Text
R
I
0 L7
S
D
D
SUBJECT:
Forwards Insp Repts 50-250/89-18
& 50-251/89-18
on
890331-0428
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Hept/Notice of Vio ation
esponse
NOTES
RECIPIENT
ID CODE/NAME
PD2-2
COPIES
LTTR ENCL
1
1
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
EDISON,G
INTERNAL: AEOD
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PQEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE LIEBERMAN,J
RE
LE
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
REGULATORY INFORMATION DISTRIBUTION S YSTEM (RIDS )
CESSION NBR:8906080254
DOC.DATE: 89/05/25
NOTARIZED: NO
DOCKET
CIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
05000251
AUTH.NAME
AUTHOR AFFILIATION
FREDRICKSON,P.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFXLIATION
WOODY,C.O.
Florida Power
& Light Co.
RNAL: LPDR
1
1
1
1
NRC
1
1
NOIE K) ALL "RIDS"
RECXPXENIS'LEASE
HELP US TO REDUCE WASTE!
CDNZACr 'IHE gXXJMEMZ CONIROL DMK
ROOM Pl-37
(EXZ. 20079)
TO ELZHZNATE YOUR NAME HKH DIST!GBUTIGH
LISTS FOR DOCUMEÃIS YOU DOH'T NEED!
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
iViAY 2 5
1989
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. C. 0.
'Aoody
Acting Senior Vice
President-Nuclear
Nuclear Energy Department
P.
0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS.
50-250/89-18
and 50-251/89-18)
This refers to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
R.
C.
Butcher
on
March
31,
1989
through April 28,
1989.
The
inspection
included
a review of activities authorized for your Turkey Point facility.
At
the
conclusion
of the
inspection,
the
findings
were
discussed
with those
members of your staff identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the
inspection
consisted
of selected
examinations
of procedures
and
repre'sentative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violation, with pertinent references
and elements
to be
included in your response,
is described
in the enclosed
Notice.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter
and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter
and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Original signed
by
Paul
Fredrickson,
Acting Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosures:
- = cj06C>S02
pbR
AOOCK
Ck
(See
Page
2)
~A'y'Cj~i2'=i
()gCIQ(.)g. iA
FDi
ZEot
Florida Power
and Light Company
MAY 25
1989
Encl osur es:
1.
2.
NRC Inspection
Report
cc w/encls:
K.
N. Harris, Vice President
Turkey Point Nuclear Plant
J.
E Cross,
Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant guality
Assurance
Superintendent
.
K.
W. VanDyne, Acting
Compliance Supervisor
bcc w/encl:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
Document Control
Desk
Y ~ '0,
we/
05/~89
RI
RCr enjak
05/@//89