ML17347B331

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-250/OL-89-02 for Units 3 & 4 Administered on 890601-02
ML17347B331
Person / Time
Site: Turkey Point  
Issue date: 08/31/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B332 List:
References
NUDOCS 8909190107
Download: ML17347B331 (2)


Text

August 31, 1989 Florida Power and Light Company ATTN:

Mr. C. 0.

Woody Senior Yice President Nuclear Energy Department P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

TURKEY POINT REQUALIFICATION EXAMINATION REPORT 250/OL-89-02 The NRC administered remedial examinations June 1-2, 1989, to employees of your company who currently hold licenses to operate the Turkey Point Nuclear Plant.

At the conclusion of the site visit, preliminary findings were discussed with those members of your staff identified in the Examination

Report, Enclosure l.

A table summarizing the examination results for each examined individual is provided in Enclosure 2.

It should be noted that five additional-individuals took the written examination due to having failed that portion of the facility administered. requalification exam.

These'xams were only co-graded with your facility and results are not included'herein.

Copies of the written examination and answer key are included in this report as Enclosure 3.

A Requalification Program Evaluation Report is not included.

Due to the nature of this examination, there was an insufficient sample size and examination scope to make an appropriate determination.

However, improvements were noted in facility evaluator performance and examination question development.

A Simulator Fidelity Report is provided in this report as Enclosure 4.

In accordance with 10 CFR 2.790(a),

a copy of this letter and Enclosures 1, 3,.

and 4 will be placed in the NRC's Public Document Room.

Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any question concerning this letter, please contact us.

Sincerely, 8909 j,90107 890831 PDR ADOCK 05000250 V

PNU

Enclosures:

(See Page 2)

(original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Flori da Power and Light Company August 31, 1989

Enclosures:

l.

Examination Report No. 50-250/OL-89-02 2.

Requalification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.

RO/SRO Exam guestions and Answer Key 4.

Simulator Fidelity Report cc w/encl 1:

State of Florida cc w/encls 1 and 4:

K. N. Harris, PTN Site Vice President J.

Cross, Plant Manager cc w/encls 1, 2, 3, and 4:

K. Beatty, Nuclear Training Supervisor bcc w/encls 1 and 4:

Operator Licensing Branch, NRR G. Edison, NRR R. Crlenjak, DRP R. Butcher, Turkey Point Senior Resident Inspector C. Casto, DRS bcc w/encls 1, 3, and 4:

8~I CPaygle:btm 8//f/89 RII C asto 8/QL/89 RII eebles 8/y(/89 RI I A

son

/

/89