Forwards Insp Rept 50-397/86-32 on 860901-1004.No Violations Identified
ML17278B059
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/21/1986
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278B060 List:
References
NUDOCS 8611050037
Download: ML17278B059 (4)


See also: IR 05000397/1986032

Text

Docket No. 50-397/@Q

Washington Public Power Supply System

P.

O.

Box 968

Richland,

Washington

99352

'ttention:

Hr.

G.

C. Sorensen

Manager of Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

R. Dodds

and R. Barr of

this office during the period of September

1 - October 4,

1986, of activities

authorized

by NRC Operating License No. NPF-21,

and to the discussions

of

findings held by the inspectors with Messrs.

D. Mazur, J. Hartin,

C. Powers,

and other members of the Supply System staff at the conclusion of the

inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

No violations of NRC requirements

were identified within the scope of this

inspection.

Xn accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

8611050037

861021

PDR

ADOCK 05000397

6

PDR

J

p

~

p

W

F

'er

S

~

t

r

I

II

ek

te

1

4

4

e

'

I

OCT 2%~986

Should you have

any questions

concerning this, inspection,

we will be glad to

discuss

them with you.

Sincerely

C2(

A. E. Chaffee,

Deputy Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection Report No. 50-397/86-32

cc w/enclosure:

C.

M. Powers,

WNP-2 Plant Manager

P. L. Powell,

WNP-2 Licensing Manager

R. B. Glasscock,

WNP-2 Director, Assurance

8 Licensing

State of Washington

N. S. Reynolds,

Bishop, Liberman,

Cook, Purcell 8

Reynolds

J.

D. Martin,

WPPSS

G. E. Doupe,

WPPSS

W.

G.

Conn,

Burns 8 Roe, Inc.,

c/o

WPPSS

bcc w/enclosure:

RSB/Document Control Desk

(RIDS)

Project Inspector

Resident Inspector

G.

Cook

B. Zaulkenberry

J. Martin

bcc w/o enclosure:

LPMB

Region

U

TD

10/ 41/8

l

oima"

C

r

P

o

on

10/ Z//86

10/>///86

Chaffee

10/2( /86

)

A

  • ,

gh

V.

A

d

E

1'

li .f'l

t

l

Ila

I

N

I

1

f