Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17278A997 + (ML17278A997)
- ML17278A998 + (ML17278A998)
- ML17278B000 + (ML17278B000)
- GO2-86-859, Advises That GE Performed Independent Verification of Util Analysis Results of App R Calculation for Alternate Shutdown from Remote Control Room Utilizing Six Main Steam Safety Relief Valves.Rev 0 to Calculation NE-02-86-10 Encl + (ML17278B001)
- ML17278B002 + (ML17278B002)
- ML17278B003 + (ML17278B003)
- GO2-86-810, Semiannual Effluent Rept,Jan-June 1986 + (ML17278B006)
- ML17278B007 + (ML17278B007)
- ML17278B010 + (ML17278B010)
- IR 05000397/1986021 + (ML17278B013)
- GO2-86-822, Responds to NRC Re Violations Noted in Insp Rept 50-397/86-21.Corrective Actions:Supervisory Personnel Counseled Re Compliance W/Requirements of PPM 1.3.18, Tool & Equipment Accountability Around Open Plant Sys + (ML17278B015)
- ML17278B018 + (ML17278B018)
- ML17278B019 + (ML17278B019)
- ML17278B020 + (ML17278B020)
- ML17278B024 + (ML17278B024)
- IR 05000397/1986027 + (ML17278B026)
- ML17278B029 + (ML17278B029)
- GO2-86-945, Application for Amend to License NPF-21 Changing Tech Spec Section 3.8.4.2 to Remove Requirement to List Fuse Sizes & Test Fuses on Rotating 18-month Basis for Primary Containment Penetration Conductor Protective Devices + (ML17278B035)
- ML17278B036 + (ML17278B036)
- ML17278B037 + (ML17278B037)
- GO2-86-946, Informs That Remaining Oversize Drawings for Amend 37 to Fsar,Dtd 860922,will Be Forwarded by Middle of Oct.Delay Due to Publishing Difficulties + (ML17278B039)
- ML17278B042 + (ML17278B042)
- ML17278B044 + (ML17278B044)
- ML17278B045 + (ML17278B045)
- ML17278B046 + (ML17278B046)
- ML17278B047 + (ML17278B047)
- ML17278B048 + (ML17278B048)
- GO2-86-088, Forwards Addl Info Re Unresolved Items Mentioned in Insp Rept 50-397/86-12 & Discussed at 860828 Enforcement Conference.Unqualified Rosemount 1151 Pressure Transmitter & Limitorque Operator Documentation Discussed + (ML17278B050)
- ML17278B052 + (ML17278B052)
- IR 05000397/1986029 + (ML17278B054)
- ML17278B055 + (ML17278B055)
- ML17278B057 + (ML17278B057)
- ML17278B059 + (ML17278B059)
- IR 05000397/1986032 + (ML17278B061)
- ML17278B062 + (ML17278B062)
- GO2-86-981, Advises That Exxon Nuclear Completed Reanalysis of Facility Transients Using XCOBRA-T Model.Results of Previously Reported Analyses Performed Using Cotransa Hot Channel Method Encl + (ML17278B063)
- ML17278B064 + (ML17278B064)
- ML17278B066 + (ML17278B066)
- GO2-86-986, Requests That Relief Request ISI-2-002 Be Considered as Submitted in Inservice Insp Plan & That NRC Evaluation of Request PSI-2-003 Be Used as Addl Justification.Page from Re Staff Evaluation of PSI-2-003 Encl + (ML17278B067)
- ML17278B071 + (ML17278B071)
- ML17278B073 + (ML17278B073)
- IR 05000397/1986033 + (ML17278B075)
- ML17278B083 + (ML17278B083)
- ML17278B089 + (ML17278B089)
- ML17278B090 + (ML17278B090)
- ML17278B093 + (ML17278B093)
- ML17278B094 + (ML17278B094)
- ML17278B097 + (ML17278B097)
- ML17278B099 + (ML17278B099)
- ML17278B100 + (ML17278B100)
- ML17278B101 + (ML17278B101)