ML17347B091
| ML17347B091 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/11/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B092 | List: |
| References | |
| CAL-89-01, CAL-89-1, NUDOCS 8904200213 | |
| Download: ML17347B091 (2) | |
Text
gC CE1Z PXTED Dl~ TKBUT30%
DEMONSTF.'XT10%
SYPrZg REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:8904200213 DOC.DATE: 89/04/11 NOTARIZED: NO DOCKET FAC1L:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant., Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION EBNETER,S.D.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Forwards Exam Rept 50-250/OL-89-01 administered during wks of 890313
& 20.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR
(
ENCL L SIZE:
TITLE: Operator Licensing Examination Reports I
NOTES'ECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME EDISON,G NRR SHANKMAN,S NRR DL~ OLB 10 02 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1
.S NOTE 'IO ALL "RIDS" RECZPXENIS
~ REDUCE ~~
COl'IA~~ DOCU~+ ~ECOL D~y RXYi Pl-37 (E3Z.
20079)
KO ELIlGRQ'E YOUR NAME~ DISTljZPgZgON LISTS FOR DOCUHENI'S YOU DON'T NEEDf D
D, TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 12 1
April 11, 1989 Florida Power and Light-Company ATTN:
Nr.
M. F.
Conway Senior Yice President Nuclear Energy Department P.
0.
Box 14000 Juno
- Beach, FL 33408 Gentlemen:
SUBJECT:
TURKEY POINT REQUALIFICATION EXAMINATION REPORT -
50-250/OL-89-01'3 1989 and Te aminis e
h NRC d
t red examinations dur ing the weeks of March 3,
Narch 20,
- 1989, to employees of your company who currently o
hold licenses to e the Turke Point. Nuclear Plant.
At the conclusion of the site visit, d'
th those members of your staff identified preliminary findings were iscusse wi in the Examination Report, Enclosure 1.
A table summarizing the examination results for ea x
ch e amined individual is provided in Enclosure 2.
Copies of the written examination and answer key are inc luded in this report-as Enclosure 3.
Re ualification Program Evaluation Report is included as Enclosure 4.
This rt finds that the Turkey Point Requalification Program remains t
d t th findings in the Evaluation unsatisfact or Your attention is invi e o
e Report hich ind'cate weaknes and training and evaluation of licensed operators.
s s
a e
in of Action Letter, ese 89 01 th areas must be addressed in a corrective action plan which is to be presented to the NRC by May 1, 1989.
A Simulator Fidelity Report is provided in this report as Enclosure 5.
In accordance with 10 CFR 2.790(a),
a copy of this letter and Enclosures 1, 3, b
l d in the NRC's Public Document Room.
Enclosure 2 is exempt from public disclosure. pursuant to 10 CFR 2.790(a) a a) and will not be sent to the Public Document Room.
Should you, have any questions concerning this letter, please contact us.
Sincerely, (original signed by S.
Ebneter)
Stewart D. Ebneter Regional Administrator
Enclosures:
{See Page 2) gag)4-q)UZI=: 8:r04i 1 PER A1ivCV Oci()OO-~a.)
V F riC