Forwards Insp Repts 50-250/89-24 & 50-251/89-24 on 890429-0526 & Notice of Violation.Attention Directed to Unresolved Items
ML17347B163
Person / Time
Site: Turkey Point  
Issue date: 06/28/1989
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B164 List:
References
NUDOCS 8907120294
Download: ML17347B163 (3)


See also: IR 05000250/1989024

Text

gc CP~RATH)

'31STKSU'EON

DEMO?CASTRATION

SYSTEM

SUBJECT:

Forwards Insp Repts

50-250/89-24

& 50-251/89-24

on

890429-0526

& notice of violation.

SIZE: tk

DISTRIBUTION CODE: IE01D

COPIES

RECEIVED:LTR

ENC

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio atio

NOTES:

Response

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~

~

CCESSION

NBR: 8907120294

DOC. DATE: 89/06/28

NOTARIZED:

NO

DOCKET

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

05000250-

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C'5000251

AUTH.NAME

AUTHOR AFFILIATION

REYES,L.A.

,

Region 2, .Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

R

WOODY,C.O.

Florida Power

& Light Co.

RECIPIENT

ID CODE/NAME

PD2-2

PD

COPIES

RECIPIENT

LTTR. ENCL,

ID CODE/NAME

1

1

EDISON,G

COPIES

LTTR ENCL

1

1

D

INTERNAL: AEOD

, AEOD/TPAD

NRR SHANKMAN;S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OE LLBBB

,J

R

G

02

R

FILE

01

TERNAL: . LPDR

NSIC

1

1

1

1

1

1

1

1

1

1

1

1

1

1.

1

'

1

1

1

1

1

1

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

NRC PDR

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1'.

'

1

S

R

I

Sj

NZK 'IO ALL RIDS" RECIXKMS:

PIZASE HELP US M REDUCE MAPZB.'XHIMT'IHE DOCUMEÃZ CDNZROL DESKS

LISTS FOR DO(XlMEMXS VXJ DCN~T NEED)

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

gUN 28

$989

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Acting Senior Vice President-Nuclear

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

.

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-250/89-24

AND 50-251/89-24)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

C. Butcher

on April 29,

1989 through

May 26,

1989.

The inspection

included

a review of activities

authorized

for your

Turkey Point facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selected

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection findings indicate that certain activities appeared

to violate

NRC requirements.

The violation with pertinent references

and elements

to be

included in your response,

are described

in the enclosed

Notice of Violation.

\\

Your attention is invited to the unresolved

items identified in the inspection

report.

These matters will be pursued during future inspections.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and

B'udget

as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosures:

(See

page

2)

Original signed

by

Luis A. Reyes, Director

Divison of Reactor Projects

8907120294

890628

PDR

ADOCK 0 0002

0

PDC

Florida Power and Light Company

JUN

2 8

1989

Enclosures:

1.

Notice of Violation

~

2.

NRC Inspection

Report

cc w/encls:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

J.

E Cross,

Plant Manager

Turkey Point Nuclear Plant

L. W. Bladow, Plant guality

Assurance

Superintendent

E. Lyons, Acting Regulatory

and Compliance Supervisor

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

Document Control

Desk

KPOERTNER: tj

JCPTenjak

~4 5~<0~

06/'28/89

06+/Se