Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1989-006, :on 890312,limiting Condition for Operation for Intake Cooling Water Pumps Not Met.Caused by Train B Intake Cooling Water Pump Taken Out of Svc While Train a Emergency Diesel Generator Inoperable + (ML17347B087)
- ML17347B090 + (ML17347B090)
- ML17347B091 + (ML17347B091)
- ML17347B093 + (ML17347B093)
- ML17347B094 + (ML17347B094)
- ML17347B095 + (ML17347B095)
- ML17347B096 + (ML17347B096)
- ML17347B097 + (ML17347B097)
- L-89-147, Monthly Operating Repts for Mar 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (ML17347B098)
- ML17347B099 + (ML17347B099)
- ML17347B101 + (ML17347B101)
- ML17347B102 + (ML17347B102)
- ML17347B103 + (ML17347B103)
- L-89-144, Forwards Assessment of Amended Station Blackout Rule 10CFR50.63,description of Procedures in Place That Will Be Modified & Proposed Mods & Implementation Schedule + (ML17347B104)
- ML17347B105 + (ML17347B105)
- L-89-135, 1988 Annual Radiological Environ Operating Rept + (ML17347B110)
- ML17347B111 + (ML17347B111)
- ML17347B113 + (ML17347B113)
- ML17347B114 + (ML17347B114)
- L-89-193, Responds to Violation Noted in Insp Rept 50-251/89-12. Corrective Actions:Valve 4-201B Closed Terminating Leakage & Procedure 3/4-OP-041.8 Revised + (ML17347B115)
- ML17347B117 + (ML17347B117)
- ML17347B119 + (ML17347B119)
- ML17347B120 + (ML17347B120)
- 05000251/LER-1989-003-02, :on 890505,reactor Tripped During Performance of Steam Generator Protection Set III Channel Test.Cause Under Investigation.Leads Landed to Provide Signal to Reactor Protection Sys for Valve Position + (ML17347B123)
- L-89-208, Confirms 890821-25 Special Insp of Compliance w/10CFR50,App R,Sections Iii.G,Iii.J & III.0 at Facilities + (ML17347B128)
- ML17347B133 + (ML17347B133)
- L-89-216, Forwards May 1989 Progress Summary of Select Sys Assessment, Per 860812 Order + (ML17347B144)
- PNO-II-89-046A, on 890622,seven Samples from Drug Test Ref to Lab for Confirmatory Testing.One mid-level Supervisor Refused Test & Suspended.Fbi Investigation Continuing.Local Media Coverage Extensive + (ML17347B148)
- L-89-228, Responds to NRC Re Violations Noted in Insp Repts 50-250/89-18 & 50-251/89-18.Corrective Actions:Warning Signs Posted in Safeguards Racks of Both Units & at Power Supply Breakers to Safeguards Logic for Both Trains in Both Units + (ML17347B153)
- L-89-226, Forwards Turkey Point Plant Unit 4 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test, Per 10CFR50,App J + (ML17347B155)
- ML17347B156 + (ML17347B156)
- ML17347B157 + (ML17347B157)
- L-89-229, Responds to Violations Noted in Insp Rept 50-250/89-22. Corrective Actions:Administrative Site Procedure ASP-34, Preparation of Process Sheets & Installation Lists, Revised to Clarify Insp Activity Definitions + (ML17347B158)
- L-89-234, Special Rept:On 890505,0607 & 08,fire Barriers Breached & Other Fire Protection Sys Impairments Occurred.Fire Protection Impairment 2477 on Alarm Point Taken Out of Svc for Welding in Fire Zone 054.Work Ongoing + (ML17347B161)
- ML17347B163 + (ML17347B163)
- ML17347B165 + (ML17347B165)
- ML17347B167 + (ML17347B167)
- L-89-236, Forwards 6-month Integrated Schedule Regulatory Rept. Completion of Category a Integrated/Schedule Mod 0068, Unit 3 ATWS Mods Advanced to Unit 3 Diesel tie-in Outage, Scheduled to Begin in Jan 1991 + (ML17347B169)
- L-89-233, Provides Status of Remaining Performance Enhancement Program Activities,Per NRC 860812 Confirmatory Order.Comprehensive QA Closeout of Program Completed W/One of Nine Findings Open & Scheduled for Completion by Oct 1990 + (ML17347B170)
- IR 05000250/1989014 + (ML17347B171)
- ML17347B173 + (ML17347B173)
- L-89-235, Forwards marked-up FSAR Pages W/Changes Expected from Adoption of Revised Tech Specs in 890605 License Amend Request.Encl Changes to FSAR Would Facilitate Completion of NRC SER + (ML17347B174)
- ML17347B177 + (ML17347B177)
- ML17347B182 + (ML17347B182)
- ML17347B183 + (ML17347B183)
- L-89-250, Monthly Operating Repts for June 1989 for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4 + (ML17347B185)
- ML17347B186 + (ML17347B186)
- IR 05000250/1989018 + (ML17347B190)
- L-89-254, Forwards June 1989 Select Sys Assessment Progress Summary, Per NRC 860812 Order + (ML17347B191)
- 05000250/LER-1989-011, :on 890617,two Safeguards Actuations Occurred. Caused by Damaged Switch Contact Blocks & Personnel Error. Switch Contact Blocks Replaced & Personnel Counseled + (ML17347B192)
- ML17347B193 + (ML17347B193)