November 6, 1986 Docket No. 50-397 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
Subject:
Use of Later ASME Section XI Code DISTRIBUTION:
0-397 NRC PDR Local PDR BWD-3 r/f EAdensam JBradfute EHylton RBernero
Reference:
Letter, G02-85-314, from Sorensen (SS) to Butler (NRC),
same subject, dated June 14, 1985 The Supply System's request for approval to use ASME Section XI, 1983 Edition, Winter 1984 Addenda, Subsection IWA 2213 (Reference) has been reviewed by the staff.
The staff has not yet completed its evaluation of the Winter 1984 Addenda, therefore, does not have a basis for approval of its use at this time.
A copy of the related Safety Evaluation is enclosed.
Sincerely, 1
Enclosure:
As stated cc:
See next page 861 1 >Doc< 05000g97 140051 861106 PDR PDR P
Elinor G. Adensam, Director BWR Proiect Directorate No.
3 Division of BWR Licensing JBradfute 11/f /86 LA:BWD-3:DBL EHylton 11/ t'86 D:BLID-3:DBL EAdensam ll/ $/86
l col/(z l
~ I I ~'> ~
,y I
Mr. G.
C. Sorensen, Manaqer Washinqton Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
Bishop, Liberman,
- Cook, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, D.C.
20036 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washinoton 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. W.
G.
Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.
Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box MD 927M Richland, Washington 99352 t
Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 35
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATING TO LATEST CODE RE UIRENENT APPLICATION WASHINGTON PUBLIC POWER SUPPLY SYSTEN NUCLEAR PLANT NO.
2 DOCKET NO. 50-397 86>sp6 PDR ADQCg pgpppp97 P
- 1. 0 INTRODUCTION In a letter dated June 14, 1985, the Washington Public Power Supply System requested NRC approval to use the American Society of Nechanical Engineers (ASNE) Boiler and Pressure Vessel (BSPV) Code Section XI, 1983 Edition, Minter 1984 Addenda, Section IMA 2213.
Evaluation of this request is discussed below.
2.0 EVALUATION The Winter 1984 Addenda of the ASNE B8PV Code Section XI, 1983 Edition has revised visual examination VT-3 requirements delineated in IWA-2213.
The revision coincided with the deletion of visual examination VT-4 requirements delineated in IWA-2213.
Adopting the new IMF-2213 requirements would auto-matically permit the licensee to terminate its previous VT-4 visual examination commitments'egulations and Technical Specifications require that inservice surveillance be performed according to the ASNE 88PV Code Section XI requirements.
However, these requirements are modified and revised from time to time to reflect the latest surveillance philosophy and technical developments.
The results are published at three-year intervals as revised editions of the
- Code, supplemented by quarterly interim addenda.
The NRC approves the use of these editions and addenda at regular intervals after evaluations reveal that they do not conflict with present NRC positions.
Currently, the ASNE B8PV Code Section XI has been approved to the 1983 Edition, Summer 83 Addenda.
Approval of further addenda and editions will be granted on an orderly basis.
1 1
i 3g>
Ir
h
~'Pl IV ~vf '4 A4 IA 1 4%9't S~IWI4 A 4
~ A jhow 4
- 3. 0 CONCLUSION Since the NRC has not completed its evaluation of the Winter 1984 Addendum, there is no basis for the approval of its use.
Therefore, the request is premature and cannot be granted.
~
~