Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A438 + (ML17275A438)
- CNL-17-124, Description of Changes in Revision 1 of the Browns Ferry Nuclear Plant Cyber Security Plan + (ML17275A440)
- ML17275A442 + (ML17275A442)
- ML17275A443 + (ML17275A443)
- CNL-17-125, Description of Changes in Revision 1 of the Sequoyah Nuclear Plant Cyber Security Plan + (ML17275A446)
- GO2-80-120, Forwards Revised Response to Violations Noted in IE Investigation Rept 50-397/79-10.Transient Analysis Indicates Matl Adjacent to Weld & Under Heating Blanket Were Not Excessively Overheated + (ML17275A447)
- ML17275A449 + (ML17275A449)
- ML17275A450 + (ML17275A450)
- ML17275A451 + (ML17275A451)
- ML17275A453 + (ML17275A453)
- GO2-80-148, Forwards Repts Referenced in NRC 800602 Question 360.005 + (ML17275A454)
- ML17275A455 + (ML17275A455)
- ML17275A456 + (ML17275A456)
- ML17275A457 + (ML17275A457)
- ML17275A458 + (ML17275A458)
- ML17275A459 + (ML17275A459)
- ML17275A462 + (ML17275A462)
- CNL-17-126, Description of Changes in Revision 2 of the Cyber Security Plan + (ML17275A463)
- ML17275A466 + (ML17275A466)
- GO2-80-161, Interim Deficiency Rept Re Gaps & Voids in Sacrificial Shield Wall.Corrective Action Plan Described in . Implementation Is Pending NRC Concurrence + (ML17275A471)
- GO2-80-145, Forwards Status of Flued Head Containment Penetration Welds in Response to IE Bulletin 80-08.Work on Flued Heads Covered by ASME Code.Completed Welds Examined Radiographically. Defects Re Incomplete Fusion & Surface Porosity Repaired + (ML17275A477)
- GO2-80-149, Responds to Round One Questions,Set 9,Questions 211.049 - 311.106 + (ML17275A496)
- ML17275A500 + (ML17275A500)
- GO2-80-151, Answers Notice of Proposed Imposition of Civil Penalties Dtd 800617.Majority of Findings Reflect Deficiencies Found by Contractor,Util & NRC Region 5.Encl Exhibit a Details Protests Against Imposition of Certain Proposed Penalties + (ML17275A503)
- ML17275A506 + (ML17275A506)
- ML17275A513 + (ML17275A513)
- ML17275A514 + (ML17275A514)
- ML17275A518 + (ML17275A518)
- ML17275A519 + (ML17275A519)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 + (ML17275A520)
- ML17275A521 + (ML17275A521)
- ML17275A522 + (ML17275A522)
- ML17275A523 + (ML17275A523)
- ML17275A528 + (ML17275A528)
- ML17275A529 + (ML17275A529)
- ML17275A531 + (ML17275A531)
- ML17275A533 + (ML17275A533)
- ML17275A534 + (ML17275A534)
- ML17275A535 + (ML17275A535)
- ML17275A537 + (ML17275A537)
- ML17275A538 + (ML17275A538)
- GO2-80-182, Forwards Suppl 1 to Engineering Evaluation of WPPSS Unit 2 Sacrificial Shield Wall, in Response to Open Items Required for NRC Approval of Proposed Replacement Weld in Sacrificial Shield Wall.Affidavit Encl + (ML17275A540)
- ML17275A541 + (ML17275A541)
- ML17275A542 + (ML17275A542)
- ML17275A543 + (ML17275A543)
- ML17275A544 + (ML17275A544)
- GO2-80-184, Deficiency Rept Re Possible Inoperability of Borg-Warner Valves W/Limitorque Series Smc Operators.Identified Valves Will Be Reworked by Thread Staking Procedure.Schedule to Be Provided After Labor Negotiations + (ML17275A545)
- GO2-80-185, Deficiency Rept Re Battery Charger Capacitor Failure. Condition Not Reportable Under 10CFR50.55e.Capacitors Exceeded Recommended shelf-life & Were Not Reformed Prior to Being Placed Into Svc.Procedures Will Be Revised + (ML17275A546)
- GO2-80-165, Forwards Revisions to Electrical,Instrumentation & Control Drawings Listed in Section 1.7 of Fsar.Amend 12 Will Reflect Revisions.W/O Encl + (ML17275A547)
- ML17275A548 + (ML17275A548)