Forwards Insp Repts 50-250/89-34 & 50-251/89-34 on 890701-28.No Violations or Deviations Noted
ML17347B320
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B321 List:
References
NUDOCS 8909140150
Download: ML17347B320 (5)


See also: IR 05000250/1989034

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

t

CESSION NBR:8909140150

DOC.DATE: 89/08/31

NOTAR1ZED:

NO

ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C

AUTH.NAME

.

AUTHOR AFFILIATION

REYES,L.A.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

WOODY,C.O.

Florida Power

& Light Co.

SUBJECT:

Forwards Insp Repts 50-250/89-34

& 50-251/89-34

on

890701-28.No violations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

DOCKET

N

05000250

05000251

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

AEOD/TPAD

LOIS, ERASMIA

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

ERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDISON,G

AEOD/DEIIB

DEDRO

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE LIEBERMAN,J

G

RGN2

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

I

D

h

NClIE TO ALL RIDS" REC?PIERS

PZEASE HELP US

XO REDUCE HASTE

CXÃIACT THE DOCUMEPZ CXRWRL DESKS

RXN P1-37

(EXT. 20079)

KO ELQGMXE ACR NAME HKH DISTRIBVZICH

LISTS FOR DOCXIMEKS KÃJ DON'T NEED!

OTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

AUG 3 i 1989

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr.

C.

0.

Woody, Acting.

Senior Vice President - Nuclear

P.

0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS.

50-250/89-34

and 50-251/89-34

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

C.

Butcher

on July 1-28,

1989.

The

inspection, included

a

review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selected

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

The

responses

directed

by this letter

and its enclosure

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

Original Signed by

Luis A. Reyes

Luis A. Reyes,

Director

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

90<. '1

v<909~4

"

05000250

+JOCK

pDC

O

AUG 3 I 198S

cc w/encl:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L. W. Bladow, Plant

gA Superintendent

E. Lyons, Acting Regulatory

and

Compliance Supervisor

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of,Reactor

Projects,

NRR

NRC Resident

Inspector

NRC Section Chief

NRC Project Engineer

Document Control

Desk

e

RI:D

P

RC

enjak

08

89

R

DRP

MSin

ule'8

89

4