ML17348A254

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-250/OL-90-02 for Units 1 & 2 During Wks of 900326 & 0402
ML17348A254
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/11/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348A255 List:
References
NUDOCS 9005220241
Download: ML17348A254 (4)


Text

e May ll, 1990 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President - Nuclear P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

I

SUBJECT:

TURKEY POINT RE(UALIFICATION EXAMINATION REPORT 250/OL-90-02 The NRC administered examinations during the weeks of March 26,

1990, and April 2,
1990, to employees of your company who currently hold licenses to operate the Turkey Point Nuclear Plant.

At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.

A table summarizing the examination results for each examined individual is provided in Enclosure 2.

Copies of the written examinations and answer keys are included in the report as Enclosure 3.

A requalification program evaluation report is included as Enclosure 4.

The evaluation report finds that the Turkey Point Nuclear Plant requalification program is now classified as satisfactory.

A Simulator Fidelity Report is provided in this report as Enclosure 5.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and Enclosures 1, 3, 4, and 5 will be placed in the NRC Public Document Room.

Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, (original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

1.

Examination Report 50-250/OL-90-02 2.

Requalification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.

RO/SRO Examination and Answer Key (RO) 4.

Requalification Program Evaluation 5.

Simulator Fidelity Report 900 220241 900511 PDR ADOCK 05000250 V

PDC

P'

Florida Power and Light Company May 11, 1990 cc w/encls.

1, 2, 4, and 5:

K. N. Harris, PTN Site Vice President J..Cross, Plant Manager cc w/encls.

1, 2, 3, 4, and 5:

K. Beatty, Nuclear Training Supervisor cc w/encl.

1 State of Florida

'bcc w/encls.

1, 4, and 5:

G. Edison, Project Manager,NRR E. Merschoff, DRS R. Crlenjak, DRP Section Chief R. Butcher, Turkey Point Senior Resident Inspector J.

Moorman, DRS M. Ernstes, DRS Operator Licensing Branch, NRR bcc w/encls.

1, 3, 4, and 5:

Document Control Desk RII:DRS MErnster:sd 05/ 8 /90 RII:DRS c(

CCasto 05/ 7 /90 RII'DRP RCr enjak 05/~o /90 RII:D S T ee les 05/() /90

l