'I Docket Nos.
50-250 and 50-251 April 25, 1990 LICENSEE:
Florida Power and Light Company FACILITY:
Turkey Point Units 3 and 4
SUBJECT:
SUMMARY
OF MEETING WITH FLORIDA POWER AND LIGHT COMPANY (FPSL)
ON APRIL 9-11, 1990 REGARDING EMERGENCY POWER SYSTEM ENHANCEMENT
Reference:
TAC Nurrbers 69023 and 69024 A meeting was held in Rockville, Maryland on April 9 through ll, 1990 with representatives of Florida Power and Light Compare (FP8L) to discuss their Emergent Power Systems Enhancement Project.
FPL presented the status of the project, including licensing status and engineering/construction status.
Technical discussions were held concerning details of design/operation.
FPL indicated a license amendment was needed by Novettber 1, 1990 prior to when the plant outage was scheduled to begin.
The staff stated that, in order to meet that schedule, (1) FPL would have to submit an amendment request by July 1,
- 1990, and (2) all technical discussions, staff requests for information, technical specifications, FPL safety evaluations, and FPL no significant hazards evaluations would have to be of high quality and complete by July 1, 1990.
The staff noted that there appeared to be a need for improved FPL planning/scheduling for FPL and NRC licensing actions relevant to this project.
FPL noted they were planning a special update of the FSAR in 1991 to describe plant changes associated with the enhancement project in accordance with 10 CFR 50.71(e).
An agenda and attendance list for the meeting are enclosed.
OFC::P I -2 BAlE:
I er
,~ATE:4 90
- PH:PDII-2
- GEdi son: sl
'4/
/90 Enc losures:
1.
Attendance List 2.
Agenda cc w/enclosures:
See next page Original Signed By Gordon E.
- Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OTSB D PDII-C
~Q W /g
- CHoon
- HB k
4W 90 4'0 Qo alif OFFICIAL RECORD COPY DOCuti'.nt Name:
FPL HTG SUMMhgv-DR PDOCK P00501,0284 9005000250
~
M
'lorida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
.20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida'2304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr.
K.
N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Fl orida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S.
Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Fl orida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning
& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida
- 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S, Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Flori'da Power and Li'ght Company P.O.
Box 029100 Miami, Florida 33102
'I Mr. J..
H. Goldberg Executive Vice President Florida Power and Light Company P.O.
Box 14000 Juno Beach, Florida 33408
~ '
,4
~ DISTRIBUTION:
(Docket File&
NRC 8 Local PDRs PD22 Rdg. File H.
Berkow G. Edison OGC E..Jordan, MNBB 3302 G. Lainas, 14/E/4 ACRS (10)
C.
Moon, 11/F/23 M. Sinkule R-II R. Crlenjack R-II R. Butcher D. Miller A. Toalston E. Tomlinson C. Hoxie Y. Gene Hsii R.
Emch R. Miraglia R. Borchardt (17G21)
S.
Varga
Name Attendance at Meeting with FPL to Discuss Emergency Power Enhan cement Project A ril 9-11 1990 0
anization ENCLOSURE 1
G.
E.
Edison Calvin Moon Jesus Arias Jr.
A.
Toa 1ston Edward Tomlinson Chris Hoxie Tom Grozan Tom Luke*
Joel Handschuh*
Mike Brandon F.P. Schiffley II J.
F.
Vazquez*
R. Shetty*
R. Goyal*
L. Kenneg C.
R. Bible M.P.
Huba D. R. Powel1*
Y.
Gene Hsii*
Rich Emch*
J.C.
Ba lag uero S.M. guennoz P.
Madden
- 1st day only NRC NRR/DOEA/OTSB FPL NRR/DST/SELB NRR/DOEA/OTSB NRR/D OEA/OTSB FPL FPL FPL Eba sco FPL FPL Ebasco Ebasco FPL FPL FPL FPL NRC/SRXB NRR/DOEA/OTSB FPL FPL NRC/Region II
Ih 4
S 14 Ih
~,
h 4
I
~
h
ENCLOSURE 2
EMERGENCY POWER SYSTEM ENHANCEMENT PROJECT TURKEY POINT UNITS 3 AND 4 APRIL 9, 1990 MEETING AGENDA I.
INTRODUCTION II.
LICENSING STATUS III.
OVERVIEW OF DESIGN IV.
CURRENT PROJECT STATUS
0
LICENSING STATUS SUBMITTALS DESIGN REPORT EXPLAIN SCOPE OF EPS PROJECT, DESCRIBE NEW ELECTRICAL SYSTEM CONFIGURATION,, AND DESCRIBE PROPOSED IMPLEMENTATIONPLAN TEST(NG EXPLAINTEST PROGRAM WHICHWILLBE FOLLOWED TO VERIFYOPERABILITYOF ENHANCED EPS, ANDTO QUALIFYNEW EMERGENCY DIESEL GENERATORS SAFETY ANALYSIS PROVIDE RESULTS OF ANALYSES WHICH DEMONSTRATE SAFETY OF ENHANCED EMERGENCY POWER SYSTEM LICENSE AMENDMENT PROPOSED TECHNICALSPECIFICATION
LICENSING STATUS cont'd FPL/NRC MEETING - EMERGENCY POWER (EPS) ENHANCEMENT PROJECT JUNE 4, 1987 EPS ENHANCEMENT REPORT JUNE 23, 1988 L-88-269 TESTING (EDG QUALIFICATION)
OCTOBER 19, 1988 L-88454 FPL/NRC MEETING - EPS ENHANCEMENT PROJECT AUGUST 30, 1988 NRC REQUEST FOR ADDITIONAL INFORMATION JANUARY 6, 1989 II RESPONSE TO JANUARY 6, 1989 NRC REQUEST FOR ADDITIONAL INFORMATION FEBRUARY24, 1989 L-89-54 RESPONSE TO JANUARY 6, 1989 NRC REQUEST FOR ADDITIONAL INFORMATION MARCH 20, 1989 L-89-1 07 SUPPLEMENT 1 TO EPS ENHANCEMENT REPORT - TESTING APRIL 3, 1989 L-89-124 NRC SAFETY EVALUATION-QUALIFICATIONOF NEW EMERGENCY DIESEL GENERATORS AUGUST 10, 1989 NRC REQUEST FOR ADDITIONAL INFORMATION MARCH 6, 1990 FPL/NRC MEETING - EPS ENHANCEMENTTECHNICAL SP.ECI FICATIONS APRIL 9-11, 1990
'I
TURKEYPOINT-UNITS 38 4 EPS ENHANCEMENTPROJECT
~
FPL GOALS OPTIONS EVALUATED
~
NEW EQUIPMENT(FACILITIES SiTE GENERAL ARRANGEMENT
~
NEW DIESEL BUILDINGFLOOR PLANS NEW DESIGN SINGLE LINEDRAWINGS fl.lGENAf.oAD.JRvdI
TURKEYPOINT-UNITS 3 8 4 EPS ENHANCEMENTPROJECT FF'L GOALS INCREASE EMERGENCYPOWER SYSTEM CAPACITY IMPROVE ELECTRICALSYSTEM AND UMT INDEPENDENCE DECREASE OPERATOR ACTIONS REDUCE MAINTENANCEITESTING DOWNTIMES RESOLVE STATIONBLACKOUT
TURKEYPOINT-UNITS 38 4 EPS ENHANCEMENTPROJECT OPTIONS EVALUATED EVALUATED20 ALTERNATIVES STUDIED IN DETAIL:
3 DIE-SEL AND 4 DIE-SEL CONFIGURATIONS SELECTED OPTION:
4 DIES-EL CONFIGURATION WITH ENHANCED POWER SYSTEM
TURKEY POINT UNITS 3 dc 4 EPS ENHANCEMENT PROJECT 58 4NOV bUS 3A 4NOV SUS 4A 4140V bUS 4S 4NOV WS KOO A
EXISTING DESIGN 4B 4160V BUS 4A 4160V BUS 3A 4160V BUS 3S 4160V BUS 4B 40 4160V BUS 4A D
D 3A 30 4160V BUS D
3B NEM DESIGN
TURKEYPOINT-UNITS 3 8 4 EPS ENHANCEMENTPROJECT NEW EQUIPMENTiFACILITIES DIESEL GENERATORS (2) AND BUILDING 4160 VOLTSWITCHGEAR (2) 480 VOLTMOTOR CONTROL CENTERS (4) 480 VOLTLOAD CENTERS (2)
SEQUENCERS (REPLACE 4)
LOW VOLTAGEDISTRIBUTIONEQUIPMENT FUEL OIL STORAGE TANKS (2) ANDBUILDING BATTERYCHARGERS (2) (AND REPLACE 6)
NEllYELECTRICALEQUIPMENTROOM ADDITIONALHVACSYSTEMS FOR NEW EQUIPMENT
~a C
UNIT~ I 0
SaT-2 RAW WAIUITIOIII I
2 D
0 RfACTOR lj m-
~usa Q
NEM EDG BUILDING
)
)
ED i gQTM ENTIIAIICE il IIP CWTIOL PACILITT ip REACTOR 8LOG INK-~
p' ftWlgEIIT
~ASSI PITS PHASE I 0
NUCLKM MAINT.
IIUILOING SOUTM ADMINISTRATION bUILOING TURKEY POINT SITE GENERAL ARRANGEMENT 504JLATOII BIAMHB TURKEY POINT UNITS 3 4 4 P
NHAN M NT PR T
'2 54' 9'0 (3' OL 5fL 20.80 27' O
0 I}.'
~(BEZEL OIL mw ra(4K rvp 2
E t03'7C((.00 PLA,TF Eu 2V.OO'LEC ELEC
. lIH
)(dH
)
I Fkl '4 vsiB ZAO(ATO O(QE(. GBII C(C48 C4(Ii ALI0bF
~ K COIIC LOCK (04KlO(IT (TYP) 4VgTQ FIRE 6ARRIER RR FILTIR(TYP) 5(LBuCER gTYP IL Q IP r ELJCII'AT)IAOR
-=wc-a-q
\\'y pi phiv
,~ "(=BE(
i)("
,rv }
ESE'cM
~ijt(Lce(la t EXP T(L
((((
(( C
\\
AV Cap cia>a
(
(
(
o
~ g IIp 0(ESEL 0(L QA4$ Pp
<<p C(j IW+i 5.~r DIESEL OIL.
j75 K 4b
'.-" E' 8!'0
/
C B
(N-9)
LATF Ei 24.00'TVP)
C(CEE< 0(L TANc PP 442C,>
\\
<<lg I (v P
5 I(iP BTllCL IB(S':ESEL OII 5Th TK 4A I ~
J 3 8'-0 tN IS)
GROUND FLOOR PLAN
4 2'2 2 2LC) 2(r' Ce 22 ii(3 r 8-0 Rf'khOVASLf (ARATIL/4 OCATc 0 SGLl) W ROOF AWATCH 'TYP)
OC RAN SW SUPPLY F ob (STAND bV) f(0374.00' ATc bL42.00'l
- t 14E c TYP) 4ibOV SWOR 3'FRONT SvuSA A R Ex~
SITE~ED Yo 4>
AiRCCLIRKSSOR
, JR%CENE R SKiD 4522,(08 MOTOR (TVP) 480/i2(N v AC XFM
'XSV OC 'PANEI 4059
<<OL ~ ROL PNL SU FALJ 4 AS AICC4532 (PRON COV Y ICMtINL 4
V T(a PANEL AiR4LiPRESSOR C RECEiVER SOD
- 452BrA, SPVLV FAN 4VD56 (STAND bV)
(
AN 4l(rOV buKiR 4AD TOP OFiVALL EI. 3840' I'25V OC PANEL 4035 CONTR% PN'C 455l
( g7, E'IO7'L Avy T.j <OF VA'g' DifSfL 9L STC} >K 48 QB OIESRL Oi(.
~ 5'K 4A AiR INTAKf
/
LOVVER (TYP.2)
+a 7>3 0 RtL4CNAhP SRA N~
QM ED ADOVf C. D E SEC OiL TRANS PUMPS (TY>)
(w5) 1 SECOND FLOOR PLAN
A
TURKEY POlNT.UNlTS 3 8c 4 EPS ENHANCEMENT PROJECT I/I C5 CIw EDG WAS EDG A
)
4D 4B
)
) )
)
CCW ICW AC 3W CCW 1CW 44C 4CQ O
O c0 ALT 3H
~))
)
gCP 3C 4A ALT 4C ALT 4H gCP 4C LJ '8 OO O
< III rlw C0 CC.'~
X 3C CL' cove>>cog n o o cv n < 8 vv v v eon n
~
aux o~~nlio I
I I n )4.
o>>>>X0:
yoooo)I I
I gD ~~ 44 40 C4
+o w>z>>
~ R~<~o oy ~+ C>> I 40 W la))
4-)-)L>>
a o o a. m
)44 Q a 4))
IS lO-nw OC WUX KK O
3K 38
>>; III
+W w>X CLK O
I I
))
4J 4A 4C 4D
~ dbI P h
~7 V
/$ 0 II/l~Qf
<big)(q()ag
)
K 4
CS III Vw C0 IL a<
W>XD 4B K
O O
8 h
RELOCATED LOAD
-II-II-II-CABLE DISCONNECTED/'REMOVED IICV)dE </d/00 f0.C0 TII00000001
TURKEY POINT UNITS 3 8c 4 EPS ENHANCEMENT PROJECT MCC 48 MCC 3D MCC 4D MCC 3C BATTERY 4B 4B1 4B2 BATTERY CHARCERS TYPICAL 4 PLACES 3A2 3A1 BATTERY 3A 4D01 LOAD CENTER 3H TRANSFER SW AT SWGR 3D BATTERY hB
'x b.
oO w~
IzOO BS 4B STATIC INVERTERS 3B 4A STATIC INVERTERS AS
)
)
x Vl OO IzOO 3D01 TRANSFER S AT SWGR 4D.
BATTERY 3A MCC 4C MCC 3D MCC 4D MCC 3B BATTERY 4A 4A1 4A2 BATTERY CHARCERS TYPICAL 4 PLACES 3B2 3B1 BATTERY 38 4D23 TRANSFER SW AT SWGR 3D BATTERY hA
)
)
x Vl lA.
OO w~
IzOO 4D STATIC INVERTERS 3D FUTURE 7lfS TO SPARE BATTERY PROJECT 4C 3C STATIC INVERTERS CS
)
)
x Ul OO bilIL' OO 3D23 LOAD CENTER 4H TRANSFER SW AT SWGR 4D BATTERY 3B RELOCATED LOAD w~e-CABLE DISCONNECTED/REMOVED.
IEEVSED 0/5/00 FLt0 TSISII0001
TURKEY POINT EPS ENHANCEMENT PROJECT JAN MAR APR JUN JUL SEP OCT DEC JAN MAR APR JUN JUL SEP OCT DEC JAN MAR APR JUN JUL SEP OCT DEC 1989 PRE-OUTAGE CONSTRUCTION 1990 1991 NRC APPROVAL/ EPS TECH SPECS.
t EDG BLDG COMPLETE PRE-OUTAGE START-UP TESTING U/3 OUTAGE CONSTRUCTION 0M t U/4 OFFuNE t u/4 OEFuELEO f U/3 OFFUNE t U/3 OEFUELEO OUTAGE CONSTRUCTION OUTAGE START-UP TESTING 03 APR 90 INT SFGRDS /IJ3 GRO SEP TEST 0I U/3 REFUELED t u/3 ONLINE f U/n REFuELED t U/4 ONLINE t
Tc