ML17347B320
| ML17347B320 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/31/1989 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B321 | List: |
| References | |
| NUDOCS 8909140150 | |
| Download: ML17347B320 (5) | |
See also: IR 05000250/1989034
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
t
CESSION NBR:8909140150
DOC.DATE: 89/08/31
NOTAR1ZED:
NO
ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
AUTH.NAME
.
AUTHOR AFFILIATION
REYES,L.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
WOODY,C.O.
Florida Power
& Light Co.
SUBJECT:
Forwards Insp Repts 50-250/89-34
& 50-251/89-34
on
890701-28.No violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
N
05000250
05000251
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
AEOD/TPAD
LOIS, ERASMIA
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
ERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISON,G
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE LIEBERMAN,J
G
RGN2
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
I
D
h
NClIE TO ALL RIDS" REC?PIERS
PZEASE HELP US
XO REDUCE HASTE
CXÃIACT THE DOCUMEPZ CXRWRL DESKS
RXN P1-37
(EXT. 20079)
KO ELQGMXE ACR NAME HKH DISTRIBVZICH
LISTS FOR DOCXIMEKS KÃJ DON'T NEED!
OTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
AUG 3 i 1989
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr.
C.
0.
Woody, Acting.
Senior Vice President - Nuclear
P.
0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS.
50-250/89-34
and 50-251/89-34
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
R.
C.
Butcher
on July 1-28,
1989.
The
inspection, included
a
review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selected
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter
and its enclosure
will be placed in the
NRC Public Document
Room.
The
responses
directed
by this letter
and its enclosure
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
Original Signed by
Luis A. Reyes
Luis A. Reyes,
Director
Division of Reactor Projects
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page
2)
90<. '1
v<909~4
"
05000250
+JOCK
pDC
O
AUG 3 I 198S
cc w/encl:
K. N. Harris, Vice President
Turkey Point Nuclear Plant
J.
E. Cross,
Plant Manager
Turkey Point Nuclear Plant
L. W. Bladow, Plant
gA Superintendent
E. Lyons, Acting Regulatory
and
Compliance Supervisor
State of Florida
bcc w/encl:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of,Reactor
Projects,
NRC Resident
Inspector
NRC Section Chief
NRC Project Engineer
Document Control
Desk
e
RI:D
P
RC
enjak
08
89
R
- DRP
MSin
ule'8
89
4