Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-89-288, Forwards Jul 1989 Progress Summary of Select Sys Assessment, Per NRC 860812 Order + (ML17347B264)
- ML17347B265 + (ML17347B265)
- L-89-283, Responds to Violations Noted in Insp Repts 50-250/89-24 & 50-251/89-24.Corrective Actions:New Backfit Const Procedure Developed to Improve Control of Process Sheets & Installation Lists for Lifted Leads + (ML17347B266)
- 05000251/LER-1989-006-01, :on 890713,intake Cooling Water Flow to Component Cooling Water HXs Degraded Below Design Basis Flow Rate for 15 Minutes.Caused by Failure of Header Isolation Valve 4-50-308.Valve Replaced & Pin Removed + (ML17347B267)
- L-89-301, Special Rept:On 890706-21,breached Fire Barriers & Other Fire Protection Sys Impairments Open Longer than Tech Spec Limits + (ML17347B269)
- 05000251/LER-1989-007-01, :on 890713,determined That Required Visual Exam for Leakage Missed.Caused by Cognizant Field Engineer Personnel Error.Visual Exam Performed within 1 Hr.No Leakage Detected.Personnel Counseled + (ML17347B270)
- L-89-290, Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4 + (ML17347B271)
- ML17347B272 + (ML17347B272)
- ML17347B273 + (ML17347B273)
- ML17347B274 + (ML17347B274)
- ML17347B276 + (ML17347B276)
- L-89-309, Cycle XII Startup Rept + (ML17347B277)
- L-89-292, Documents Request & Justification Re Discretionary Enforcement to Extend out-of-svc Time for Containment Spray Pump 4A.Containment Spray Pump Refurbished During Last Unit 4 Refueling Outage & Testing Showed Acceptable Performance + (ML17347B278)
- ML17347B279 + (ML17347B279)
- ML17347B282 + (ML17347B282)
- L-89-312, Forwards Change a to Rev 1 to JNS-PTN-200, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves. Current Program Being Reviewed Against Requirements of Generic Ltr 89-04 + (ML17347B283)
- ML17347B284 + (ML17347B284)
- ML17347B285 + (ML17347B285)
- L-89-306, Documents Improvements Made in Util Operator Training Program for Plant,Particularly Requalification Training & Results Achieved + (ML17347B286)
- L-89-311, Forwards Summary Rept of Integrated Schedule Generated for Jul 1989 + (ML17347B287)
- ML17347B288 + (ML17347B288)
- L-89-314, Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test + (ML17347B289)
- ML17347B290 + (ML17347B290)
- ML17347B291 + (ML17347B291)
- 05000251/LER-1988-011-01, :on 880816,damage Occurred to Property in Excess of $2,000 Due to Spent Fuel Pool Leakage.Caused by Pump Failure Causing Vent Valve to Vibrate Open.Floor Drain Sys Cleaned.Pump & Oiler Repaired & Inspected + (ML17347B292)
- ML17347B293 + (ML17347B293)
- ML17347B295 + (ML17347B295)
- ML17347B296 + (ML17347B296)
- L-89-315, Semiannual Radioactive Effluent Release Rept Jan-June 1989 + (ML17347B301)
- L-89-302, Responds to Violations Noted in Insp Repts 50-250/89-07 & 50-251/89-07.Corrective Actions:Marker Plates Installed on Each MSSV Showing Final as Left Ring Settings After Completion of All Required Testing + (ML17347B302)
- ML17347B306 + (ML17347B306)
- IR 05000250/1989032 + (ML17347B308)
- ML17347B309 + (ML17347B309)
- IR 05000250/1989035 + (ML17347B311)
- ML17347B313 + (ML17347B313)
- IR 05000250/1989024 + (ML17347B314)
- L-89-324, Forwards Estimates of Anticipated Number of Candidates to Examine During Each Site Visit Assigned by Generic Ltr 89-03,dates for Requalification Exams During FY89-FY92 & Best Estimate Date for Planned Simulator Certification + (ML17347B315)
- L-89-325, Responds to Violations Noted in Insp Repts 50-250/89-27 & 50-251/89-27.Corrective Actions:Administrative Procedure 0-ADM-209 Revised to Require Independent Verification by Reactor Control Operator of Accuracy of Info on New Tags + (ML17347B316)
- 05000250/LER-1988-021, :on 880913,pressurizer PORV Stroke Time Exceeded Tech Spec Design Basis Value of 3.0 for Heat Input Case.Caused by Undersized Air & Nitrogen Backup Supply Line to Actuators.Procedures Revised + (ML17347B317)
- 05000251/LER-1989-008-01, :on 890809,containment Spray Pump Exceeded Tech Spec Limit by Remaining Out of Svc for More than 24 H.Caused by Installation Which Led to Stresses in Motor Casing.Spray Pump 4A Replaced W/New Motor + (ML17347B319)
- ML17347B320 + (ML17347B320)
- IR 05000250/1989034 + (ML17347B322)
- ML17347B327 + (ML17347B327)
- L-89-321, Forwards Feedback on Pilot Testing of Fundamentals Exam,Per 890714 Request.Encl Withheld (Ref 10CFR2.790(a)(6)) + (ML17347B328)
- ML17347B331 + (ML17347B331)
- ML17347B333 + (ML17347B333)
- L-89-331, Monthly Operating Repts for Aug 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (ML17347B334)
- ML17347B335 + (ML17347B335)
- L-89-333, Special Rept Informing of non-functional Fire Barrier Penetration Not Returned to Functional Status within 7 Days. Fire Protection Impairments Issued for Access to Areas of Const Work.Compensatory Measures Implemented + (ML17347B336)
- L-89-334, Advises That Ref Matl Re Operator Exam Scheduled for Wk of 891106 Shipped to Listed Address,Per NRC 890831 Request. Examiners Should Return Ref Matl to Facility After Exam,To Be Maintained for Next Exam Cycle + (ML17347B337)
- 05000250/LER-1989-012, :on 890707,discovered Liquid Scintilation Counter W/Internal Calibr Source Not Leak Tested Per Tech Specs.Caused by Inadequate Administrative Control. Administrative Procedure Issued on 890630 + (ML17347B338)