Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A518 + (ML17290A518)
- 05000397/LER-1993-024, :on 930615,ESG Actuation of Containment Instrument Air Backup Nitrogen Bottle Programmer Occurred. Caused by Personnel Error & Procedure Deficiency.Test Procedures to Be Strengthened + (ML17290A520)
- 05000397/LER-1993-025, :on 930615,Group 1 Nuclear Steam Supply Shutoff Sys Isolation Occurred During Performance of TS Surveillance Test on Turbine Throttle Valves.Caused by Procedure Deficiency.Procedure Changed + (ML17290A521)
- ML17290A522 + (ML17290A522)
- IR 05000397/1993027 + (ML17290A524)
- ML17290A525 + (ML17290A525)
- ML17290A526 + (ML17290A526)
- GO2-93-126, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-01.Corrective Actions:Per Was Written to Document Concerns Raised Re SE-V-12A & SW-V-12B + (ML17290A528)
- GO2-93-156, Special Rept:On 930503,space Frame & Attached Seismic Triaxial Peak Accelorograph (SEIS-TPA-1) Removed to Allow for Refueling of Reactor Core.Instrument Returned to Svc on 930607 + (ML17290A530)
- 05000397/LER-1993-026, :on 930619,failed to Complete Weekly Battery Surveillance Requirements within Allowed TS Interval Due to Scheduling Oversight.Initiated & Completed PPM 7.4.8.2.1.20 + (ML17290A531)
- GO2-93-188, Amends 921223 Response to Violations Noted in Insp Rept 50-397/92-35.Corrective Actions:Update to ODCM to Reflect Results of 10CFR50.59 Analysis to Permit Operation of Turbine Bldg Will Be Completed by 930831 + (ML17290A532)
- GO2-93-186, Forwards Change to ERDS Data Point Library,Consisting of Ref File Re Rx Bldg high-range Monitor + (ML17290A533)
- GO2-93-189, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-19.C/As:PPM 1.3.18 Will Be Revised to Provide Consistent Directions on How to Log Items in Sufficient Detail for Purposes of Identification + (ML17290A537)
- ML17290A538 + (ML17290A538)
- ML17290A539 + (ML17290A539)
- IR 05000397/1993022 + (ML17290A541)
- GO2-93-397, Responds to NRC Bulletin 93-003.Requests That Scheduled Date for Implementation of Bulletin Be Extended from 930730-0915 + (ML17290A544)
- GO2-93-196, Advises of Changes Util Made in Schedule to Improve Corrective Action Program.Description of Commitments & Corresponding Revised Completion Date or Completion Status Listed in Encl + (ML17290A545)
- GO2-93-193, Informs That Effective 930625,JH Swailes Assumed Responsibilities of Plant Manager at Facility.Requests That NRC Distribution List for Facility Correspondence Be Revised to Show Jh Swailes as Plant Manager + (ML17290A547)
- GO2-93-191, Application for Amend to License NPF-21,requesting Change to Refueling Platform Load Limits by Adding New Values Resulting from Installation of Upgraded Refueling Mast (GE Model NF500) + (ML17290A548)
- ML17290A549 + (ML17290A549)
- ML17290A550 + (ML17290A550)
- GO2-93-195, Submits Special Notice of Change to Washington Nuclear Plant Units 1 & 2 Emergency Preparedness Plan (Epp).Change Deletes Crisis Mgt Ctr & Administrative Support Staff Listed in Section 10.4.1 of EPP + (ML17290A551)
- GO2-93-198, Amends 930426 Response to Violation Noted in Insp Rept 50-397/92-41 Re Disposal of Cooling Tower Sediments.Util Denies Violation.Clarification of Corrective Actions Stated in Listed + (ML17290A552)
- ML17290A553 + (ML17290A553)
- ML17290A554 + (ML17290A554)
- GO2-93-169, Notifies That MOU for Emergency Preparedness Between Util & State of Wa Finalized & Signed.Copy of MOU Encl + (ML17290A555)
- ML17290A558 + (ML17290A558)
- ML17290A560 + (ML17290A560)
- GO2-93-199, Responds to NRC Concerns Re Plant Specific Deviation from Generic BWROG Dwl Spray Initiation Limit Curve (Design Deviation 17),per EOPs + (ML17290A561)
- ML17290A564 + (ML17290A564)
- ML17290A565 + (ML17290A565)
- ML17290A567 + (ML17290A567)
- GO2-93-205, Forwards Revised Response to GL 89-10,Suppl 3, Safety Related MOV Testing & Surveillance. Response to GL 89-10, Suppl 5 & Summary of Activities Initiated & Completed Since NRC Insp Rept 50-397/91-16 Also Encl + (ML17290A568)
- ML17290A569 + (ML17290A569)
- GO2-93-208, Monthly Operating Rept for Jul 1993 for WNP-2.W/undated Ltr + (ML17290A571)
- ML17290A574 + (ML17290A574)
- ML17290A576 + (ML17290A576)
- ML17290A577 + (ML17290A577)
- ML17290A578 + (ML17290A578)
- ML17290A580 + (ML17290A580)
- ML17290A581 + (ML17290A581)
- IR 05000397/1993026 + (ML17290A583)
- GO2-93-213, Forwards Supply Sys Fitness for Duty Semiannual Performance Data Rept for 930101-0630 Per 10CFR26.71(d) + (ML17290A584)
- GO2-93-217, Forwards Response to Generic Ltr 89-10 & Suppls, Safety- Related Motor-Operated Valve Testing & Surveillance, Per 930809 Submittal.Summary of Activities Initiated & Completed Since Insp Rept 50-397/91-16 Also Encl + (ML17290A587)
- 05000397/LER-1993-014, :on 930803,discovered Inadequate Backup Overcurrent Protection for Containment Penetrations Due to Inadequate Design Analysis Using Inaccurate & Incomplete Documentation.Changed Plant Procedure + (ML17290A589)
- GO2-93-218, Amended Response to NRC Re Violations Noted in Insp Rept 50-397/93-201.Corrective Actions:Level 1 Root Cause Analysis on Procedural Adherence Will Be Completed 931031 + (ML17290A590)
- ML17290A592 + (ML17290A592)
- ML17290A593 + (ML17290A593)
- GO2-93-230, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-20.C/As:all Remaining Applicable Maint Surveillance Procedures Reviewed & Revised to Ensure That drywell-to-wetwell TS Bypass Leakage Limits Not Challenged + (ML17290A595)
- ML17290A596 + (ML17290A596)