- ML17305A318 + (ML17305A318)
- ML17305A319 + (ML17305A319)
- ML17305A320 + (ML17305A320)
- ML17305A321 + (ML17305A321)
- PNO-V-89-060, on 891013,reactor Shut Down to Replace Two Potentially Counterfeit 400 Amp Switches in Class 1E 125-volt Distribution Sys & on 891015,startup Attempt Terminated.Reactor Shut Down for More than 48 H + (ML17305A322)
- ML17305A323 + (ML17305A323)
- IR 05000528/1989047 + (ML17305A325)
- ML17305A326 + (ML17305A326)
- ML17305A328 + (ML17305A328)
- ML17305A329 + (ML17305A329)
- ML17305A330 + (ML17305A330)
- PNO-V-89-062, on 891019,utils Senior Managers Met W/Natl Nuclear Accreditation Board to Discuss Accreditation Status of Plant Training Programs.Nine Programs Removed from Probation Status + (ML17305A332)
- ML17305A333 + (ML17305A333)
- ML17305A334 + (ML17305A334)
- ML17305A335 + (ML17305A335)
- 05000530/LER-1989-013-01, :on 890926,control Room Operator Inadvertently Turned Wrong Handswitch During post-maint Testing Which Resulted in ESFAS Actuation.Caused by Personnel Error. Disciplinary Measures Taken + (ML17305A337)
- ML17305A338 + (ML17305A338)
- ML17305A339 + (ML17305A339)
- ML17305A340 + (ML17305A340)
- ML17305A341 + (ML17305A341)
- ML17305A342 + (ML17305A342)
- ML17305A347 + (ML17305A347)
- ML17305A348 + (ML17305A348)
- ML17305A349 + (ML17305A349)
- ML17305A351 + (ML17305A351)
- ML17305A352 + (ML17305A352)
- 05000528/LER-1989-019, :on 890929,Train B of Fuel Bldg Essential Ventilation Actuation Sys Spuriously Actuated.Caused by Loose Connection Between Radiation Monitor Remote Indication & Control Unit Instrument Drawer & Cabinet + (ML17305A353)
- ML17305A354 + (ML17305A354)
- ML17305A355 + (ML17305A355)
- ML17305A356 + (ML17305A356)
- ML17305A358 + (ML17305A358)
- PNO-V-89-065, on 891031,reactor Trip Occurred.Facility Was Holding Power in Attempt to Resolve Problems in Plant Protection Sys Encountered During Power Ascension.Trip Was Uncomplicated & Did Not Require Emergency Classification + (ML17305A359)
- ML17305A360 + (ML17305A360)
- ML17305A363 + (ML17305A363)
- IR 05000528/1989046 + (ML17305A365)
- ML17305A366 + (ML17305A366)
- ML17305A367 + (ML17305A367)
- IR 05000528/1989044 + (ML17305A369)
- ML17305A371 + (ML17305A371)
- ML17305A372 + (ML17305A372)
- 05000528/LER-1989-006-01, :on 890731,containment Purge Isolation Actuation Signal Initiated Due to Loss of Power to Panel 1E-PNB-D26.Cause Not Identified.Power Restored & Radiation Monitor RU-38 Placed Back on Line + (ML17305A373)
- ML17305A374 + (ML17305A374)
- ML17305A376 + (ML17305A376)
- IR 05000528/1989036 + (ML17305A377)
- ML17305A378 + (ML17305A378)
- IR 05000528/1989041 + (ML17305A380)
- 05000528/LER-1989-015, :on 890901,phase B Shunt Reactor on Devers Transmission Line Failed,Causing Ground Fault on 500 Kv Line & Release of Large Vol of Oil & Fire.Caused by Failure of Winding to Bushing.Fire Extinguished + (ML17305A382)
- ML17305A383 + (ML17305A383)
- ML17305A384 + (ML17305A384)
- ML17305A385 + (ML17305A385)
- IR 05000529/1989030 + (ML17305A386)