Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342B285 + (ML17342B285)
- ML17342B286 + (ML17342B286)
- ML17342B287 + (ML17342B287)
- L-88-183, Forwards Monthly Operating Repts for Mar 1988 & Corrected Feb 1988 Unit Shutdowns & Power Reductions Rept for Unit 4. Corrected Rept Provides Info on Outage That Was Omitted from Original Rept + (ML17342B288)
- ML17342B289 + (ML17342B289)
- ML17342B290 + (ML17342B290)
- ML17342B291 + (ML17342B291)
- ML17342B294 + (ML17342B294)
- ML17342B296 + (ML17342B296)
- L-88-185, Responds to Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Surveillance Procedures 3/4-OSP-075.6 & 3/4-OSP-075.7 Revised to Correct Discrepancies in Consumption Rates + (ML17342B297)
- ML17342B298 + (ML17342B298)
- ML17342B300 + (ML17342B300)
- ML17342B301 + (ML17342B301)
- 05000250/LER-1988-004, :on 880318,auxiliary Feedwater Pumps Actuated Due to Drop in Steam Generator Level.Caused by Reactor Control Operator Failure to Monitor Steam Generator Level. Operator Counseled Re Awareness of Actions + (ML17342B302)
- IR 05000250/1988003 + (ML17342B304)
- ML17342B305 + (ML17342B305)
- ML17342B307 + (ML17342B307)
- ML17342B313 + (ML17342B313)
- ML17342B316 + (ML17342B316)
- ML17342B319 + (ML17342B319)
- ML17342B323 + (ML17342B323)
- ML17342B325 + (ML17342B325)
- ML17342B326 + (ML17342B326)
- ML17342B328 + (ML17342B328)
- ML17342B329 + (ML17342B329)
- ML17342B343 + (ML17342B343)
- ML17342B386 + (ML17342B386)
- ML17342B388 + (ML17342B388)
- ML17342B404 + (ML17342B404)
- ML17342B409 + (ML17342B409)
- IR 05000445/2017404 + (ML17342B410)
- ML17342B415 + (ML17342B415)
- ML17342B421 + (ML17342B421)
- ML17345A014 + (ML17345A014)
- ML17345A046 + (ML17345A046)
- ML17345A052 + (ML17345A052)
- ML17345A055 + (ML17345A055)
- ML17345A091 + (ML17345A091)
- ML17345A113 + (ML17345A113)
- IR 05000250/1988005 + (ML17345A123)
- L-88-192, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Gauges to Be in Svc During Off Normal/Emergency Condition Instead of Being Isolated & Procedure Onop 0208.11 Revised + (ML17345A124)
- ML17345A127 + (ML17345A127)
- ML17345A130 + (ML17345A130)
- L-88-203, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Implementation of Plant Mods & Equipment Malfunction. Compensatory Measures Implemented as Applicable + (ML17345A132)
- L-88-207, Responds to NRC 871030 Request for Licensee Plan for Complying w/10CFR50,App G,Section V.C Re Fracture Toughness Requirements & Recommendations That Util Surveillance Program Revised & Integrated Analysis Provided + (ML17345A133)
- ML17345A134 + (ML17345A134)
- L-88-127, Requests Extension of Issuance of Revised Engineering Evaluation for Unit 3 to 2 Months Following 4 Month Performance Test of Component Cooling Water HX Continuous Tube Cleaning Sys + (ML17345A135)
- 05000251/LER-1988-004-02, :on 880408,Tech Spec Table 3.5-2 Requirements Exceeded.Caused by Failure of Relays 327TX/4A2 & 327TX/4A2 in Undervoltage Protection Scheme for 4A 480 Volt Load Ctr. Relays Replaced & Tested + (ML17345A136)
- L-88-190, Rev 1 to Turkey Point Plant Unit 3 Cycle XI Startup Rept + (ML17345A137)
- ML17345A138 + (ML17345A138)
- ML17345A140 + (ML17345A140)