, B&W J-R Test Procedure for Wedge Opening Loaded Fracture Toughness Specimens + (ML17348A191)
- ML17348A192 + (ML17348A192)
- IR 05000250/1990007 + (ML17348A195)
- IR 05000250/1989203 + (ML17348A196)
- ML17348A197 + (ML17348A197)
- ML17348A198 + (ML17348A198)
- IR 05000250/1990006 + (ML17348A200)
- L-90-139, Special Rept Re Breached Fire Barriers & Other Fire Protection Sys Impairments.Fire Protection Impairments 3306 Issued for Repair of Fireproofing Impaired by Removal of Conduits.Compensatory Measures Still Underway + (ML17348A201)
- L-90-124, Application for Amends to Licenses DPR-31 & DPR-41, Modifying Tech Specs to Delete Specific Composition List for Nuclear Review Board & Specifying Requisite Level of Technical Expertise for Nuclear Review Board + (ML17348A203)
- ML17348A204 + (ML17348A204)
- ML17348A205 + (ML17348A205)
- ML17348A207 + (ML17348A207)
- 05000250/LER-1989-014, :on 890912,discovered That Component Cooling Water Flow Rate to Emergency Containment Coolers Below DBA Requirements.Caused by Inadequate Administrative Controls. Mechanical Stops Readjusted to Prior Setting + (ML17348A208)
- L-90-137, Forwards Select Sys Assessment Progress Summary for Mar 1990,per 860812 Order + (ML17348A209)
- ML17348A210 + (ML17348A210)
- ML17348A211 + (ML17348A211)
- ML17348A212 + (ML17348A212)
- IR 05000250/1990010 + (ML17348A214)
- ML17348A215 + (ML17348A215)
- ML17348A217 + (ML17348A217)
- ML17348A218 + (ML17348A218)
- ML17348A219 + (ML17348A219)
- 05000250/LER-1990-007, :on 900408,CCW Pump 3B Automatically Started Due to Low Pump Discharge Header Pressure.Caused by Inadequate Procedural Controls in Operating Surveillance Procedure 3-OSP-030.7.Procedures Changed + (ML17348A221)
- L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion + (ML17348A225)
- ML17348A228 + (ML17348A228)
- ML17348A231 + (ML17348A231)
- ML17348A232 + (ML17348A232)
- 05000250/LER-1990-006, :on 900406,control Room Ventilation Sys for Common Control Room of Units Tripped While Performing Procedure TP-584.Caused by Personnel Error.Individual Counseled + (ML17348A233)
- L-90-164, Requests M Wagner Take Generic Fundamentals Exam Section of Operator Licensing Exam to Be Administered on 900606 + (ML17348A236)
- ML17348A237 + (ML17348A237)
- 05000251/LER-1990-003-02, :on 900409,reactor Protection Sys Actuation Occurred Due to Failure of Reactor Coolant Pump Underfrequency Relay Power Supply Capacitor.Caused by Open Supply Breakers.Relay Replaced + (ML17348A239)
- L-90-163, Forwards Thimble Tube Eddy Current Insp Rept Re NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Insp Conducted at End of Cycle Xi.One Thimble Required to Be Isolated Until Wear Rate Determined + (ML17348A240)
- ML17348A241 + (ML17348A241)
- ML17348A243 + (ML17348A243)
- ML17348A244 + (ML17348A244)
- ML17348A245 + (ML17348A245)
- L-90-178, Monthly Operating Repts for Apr 1990 for Turkey Point,Units 2 & 3 + (ML17348A247)
- L-90-184, Documents Written & Verbal Request for Temporary Waiver of Compliance from Tech Spec 3.4.5.b.2 Re Intake Cooling Water Pump 4B Replacement,Based on 900513 Reduction of Flow from Pump.Waiver Should Extend Until 900522 + (ML17348A252)
- ML17348A254 + (ML17348A254)
- ML17348A256 + (ML17348A256)
- L-90-185, Special Rept:Fire Barriers & Other Fire Protection Sys Inoperable for Greater than 7 Days,Thus,Violating Tech Spec 3.14.5.b.Plant Continues to Implement Compensatory Measures as Applicable + (ML17348A257)
- ML17348A258 + (ML17348A258)
- ML17348A259 + (ML17348A259)
- ML17348A260 + (ML17348A260)
- 05000250/LER-1989-021, :on 890721,discrepancies in Process Control Program Identified.Caused by Document Not Specifying That Containers Must Be Among Those Listed in Process Control Program.Operating Procedure 11550.48 Revised + (ML17348A261)
- L-90-179, Forwards Progress Summary of Select Sys Assessment for Apr 1990,per NRC 860812 order.Outage-related Mods Include Replacement of RHR Valve 887 & Completion of Installation of Redundant Air Start Motors on Emergency Diesel Generators + (ML17348A262)
- 05000250/LER-1989-013, :on 890910,boric Acid Transfer (Bat) Pump Not Declared Out of Svc Prior to Refilling Seal Pot.Caused by Noncognitive Error by Util Maint Personnel.Bat Pump 3B Realigned + (ML17348A264)
- L-90-199, Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) + (ML17348A265)
- L-90-197, Forwards Update to 890310 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Sys Upgrade Sent Out for Equipment,Const & Engineering Estimates + (ML17348A266)
- L-90-156, Forwards Relief Request 6/7 a from Code Requiring Volumetric & Visual Exam of Reactor Coolant Pump Casing Welds & Interior Surfaces.Approval Requested by 900915 to Facilitate Upcoming Outages Beginning Nov & Dec 1990 + (ML17348A267)
- ML17348A268 + (ML17348A268)