Forwards Insp Repts 50-397/93-18 & 50-460/93-01 on 930511-0621.Eleven Examples of Apparent Violations Noted & Are Being Considered for Escalated Enforcement
ML17290A565
Person / Time
Site: Columbia, Washington Public Power Supply System  
Issue date: 07/27/1993
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290A566 List:
References
EA-93-191, NUDOCS 9308160056
Download: ML17290A565 (6)


See also: IR 05000397/1993018

Text

g+S IIKQQ

fp

~4

0

~y

n

C

O

I

Vk

0~

+**++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIAS4596-5368

SlJL

2 't

$ 993

Docket Nos.

50-397,

50-460

License

No. NPF-21; Construction

Permit No.

CPPR-134

EA 93-191

Mashington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Hr . J.

V. Parrish, Assistant

Hanaging Director for Operations

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-397/93-18,

50-460/93-01

This refers to the inspection conducted

by Hessrs.

R.

C. Barr,

D. L. Proulx,

and

W. L. Johnson of this office on Hay 11 through June

21,

1993,

and Hessrs.

K. E. Johnston,

D. E. Corporandy,

and S.

P.

Sanchez of this office on Hay 3

through 14,

1993, of activities at Washington Nuclear Project

No.

2

(WNP-2)

authorized

by NRC Operating License

No. NPF-21;

and by Hessrs.

K. E. Johnston,

W. L. Johnson,

and S.

P.

Sanchez of this office on Hay ll, 1993, of your

activities at .Mashington Nuclear Project No.

1

(WNP-1) authorized

by

Construction Permit No. CPPR-134;

and to the discussions

of findings held by

the inspectors with Hessrs.

J. Swailes

and

G. Hansen

and other members of the

Supply System staff at the conclusion of these

inspections.

Areas examined during these

inspections

are described

in the enclosed

inspection report.

Mithin these

areas,

the inspections

consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,'nd

observations

by the inspectors.

Based

on the results, of the inspection at WNP-2, eleven

examples of apparent

violation were identified,

and are being considered for escalated

enforcement

.

in accordance

with the "General

Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy),

10 CFR Part 2, Appendix C.

These

instances

of apparent violation involved failures to follow procedures

regarding:

the use of a calibrated

instrument for testing,

evaluation of

substitute

components

procured for a safety-related

system,

control of locked

valves, radiation protection activities, fire protection impairments,

refueling procedure quality and adherence,

performance of as-found local leak

rate testing,

approval of operator overtime,

and failure to follow procedures

for implementing design

change

packages.

We note that three of these

items

were identified by your staff.

In view of the escalated

enforcement

being considered,

a Notice of Violation

is not presently

being issued for these

inspection findings.

In addition,

please

be advised that the number

and characterization

of the apparent

violations described

in the enclosed

inspection report

may change

as

a result

of further

NRC review.

93081b005b

930727

PDR

ADOCK 05000397

6

PDR

Your performance

during the

RS refueling outage is discussed

in Paragraph

8 of

the enclosed report.

Although your performance

during this outage

improved

over previous outages,

we continue to be concerned with the number of

procedure

adherence

problems

and with the Supply System's

overall performance

in the area of Radiological Controls.

The inspection report also discusses

in

Paragraph

12 our review of Licensee

Event Report

(LER) No. 91-13, which

reported several significant problems identified by your surveillance

program

improvement initiative.

Although we find your corrective actions related to

these

issues to be appropriate,

we encourage

you to continue your pursuit of

this initiative to improve the quality and performance of your surveillance

procedures.

An enforcement

conference

to review the apparent violations will be scheduled

in the near future. 'he purposes of this conference will be to discuss

the

apparent violations, their causes

and safety significance; to provide you the

opportunity to point out any errors in our inspection reports;

to provide

an

opportunity for you to present your proposed corrective actions;

and to

discuss

any other information that will help us determine the appropriate

enforcement action in accordance

with the Enforcement Policy.

You will be

advised

by separate

correspondence

of the results of our deliberations

on this

matter.

No response

regarding these

apparent violations is required at this

time.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room,

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosure:

- K. E. Perkins, Director

Division of Reactor Safety

~

and Projects

Inspection

Report Nos. 50-397/93-18

and 50-460/93-01

CC:

Mr. Warren A. Bishop,

Chairman,

Energy Facility Site Evaluation Council

Chairman,

Benton County Board of Commissioners

M. H. Philips,.Jr.,

Esq.,

Winston

5 Strawn

cc (less report attachments):

Mr. J.

H. Swailes,

WNP-2 Plant Manager

G.

E.

C. Doupe,

Esq.,

WPPSS

Mr. Alan G. Hosier, Licensing Manager,

WPPSS

Mr. G. C. Sorensen,

Manager,

Regulatory

Programs,

WPPSS

bcc

v/copy of enclosure:

Dock t File

Project Inspector

Resident

Inspector

J. Clifford, NRR

JUL 2.7

1S93

bcc w/copy of enclosure

(less report attachments)

B. Faulkenberry

R.

Huey

C. VanDenburgh

P.

Johnson

J.

Lieberman,

OE

G.

Cook

S. Richards

R. Jones,

RSB,

NRRi(OWFN 8-E-23)

(Cover Page

and Paragraph

6)

bcc w/o enclosure:

M. Smith

J. Bianchi

J. Zollicoffer

REGION V

W ohnson

7/

/93

DProulx

7/

/93

w.P

RBarr

DMrporandy

KJohnston

7/

/93

7/

/93

7/

/93

P

on

J

CVanDenburgh

SRichards

7/2/

3

93

7/

/93

7/

/93

5.b

9

EST

COPY ] RE(VEST

Y ]

REQUEST

COPY ] REQUEST

COPY

S'O

Y S

0

YES

0

Y S

NO

7/A+93

EST

COPY

E

NO

KPerkins

7/

/93

File Locati on:

G: (PS1)W2-93-18. PHJ

JUL

2

7

993

bcc w/copy of enclo

res:

Docket File

Project Inspecto

Resident

Inspe

or

B. Faulkenber y

R.

Huey

C.

VanDenb

gh

P. Johns

J. Clif rd,

NRR

G.

Coo

S.

Ri hards

R. J nes,

RSB,

NRR

(OMFN 8-E-23)

(Cover Page

and Paragraph

)

bc

w/enclosure I:

Smith

. Bianchi

J. Zollicoffer

REGION V

N

on

/'g ro

x

a

/(

93

M7/(g 93

~

7/I4/93

DC

porandy

KJoh

7/]f/93

7/i4/9

ton

3

ES

ES

NO

0

YES

'O

YES

NO

P7/lg

uey

7/

9

CVanD n

7/g /9

eese

7/

9

YE

0

Y

NO

S

NO

S

N

ES

NO

Fi 1 e Location:

G: )PSI)M2-93-1S. PHJ