Docket No. 50-397 July 28, 1993
'r. J.
V. Parrisn (Hsai', Drop.1023)
Assistant Managing Director, C;",erations Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968
Dear Hr. Parrish:
SUBJECT:
CLOSEOUT OF NRCB 92-01, SUPPLEMENT 1, "FAILURE OF THERMO-LAG 330 FIRE BARRIER SYSTEM" (TAC NO. H83950)
By letter dated September 28,
- 1992, you provided 'a response to NRC Bulletin 92-01 for WNP-2.
Your response stated that you had identified all areas with 1-or 3-hour Thermo-Lag 330 fire barrier material, and that these ar'eas had been placed on a one-hour fire watch tour.
After extensive discussion with the NRC staff, your letter dated April 13, 1993, provided in response to Generic Letter (GL) 92-08, identified the Thermo-Lag 330 fire barriers as inoperable.
In addition, you described your long-term corrective action program to ensure or restore operability.
This long-term corrective action involves your participation in the NUMARC Thermo-Lag Test Program.
This additional information satisfactorily completes your response to NRCB 92-01, and TAC M83950 is considered closed.
All further review of the Thermo-Lag issue, including implementation of corrective actions, will be conducted under our evaluation of your response to GL 92-08 (TAC H85624).
This review will consider the additional information provided in your June 23, 1993 letter that revised your original response to GL 92-08, including an assessment of the acceptability of the scope and schedule of your proposal for identification of additional Thermo-Lag installations at WNP-2.
Sjqcerely, OngInal signed by James W. Clifford, Senior Project Hanager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
Docket File JRoe DFoster-Curseen CBerlinger
- KPerkins, RV NRC
& Local PDRs EAdensam JClifford
P315
- See Previous Concurrence OFFICE LA:PDV DR PH:PDV:DR W
BC:SPLB*
BC:EELB D:PDV:DRPW HANE DFoster-C 'erP JCli rd CMcCracken CBerl'r Tguay DATE 7
93 7 7193 7 20 93 93 7 i~93 OFFICIAL RECORD COPY DOCUMENT NA E:
WNP83950.RES 9308i70423 930728 PDR ADOCK 05000397, C
~g pre@ IVER% ~'
t,dl l
Q
+ gpR 4EGy~
0 Cy nO I
+
~
0 Wp*y4 t
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Ouly 28, 1993 Docket No. 50-397 Hr. J.
V. Parrish (Hail Drop 1023)
Assistant Hanaging Director, Operations Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968
Dear Hr. Parrish:
SUBJECT:
CLOSEOUT OF NRCB 92-01, SUPPLEHENT 1, "FAILURE OF THERHO-LAG 330 FIRE BARRIER SYSTEH" (TAC NO. H83950)
By letter dated September 28,
- 1992, you provided a.response to NRC Bulletin 92-01 for WNP-2.
Your response stated that you had identified all areas with 1-or 3-hour Thermo-Lag 330 fire barrier material, and that these areas had been placed on a one-hour fire watch tour.
After extensive discussion with the NRC staff, your letter dated April 13, 1993, provided in response to Generic Letter (GL) 92-08, identified the Thermo-Lag 330 fire barriers as inoperable.
In addition, you described your long-term corrective action program to ensure or restore operability.
This long-term corrective action involves your participation in the NUHARC Thermo-Lag Test Program.
This additional information satisfactorily completes your response to NRCB 92-01, and TAC H83950 is considered closed.
All further review of the Thermo-Lag issue, including implementation of corrective actions, will be conducted under our evaluation of your response to GL 92-08 (TAC H85624).
This review will consider the additional information provided in your June 23, 1993 letter that revised your original response to GL 92-08, including an assessment of the acceptability of the scope and schedule of your proposal for identification of additional Thermo-Lag installations at WNP-2.
Sincerely, James W. Clifford, Senior Project Hanager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
See next page
Docket, No. 50-397' Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System 3000 George Washington Way P. 0.
Box 968
- Richland, Washington 99352
Dear Hr. Sorensen:
SUBJECT:
CLOSEOUT OF NRCB 92-01, SUPPLEMENT 1, "FAILURE OF THE i 0-LAG 330 FIRE BARRIER SYSTEM" (TAC NO: M83950)
By letter dated September 28,
- 1992, you provided a respons to NRC Bulletin 92-01 for WNP-2.
Your response stated that you had iden fied all areas with 1-or 3-hour Thermo-Lag 330 fire barrier material, and at these areas had been placed on a one-hour fire tour.
After extensive discussion with the NRC staff, you letter dated April 13, 1993, provided in response to Generic Letter (GL) 92-08, identified the Thermo-Lag 330 fire barriers as inoperable.
In ddition, you described your long-term corrective action program to ensure r restore operability.
This long-term corrective action involves your pa icipation in the NUHARC Thermo-Lag Test Program.
This additional informa on satisfactorily completes your response to NRCB 92-01, and TAC H83950 is onsidered closed.
All further review of the Thermo-Lag issue, includi implementation of corrective actions, will be conducted under our e
luation of your response to GL 92-08 (TAC H85624).
This review will consi er the additional information provided in your June 23, 1993 letter that r ised your original response to GL 92-08, including an assessment of the acc tability of the scope and schedule of your proposal for identification of ad itional Thermo-Lag installations at WNP-2.
Sincerely, James W. Clifford, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation CC:
See next page DISTRIBUTION:
Docket File JRoe DFoster-C, seen CBerling KPerki RV NRC 8 Local PDRs EAdensam JClifford
P315 LA:PDV DRPW PH:P
- DRPW
.sC
'BC:EELB D:PDV:DRPW DFoster-Curseen 7
93 OATE OFFICIAL RECORD COPY JClifford 7 P 93 CBerlin er TQuay CHcCracken 7
93 7
93 7
93 DOCUMENT NAME:
WNP83950.RES
~ I J
5 C
d M
J I'