Requests Assistance from Util Re Operating History of Selected Plant Fuel Assemblies to Aid NRC in Revising Reg Guide 3.54, Spent Fuel Heat Generation in Isfsi
ML17348A241
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/10/1990
From: Edison G
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348A242 List:
References
RTR-REGGD-03.054, RTR-REGGD-3.054 NUDOCS 9005170018
Download: ML17348A241 (6)


Text

4600 c<

o IO A,

I CbO c

qO

++**+

t UNITED STATES t

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Nay 10, 1990 Docket Nos.

50-250 and 50-251 Hr. J.

H. Goldberg Executive Vice President Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Dear Hr. Goldberg:

SUBJECT:

REQUEST FOR ASSISTANCE REGARDING OPERATING HISTORY OF SELECTED TURKEY POINT FUEL ASSEMBLIES The purpose of this letter is to request assistance from FPL, as discussed with Hr. T. Grozan of your licensing staff on May 7, 1990.

The NRC staff is in the process of revising Regulatory Guide 3.54, "Spent Fuel Heat Generation in an Independent Spent Fuel Storage Installation," with the help of Oak Ridge National Laboratory (ORNL).

This revision process includes comparison of spent fuel heat rate measurements with those predicted by the ORIGEN - S/SAS2 computer code.

Fuel from Turkey Point was used in spent fuel calorimetric measurements supporting earlier efforts in this area.

Enclosure 1 is a letter from ORNL to our Office of Nuclear Regulatory Research (RES) requesting specific information.

Of most interest to ORNL is a detailed operating history for fuel assemblies D-15, D-22, D-34 and B-43, the first three of which were discharged from the Unit 3 reactor on November 19, 1977, while the latter assembly was discharged on October 25, 1975.

Enclosure 2 provides for your information excerpts from a 1980 report of work done at Hanford Engineering Development Laboratory under contact to the U.S.

Department of Energy.

The Turkey Point fuel assemblies were part of that study also.

9005170018 900510 PDR I-"IDOCK 05000250 PDC P

DFn I

'I I

'I g

~

H. Goldberg tray 10, 1990 Any information FPL could provide would be appreciated.

FPL should feel free to contact the people involved in this research at ORNL and in RES as identified in Enclosure 1, if needed.

Thank you for your cooperation.

Sincerely,

Enclosures:

As stated cc w/enclosures:

See next page Distribution:

NRC 5 LPDRs PD22 Rdg. File C.

W. Nilsen SVarga GLainas DNiller HBerkow GEdison OGC-WF EJordan JPartlow ACRS (10)

Gordon E. Edison, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation OFC: 'II-2

PN: PD II-2

. D: PDI I>>2 W&O WW

~ OWW W>>WW

&WWWWWWW&&

NANE WWWW W

DATE

5

/90

GEdison:sl
HBer o W

5/

/90 5/ I /90

>>WWWWW

&&WAN OFFICIAL RECORD COPY Document Name:

RE(VEST FOR ASSISTANCE

E I

("f 1

h II f

II

'I f

F r

V W ~

N 4 IIlI C

ll f,

i' 1'

h D

E 1l J

7 4 $

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. K. N. Harris, Yice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Fl or ida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal.-Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

P