ML17347B186
| ML17347B186 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 07/13/1989 |
| From: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8907210168 | |
| Download: ML17347B186 (3) | |
Text
AC CELEBRATED D1-'~~BUTTON DEMONSTOL,Tlat LYSI'Eg
~
~
ACCESSION NBR FACII:50-000 50-250 50-251 50-335 50-389 AUTH.NAME GIBSON,A.F.
RECIP.NAME WOODY,C.O.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
- 8907210168 DOC. DATE: 89/07/13 NOTARIZED: NO Generic Docket,.:--
Turkey Point Plant, Unit 3, Florida Power and Light C
!Turkey'oint Plant','.Unit 4, Florida Power'.aad Light C
- St;; Lucie,Plant,; Unit,, 1, Florida Power &i9ight.'gOZI,;.,
.-St;. Lucie Plant, Unit-.2, Florida Power
& Light Co.
AUTHOR AFFILIATION Region '2, Ofc of the Director RECIPIENT AFFILIATION Florida Power
& Light Co.
SUBJECT:
Advises that Rev 15 to QA Program consistent w/provisions
- of...10CFR50,App B
& acceptable....
I DISTRIBUT'ION CODE'EOID COPIES RECEIVED:LTR g ENCL 6 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOCKET 05000000 05000250 05000251 05000335 R
05000389 I
D 8/
RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D EXTERNAL: LPDR
'SIC COPIES LTTR E 1
1 2
1 1
1 1
2 1
11' 1
CL RECIPIENT ID CODE/NAME EDISON,G AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 QE-
-EB RMANjJ
, REG-FX-02 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1..
1 1
1 1
1 1
1 D
R I
RIDS PP)QIPIIi~ ~
PZZASE HELP US TO REX'ASTE.
CGKMT 'IHE DOQ3MEÃI,'XNZRDL DESK,
,RtXM Pl-37 (EXT. 20079) m EXiDGMUS KKR NAME PKN DISTR LISTS FOR DOCUMENTS KRJ DGH'T NEEDf TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL D
D S
July 13, 1989 Docket Nos.
50-250, 50-251, 50-335 and 50-389 Florida Power and Light Company ATTN:
Mr. C. 0. Woody, Acting Senior Vice President
.- Nuclear P.
0.
Box 14000 Juno
- Beach, FL 33408-0420 Gentlemen:
SUBJECT:
ACCEPTANCE OF CHANGE TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM (FPL TQAR 1-76A)
FOR FLORIDA POWER AND LIGHT FOR ST.
LUCIE UNITS 1
AND 2 AND TURKEY POINT UNITS 3 AND 4 We have reviewed, the changes addressed in Revision 15 of the Quality Assurance (QA) program description for Florida Power and Light - St.
Lucie Units 1
and 2
and Turkey Point Units 3 and 4.
Our review of the FPL QA program included the following material:
QA Program
Description:
Commitments to Regulatory Guides:
Scope:
St. Lucie Turkey Point This review indicates that FPL TQAR 1-76A
(
10 CFR 50, Appendix B requirements and its t
Any questions you may have concerning this F.
Jape of my staff on 404/331-4182.
Topical 1-76A Topical 1-76A Appendix C
FSAR Section 3.2. 1 Amendment 4
FSAR Section 1..9 Revision 6
Revision
- 15) continues to satisfy therefore acceptable.
review should be directed to Sincerely, (ORIGINAL SIGNED BY E. M. MERSCHOFF FOR) cc:
D. A. Sager, Vice President St. Lucie Nuclear Plant G. J. Boissy, Plant Manager J.
B. Harper, QA Superintendent J.
S.
Odom, Vice President Turkey.Point Nuclear Plant J. Cross, Plant Manager L.
W. Bladow, Plant QA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor State of Florida bcc:
(See Page 2)
":S 072> 0 i C a S >07<
='DR ADGCK 05000.50 PBY:
Albert F. Gibson, Director Division of Reactor Safety l/o
Florida Power and Light Company July 13, 1989 bcc:
NRC Resident Inspector - Turkey Point NRC Resident Inspector - Sg. Lucie G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR U)ectment Control RI I: DRS R oore 07/(i /89 RII:DRS FJ p
07/~1 /89 R)1+0 TPeebles 07/ll /89