Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17206A523 + (ML17206A523)
- ML17206A524 + (ML17206A524)
- ML17206A525 + (ML17206A525)
- IR 05000335/1978019 + (ML17206A526)
- ML17206A527 + (ML17206A527)
- ML17206A528 + (ML17206A528)
- L-78-363, Forwards Reportable Occurrence Rept 335-B-78-06 + (ML17206A529)
- ML17206A530 + (ML17206A530)
- ML17206A531 + (ML17206A531)
- L-78-360, Ack Receipt of IE Inspec Rept 50-389/78-08 on 780912-15.Does Not Consider Any Info Therein to Be Proprietary + (ML17206A532)
- ML17206A534 + (ML17206A534)
- IR 05000389/1978008 + (ML17206A535)
- 05000335/LER-1978-041, Forwards LER 78-041/01T-0 + (ML17206A536)
- ML17206A537 + (ML17206A537)
- 05000335/LER-1978-041-01, /01T-0 on 781103:water from Reactor Coolant Sys Injected Through a Containment Spray Header.Caused by Improper Clearance Removal Instructions & 2 Isolation Valves Opened Between Spray Sys & Shutdown Cooling Sys by Operator + (ML17206A538)
- ML17206A539 + (ML17206A539)
- 05000335/LER-1978-042, Forwards LER 78-042/01T-0 + (ML17206A540)
- ML17206A541 + (ML17206A541)
- 05000335/LER-1978-042-01, /01T-0 on 781111:4 Solenoid Operated Naoh Addition Sys Valves Found de-energized Due to Failure to Replace Fuses for Valves SE07-1A,1B,2A & 2B During Plant Heatup & Following Outage + (ML17206A542)
- GO2-17-028, License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating + (ML17206A543)
- ML17206A546 + (ML17206A546)
- 05000335/LER-1978-025-03, /03L-0 Update on 780905:2 Damper Motors in Suction Line for HVE-9B Blew Fuses in Control Circuits, Causing B Train to Be Oper, Rather than Inoper as Previously Reported.Condition Is Not Reportable Per Tech Specs + (ML17206A547)
- ML17206A548 + (ML17206A548)
- L-78-371, Ack Receipt of IE Inspec Rept 50-389/78-09 on 781017-19.Does Not Consider Any Info Therein to Be Proprietary + (ML17206A549)
- ML17206A552 + (ML17206A552)
- IR 05000389/1978009 + (ML17206A553)
- ML17206A554 + (ML17206A554)
- ML17206A555 + (ML17206A555)
- ML17206A556 + (ML17206A556)
- L-78-377, States That Estimated Cost for Facility Has Increased from $850 Million to $925 Million,Based on a 65-month Const Schedule,Resumed in June 1977.Commercial Operation Planned for mid-1983 + (ML17206A558)
- ML17206A559 + (ML17206A559)
- L-78-376, Ack Receipt of IE Inspec Rept 50-335/78-22 on 780919-22. Does Not Consider Any Info Therein to Be Proprietary + (ML17206A560)
- ML17206A562 + (ML17206A562)
- ML17206A563 + (ML17206A563)
- IR 05000335/1978022 + (ML17206A564)
- ML17206A565 + (ML17206A565)
- L-78-372, Forwards Suppl to 781025 Response to Inspec Rept 50-335/78-20.Requests Certain Info Be W/Held from Disclosure Pursuant to 2.790 + (ML17206A568)
- ML17206A571 + (ML17206A571)
- ML17206A573 + (ML17206A573)
- IR 05000335/1978024 + (ML17206A574)
- ML17206A575 + (ML17206A575)
- ML17206A576 + (ML17206A576)
- ML17206A577 + (ML17206A577)
- L-78-389, Responds to 781129 Request for Class 2 Fee for 780905 Appl Re Surveillance Req for Onsite Diesel Generators Used for A/C.Requests Reconsideration,As FPL Did Not Initiate or Plan to Initiate Appl & Was Submitted Solely Per Comm Request + (ML17206A578)
- ML17206A579 + (ML17206A579)
- ML17206A581 + (ML17206A581)
- ML17206A582 + (ML17206A582)
- L-78-393, Ack Receipt of IE Insp Rept 50-335/78-26 on 781031-1103.No Proprietary Info + (ML17206A583)
- ML17206A585 + (ML17206A585)
- IR 05000335/1978026 + (ML17206A586)
- 05000335/LER-1978-044, Forwards LER 78-044/03L-0 + (ML17206A587)