ML17347B306

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/89-32 & 50-251/89-32 on 890626-30.No Violations or Deviations Noted
ML17347B306
Person / Time
Site: Turkey Point  
Issue date: 08/23/1989
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B307 List:
References
NUDOCS 8909080134
Download: ML17347B306 (5)


See also: IR 05000250/1989032

Text

gc CEKZRATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8909080134

DOC.DATE: 89/08/23

NOTARIZED: NO

DOCKET

g

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

05000250

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C

05000251

AUTH.NAME.

'AUTHOR AFFILIATION

GIBSON,A.F.

Region 2, Ofc of the Director

RECIP.NAME

'ECIPIENT AFFILIATION

WOODY,C.O.

Florida Power

& Light Co.

SUBJECT:

Forwards Insp Repts

50-250/89-32

& 50-251/89-32

on

890626-30.No violations or deviations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR 3 ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vino ation Response

NOTES:

INTERNAL:

RECIPIENT

ID CODE/NAME

PD2-2

PD

AEOD

AEOD/TPAD

LOIS,ERASMIA

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDISON,G

AEOD/DEIIB

DEDRO

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE~IEBERMAN,J

~EG~4E

0~

RGN2

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

h

EXTERNAL: LPDR

NSIC

1

.

1

1

1

NRC

PDR

1

1

h

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

Cl

August 23, =1989

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Nr.

C. 0.

Woody, Acting

Senior Vice President - Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/89-32

AND 50-251/89-32

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

P.

T. Burnett

on

June 26-30,

1989.

The inspection

included

a review of

activi ties authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with . those

members

of your staff

identified in the enclosed

Inspection

Report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews

with personnel,

and

observation

of

activities in progress.

Within the

scope

of

the

inspection,

no violations

or deviations

were

identified.

Your attention

is invited to the unresolved

item identified in the inspection

report.

This matter will be pursued

during future inspections.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

wi 11

be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter; please

contact

us.

I

Sincerely,

'riginal signed

by

Al ber t- F.

Gibson

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

Albert F. Gibson, Director

Divi s ion

of Reactor

Sa fety

August 23,

1989

Florida Power and Light Company

cc w/encl:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

E. Lyons, Acting Regulatory

and

Compliance Supervisor

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

G. Belisle

R.

Cr lenjak

P. Burnett

RII'S

P

urnett:er

08// 8/89

RII:

GABe i sl e

08/

i

/89

(H RII:0R

CJu

san

RII:D P

RVCrlenja

08/P/89

08/ igg89