Other: GO2-86-568, Opines That Existing Neutron Monitoring Sys Adequate to Meet post-accident Needs for Measuring Neutron Flux Per Sser 4 (NUREG-0991).License Need Not Be Amended Yet to Conform to Rev 2 to Reg Guide 1.97, GO2-88-167, Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 881007, GO2-88-213, Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 890106, GO2-89-004, Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 890407, ML17278A596, ML17278B101, ML17285A479, ML17285A482
|
MONTHYEARML17219A4021975-05-13013 May 1975 Component Cooling Pumps Mas & Reinf, as-built.Sheet 1 Project stage: Other GO2-85-724, Application for Amend to License NPF-21,changing License Condition 16 to Implement Installation or Upgrade Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Second Refueling Outage.Fee Paid1985-10-14014 October 1985 Application for Amend to License NPF-21,changing License Condition 16 to Implement Installation or Upgrade Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Second Refueling Outage.Fee Paid Project stage: Request ML17278A5961986-02-0303 February 1986 Informs of Motion Adopted by Energy Facility Site Evaluation Council Indicating No Comments on WPPSS 850927,1014,17 & 1106 Requests for Amends to License NPF-21 Project stage: Other ML17278A8231986-05-0505 May 1986 Safety Evaluation Supporting Amend 23 to License NPF-21 Project stage: Approval ML17278A8201986-05-0505 May 1986 Amend 23 to License NPF-21,revising License Condition 2.C.(16),extending Flux Monitoring Implementation Requirements Deadline to Second Refueling Outage Project stage: Other GO2-86-568, Opines That Existing Neutron Monitoring Sys Adequate to Meet post-accident Needs for Measuring Neutron Flux Per Sser 4 (NUREG-0991).License Need Not Be Amended Yet to Conform to Rev 2 to Reg Guide 1.971986-06-19019 June 1986 Opines That Existing Neutron Monitoring Sys Adequate to Meet post-accident Needs for Measuring Neutron Flux Per Sser 4 (NUREG-0991).License Need Not Be Amended Yet to Conform to Rev 2 to Reg Guide 1.97 Project stage: Other ML17278B0991986-11-18018 November 1986 Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.7.5-1, Accident Monitoring Instrumentation & 4.3.7.5-1, Accident Monitoring Instrumentation... to Allow Adequate Time for Staff Review & Approval.Fee Paid Project stage: Request ML17278B1011986-11-18018 November 1986 Proposed Tech Specs,Revising Tech Spec Tables 3.3.7.5-1, Accident Monitoring Instrumentation & 4.3.7.5-1, Accident Monitoring Instrumentation Surveillance Requirements Project stage: Other GO2-87-080, Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid1987-03-10010 March 1987 Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid Project stage: Request ML17279A1461987-03-18018 March 1987 Offers No Comments on Util 861118 & 1212 Requests for Amends to License NPF-21 Re wide-range Neutron Flux Monitor & Snubbers,Respectively,Per State of Wa Energy Facility Site Evaluation Council 870309 Meeting Project stage: Meeting GO2-87-010, Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed1987-03-31031 March 1987 Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed Project stage: Request ML17279A2841987-05-28028 May 1987 Offers No Comments on Util Listed Proposed Amends to License NPF-21,per 870526 Meeting Project stage: Meeting ML17279A3161987-06-0303 June 1987 Safety Evaluation Supporting Amend 46 to License NPF-21 Project stage: Approval ML17279A3141987-06-0303 June 1987 Amend 46 to License NPF-21,revising License Condition 2.C.(16),Attachment 2,Item 3.(b) to Extend Deadline Until Third Refueling Outage for Implementing Requirements of Reg Guide 1.97,Rev 2 for Flux Monitoring Project stage: Other GO2-87-293, Application for Amend to License NPF-21 to Implement Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage.Fee Paid1987-12-23023 December 1987 Application for Amend to License NPF-21 to Implement Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage.Fee Paid Project stage: Request GO2-88-018, Responds to 880113 Telcon Requesting Addl Info Re Contract Procuring Wide Range Neutron Monitoring Sys.Continuous Monitoring & Qualification Assistance Should Ensure Gamma Metrics Diligently Pursues Qualification of Equipment1988-01-15015 January 1988 Responds to 880113 Telcon Requesting Addl Info Re Contract Procuring Wide Range Neutron Monitoring Sys.Continuous Monitoring & Qualification Assistance Should Ensure Gamma Metrics Diligently Pursues Qualification of Equipment Project stage: Other ML17284A6011988-02-25025 February 1988 Advises That 871223,880205 & 18 Requests for Amends to License NPF-21 Reviewed & Adopted Motions Indicating That Energy Facility Site Evaluation Council Has No Comments Project stage: Other ML17279B1211988-06-10010 June 1988 Safety Evaluation Supporting Amend 60 to License NPF-21 Project stage: Approval ML17279B1221988-06-10010 June 1988 Notice of Issuance of Amend 60 to License NPF-21 Project stage: Approval ML17279B1191988-06-10010 June 1988 Amend 60 to License NPF-21,revising License Condition 2.c.(16) to Extend Fourth Refueling Outage Deadline for Implementing Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring.Neutron Flux Monitor Must Be Qualified Project stage: Other GO2-88-167, Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 8810071988-07-29029 July 1988 Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 881007 Project stage: Other GO2-88-213, Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 8901061988-10-0606 October 1988 Provides Quarterly Rept Re License Condition 2.C.(16), Attachment 2,Item 3(b) Wide-Range Neutron Monitor. Next Quarterly Rept Will Be Submitted by 890106 Project stage: Other GO2-89-004, Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 8904071989-01-0606 January 1989 Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 890407 Project stage: Other ML17285A4821989-05-17017 May 1989 Notice of Denial of Amend to License NPF-21,revising Tech Spec Tables 3.3.7.5-1 & 4.3.7.5-1 Re Accident Monitoring. Denial Based on Util Difficulty in Qualifying Neutron Monitoring Sys Environ Project stage: Other ML17285A4791989-05-17017 May 1989 Forwards Notice of Denial of Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.7.5-1 & 4.3.7.5-1 Re Accident Monitoring.Decision Based on Util Re Difficulty to Qualify Neutron Monitoring Sys Project stage: Other 1987-03-31
[Table View] |
Text
TABLE 4.3.7.5-1 ACCIOENT fmHITORIHG IHSTRUHEHTATION SURVEILLANCE RE UIREHENTS INSTRUHEHT 1.
Reactor Vessel Pressure 2.
Reactor Vessel Water Level 3.
4.
7.
8.
Suppression Chamber Water Level Suppression Chamber Water Temperature Suppression Chamber Air Temperature Primary Containment Pressure Orywell Air Temperature Ovywell Oxygen Concentration Ovywell llydrogen Concentration 10.
Safety/Relief Valve Position Indicators ll.
Suppvession Chamber Pressure 12.
Condensate Storage Tank Level 13.
Hain Steam Line Isolation Valve Leakage Control System Pressure CIIANNEL CIIECK H
II
+p N
II g~
g CIIANNEL CALIBRATIOH
~ R APPLICABLE OPERATIOHAL CONDITIONS 1,
2 1
2 1,
2 1,
2 1,
2 1 ~
2 1,
2 1,
2 1 ~ 2 1,
2 1,
2 1.
2 1,
2 III ~;de.'o.noe.
N<ukI.on I
Flu y. Honi+Or 15.
RCIC Flow 16.
IIPCS Flow 17.
LPCS Flow H
H R
R R
1, 2
1, 2
1, 2
1 2
8612010066 861118 PDR ADQCK 05000397 P
PDR
I A
4 I
W
C/lX MZ TABLE 3.3.7.5-1 (Continued)
ACCIDENT HOHITOAlHG IHSTAUHEHTATION AE(VIREO HUHBER OF CIIAHHELS IHSTAUHENT
- 4. Hrto 22.
Standhy Service Water Flow 23.
Standby Service Water Spray Pond Temperature 24.
Post-Accident Sampling Containment Atmospheric Radiation Monitor 25.
Emergency Venti lat;ion Damper Position 26.
Standby Power and Otlier Energy Sources 27.
Primary Cont.ainment Valve Position 28.
Primary Containment Gross Radiatiori Honitors8 29.
Post-Accident Sampl)ng Primary Coolant Radiation Monitor 2/duct 2/source 1/valve 30.
Effluent Noble Gas Radiation Monitor/I 31.
Reactor Buililing Post LOCA Grab Sampler 1
ei r n Flux.
Vide. Ran
- e. Neu tron
ÃI I
<~ ~x H iVor:-
15.
RCIC Flow l
. 16.
IIPCS Flow 1
17.
LPCS Flow 1
18.
Standby Liquid Control System Flow 1
19.
Standby Liquid Control System Tank Level 1
20.
RIIR Flow 8)'o op 21.
AIIR Iieat Exchanger Outlet Temperature 1/
changer 1/1 0 op g@
z Qp 1
1 ',
2 1
1, 2
1 1,
2 1
1, 2
1 1,
2 1
1, 2
1/loop 1,
2 1/heat 1,
2 exchanger 1/loop 1
1, 2
1, 2
1, 2, 3 Sl MO
~0 80 80 80 80 80 80 80 80 81 1/duct 1/source 1/1 ine 1,
2 1
2 1,
2 1, 2, 3
80 80 80 81 1, 2, 3
1, 2, 3
1 2
3 81 81 81 HINIHUH APPLICABLE CIIAHHELS OPERATIONAL OPERABLE COIIDITIONS ACTION Niiigl>>)nge moni tors.
Jo I'
P' A
p