Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17284A601 + (ML17284A601)
- GO2-88-225, Responds to Kirsch Request for Plans for Periodic Assessment of SALP Action Plan.Plan Will Be Part of Agenda for Quarterly Mgt Meeting,Tentatively Scheduled to Be Held on 870105 + (ML17284A606)
- ML17284A607 + (ML17284A607)
- ML17284A609 + (ML17284A609)
- ML17284A610 + (ML17284A610)
- ML17284A611 + (ML17284A611)
- ML17284A613 + (ML17284A613)
- GO2-98-082, Forwards Results of Linear Elastic Fracture Mechanics Analysis & ASTM A262 Practice E Test (Strauss Test) as Addl Info to 980416 Request for Amend to License NPF-21 + (ML17284A615)
- ML17284A617 + (ML17284A617)
- GO2-98-086, Informs That Noted Action Re Insp Rept 50-397/97-13 Was Completed on 980511 When Final Ack from off-site Member of Corporate Nuclear Safety Review Board Was Received + (ML17284A619)
- GO2-98-089, Responds to NRC Re Violations Noted in Insp Rept 50-397/98-05.Corrective Actions:Event Notification Was Made to NRC Upon Discovery That HPCS Injection Had Occurred Subsequent to 980311 Scram + (ML17284A620)
- GO2-98-088, Informs That Licensee Plans to Continue to Participate in Joint Owners Group MOV Periodic Verification Program as Member of Bwrog,In Response to GL 96-05 + (ML17284A621)
- GO2-98-087, Documents Util Outage Schedule Change & That Licensee Has Performed SE in Support of Current Outage Plan,Per 980416 Request for Amend Re ECCS Suction Strainers + (ML17284A622)
- GO2-98-090, Submits Amended Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (ML17284A625)
- ML17284A626 + (ML17284A626)
- ML17284A629 + (ML17284A629)
- ML17284A630 + (ML17284A630)
- ML17284A632 + (ML17284A632)
- ML17284A633 + (ML17284A633)
- ML17284A635 + (ML17284A635)
- ML17284A637 + (ML17284A637)
- IR 05000397/1998007 + (ML17284A638)
- ML17284A639 + (ML17284A639)
- ML17284A641 + (ML17284A641)
- 05000397/LER-1998-004, :on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 Circuit + (ML17284A642)
- ML17284A643 + (ML17284A643)
- ML17284A644 + (ML17284A644)
- ML17284A646 + (ML17284A646)
- GO2-98-093, Forwards Rev 0 to COLR 98-14, Cycle 14 Core Operating Limits Rept, for WNP-2 + (ML17284A647)
- ML17284A648 + (ML17284A648)
- ML17284A649 + (ML17284A649)
- ML17284A650 + (ML17284A650)
- ML17284A651 + (ML17284A651)
- ML17284A653 + (ML17284A653)
- GO2-98-092, Withdraws 970716 Request for Amend to TS Re Vessel Leak Testing,Based Upon Commitment Contained in Util Concerning Surveillance Matls Testing & Analysis Rept + (ML17284A654)
- 05000397/LER-1998-005, :on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of Limitation + (ML17284A655)
- ML17284A656 + (ML17284A656)
- PNO-IV-98-026A, on 980617,update to Internal Flooding Caused by Fire Water Sys Valve Rupture & Arrival of Augmented Insp Team Made.Team Provided Charter Which Will Be Placed in Pdr. Licensee Completed Dewatering Each of ECC Pump Rooms + (ML17284A657)
- PNO-IV-98-026B, on 980617,AIT Activities for Internal Flooding Caused by Fire Water Sys Valve Rupture & Termination of NOUE Update Made.Operation of Pumps Resulted in Rapid Reflood of Reactor Bldg Risers & Water Hammer + (ML17284A658)
- GO2-98-101, Provides Requested 30 Day Rept Re Insp of Reactor Core Shroud Welds for Indications of Stress Corrosion Cracking. Shroud Insp Requested by Has Been Completed + (ML17284A659)
- ML17284A660 + (ML17284A660)
- ML17284A662 + (ML17284A662)
- 05000397/LER-1998-008, :on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing Lines + (ML17284A664)
- 05000397/LER-1998-007, :on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review Event + (ML17284A665)
- ML17284A666 + (ML17284A666)
- GO2-98-107, Informs That DW Coleman Has Been Appointed Regulatory Affairs Manager & Records Should Be Corrected to Reflect Change + (ML17284A667)
- ML17284A668 + (ML17284A668)
- ML17284A669 + (ML17284A669)
- ML17284A670 + (ML17284A670)
- ML17284A671 + (ML17284A671)
- GO2-98-108, Submits Response to NRC Bulletin 96-03, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Vacuuming of Suppression Pool Scheduled During 1999 Refueling Outage. Licensee Maintains Foreign Matl Control Program + (ML17284A672)