ML17290A560
| ML17290A560 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/21/1993 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| TAC-M85185, NUDOCS 9308110355 | |
| Download: ML17290A560 (5) | |
Text
Do".Ret No. 50-397
\\
Hr. J.
V. Parrish (Hail Drop 1023)
Assistant Managing Director, Operations
.Washii'igton Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0958 July 21, 1~
T
Dear Hr. Parrish:
SUBJECT:
REACTOR VESSEL MATERIAL SURVEILLANCE WITHDRAWAL SCHEDULE CHANGE REQUEST (TAC NO. H85185)
You requested, in a letter dated July 2, 1992, to modify the capsule withdrawal schedule for WNP-2.
Specifically, you requested that the reactor pressure vessel surveillance capsule No.
2 at 120 azimuth be put into
- standby, and surveillance capsule No.
3 at 30'e withdrawn at 24 EFPY.
The change was requested because capsule No. 2's basket had fallen off the holder sometime prior to the Hay 27, 1989 in-vessel examination, and shipped to General Electric so a new assembly could be made and reinstalled in the vessel.
The basket and new assembly were reinstalled during the 1991 outage.
During the 1992 outage, the other two specimen holders and the reinstalled specimen holder were observed with no indications or problems.
We have completed our evaluation of this change request, and find the requested change acceptable.
Our acceptance is based on the fact that surveillance capsule No.
2 missed some exposure, and substituting surveillance capsule No.
3 for withdrawal at 24 EFPY is consistent with the requirements of 10 CFR Part 50 Appendix H.
This completes our action on TAC No. M85185.
Sincerely, cc:
See next page
.Original signed by Theodore R. Quay, Director Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File JRoe JClifford
- ACRS, P315 (10)
NRC
& Local PDRs EAdensam DFoster-Curseen
- KPerkins, RV PDV Reading File TQuay
- OGC, 15818 OFC NAME DATE LA:PDV DRPW DFost r-Curse n
/93 PH:PDV:DRPW JC1 ice',"1: mc
/'Zf/93
':PDV:DRPW TQuay~l
/> /93 OFFICIAL RECORD COPY DOCUMENT NAME:
WNP85185.LTR E
9308ii0355.930724 PDR ADOC5 05000597 P
-"' 'DR~
k I
~
Tp 1
Q QfW< go Q
~y,8 RECy
~(~v 0*
1 o
~0
+>>*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555.0001 July 21, 1993 Docket No. 50-397 Mr. J.
V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0958
Dear Mr. Parrish:
SUBJECT:
REACTOR VESSEL MATERIAL SURVEILLANCE WITHDRAWAL SCHEDULE CHANGE REQUEST (TAC NO. M85185)
You requested, in a letter dated July 2, 1992, to modify the capsule withdrawal schedule for WNP-2.
Specifically, you requested that the reactor pressure vessel surveillance capsule No.
2 at 120'zimuth be put into
- standby, and surveillance capsule No.
3 at 30'e withdrawn at 24 EFPY.
The change was requested because capsule No. 2's basket had fallen off the holder sometime prior to the May 27, 1989 in-vessel examination, and shipped to General Electric so a new assembly could be made and reinstalled in the vessel.
The basket and new assembly were reinstalled during the 1991 outage.
During the 1992 outage, the other two specimen holders and the reinstalled specimen holder were observed with no indications or problems.
We have completed our evaluation of this change
- request, and find the requested change acceptable.
Our acceptance is based on the fact that surveillance capsule No.
2 missed some exposure, and substituting surveillance capsule No.
3 for withdrawal at 24 EFPY is consistent with the requirements of 10 CFR Part 50 Appendix H.
This completes our action on TAC No. M85185.
Sincerely, Theodore R. Quay, Director Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
See next page
Hr. J.
V. Parrish Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Hr. J.
H. Swailes WNP-2 Plant Hanager Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 G.
E.
C. Doupe, Esq.
(Hail Drop 396)
Washington Public Power Supply System 3000 George Washington Way P. 0.
Box 968
- Richland, Washington 99352-0968 Hr. Warren Bishop, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympia, Washington 98504-3172 Hr. Alan G. Hosier (Hail Drop PE20)
WNP-2 Licensing Hanager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Hr'.
G.
C. Sorensen (Hail Drop PE20)
Regulatory Programs Hanager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Haria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners P. 0.
Box 190
- Prosser, Washington 99350-0190 Hr. R.
C. Barr U. S. Nuclear Regulatory Commission P. 0.
Box 69
- Richland, Washington 99352-0968 H.
H. Philips, Jr.,
Esq.
Winston
& Strawn 1400 L Street, N.W.
Washington, D.C.
20005-3502
Ac C ~
~
r, I
a t