Text
s a
~
~
CONTROLLED COPY REFUELING OPERATIONS 3/4.9.6 REFUELING PLATFORH LIMITING CONOITION FOR OPERATION 3.9.6 The refueling platform shall be OPERABLE and used for handling fuel assemblies or control rods within the reactor pressure vessel.
APPLICABILITY:
Ouring handling of fuel assemblies or control rods within the reactor pressure vessel.
ACTION:
With the requirements for refueling platform OPERABILITY not satisfied, suspend use of any inoperable refueling platform equipment from opet:ations involving the handling of control rods and fuel assemblies within the reactor pressure vessel after placing the load in a safe condition.
SURYEILLANCE REQUIREMENTS 4.9.6 Each refueling platform crane or hoist used for handling of control rods or fuel assemblies within the reactor pressure vessel shall be demonstrated OPERABLE within 7 days prior to the start of such operations with that crane or hoist by:
a a k.
P'emonstrating operation of the overload cutoff on the main hoist~My the load assess/sos tvoo ( I'asn pe T rior.t
- /gnfocE.
Oemonstrating operation of the on the frame
+~ends.
P re'mr
- C.
Oemonstrating operation of the uptravel electrical stop on the frame mounted and monorail hoists when uptravel brings the top of active fuel assembly to 7 feet 6 inches below the minimum fuel storage pool water level.
d.
e.
g, WASHINGTON NUC Oemonstrating operation of the downtravel electrical cutoff on the main hoist when grapple hook down travel reaches 54 feet 2 inches below track (~554 inches as indicated).
c~<~<
b %re.
Oemonstrating operation of the slack cable cutoff on the~ain hoist when the load is
. t cY~oo IA<~>>d 7<T ""
s Demonstrating operation of the loaded interlock on the main hoist~ the load
. ~CcCleug erSO(S5+3 ~
S gal'(m<
Oemonstrating operation of the redundant loaded interlock on the main hoist~eR-the load sgx,ccdILl'h ~~<~9 prier 4
..t.),J..y..
4x, Z. ~.--L.>
mmo Aiorcsl 4;res
~r eiD r 4,
Ke ldasa.k i.xrtc hsapp lo sO LEAR - UNIT 2 3/4 9-8 i 9308050f54 930729 PDR ADOCK 05000397 P