ML17206A585
| ML17206A585 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/28/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17206A584 | List: |
| References | |
| NUDOCS 7901020428 | |
| Download: ML17206A585 (3) | |
See also: IR 05000335/1978026
Text
e
~s R<<o.
(4
fp0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
In Reply Refer To:
RII:EHW
50"335/78-26
Nay
P 8
~978
Florida Power and Light Company
Advanced Systems
and Technology
ATTN:
Dr,. R. E. Uhrig, Vice President
P.
O. Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Mr. E.
H. Webster of this office on
October
31-November
3, 1978, of activities authorized by NRC Operating License
No.
DPR-67 for the St. Lucie Unit
1 facility, and to the discussion
of our
findings held with Mr. C.
M. Wethy at the conclusion of the inspections
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
reports
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section
2 '90 of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report
contains
any information that
you (or your contractor) believe to be
proprietary, it is
necessary
that
you
make
a written application within
20 days
to this office to withhold such information from public disclosure.
Any such application
must include
a full statement
of the
reasons
on the
basis of which it is claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained in
a separate
part of the document.
If we do not hear
from you in
this
regard within the specified period,
the report vill be placed
in the
Public Document
Room.
0
Florida Power
and Light Company
-2-
Should
you have
any questions
concerning this letter,
we will be
glad to
discuss
them with you.
Sincerely,
eG
. J.
Long, Chief
R
ctor Operat
s
d Nuclear
upport Branc
Enclosure:
Inspection Report No. 50-335/78-26
cc w/encl:
Mr.
C.
M. Wethy, Plant Manager
St. Lucie Plant
P. 0,
B'ox 128
Ft. Pierce, Florida
33450
Mr. Nat Weems, Assistant
QA Manager
P. 0.
Box 128
Ft. Pierce, Florida
33450