ML17206A585

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/78-26 on 781031-1103.No Noncompliance Noted
ML17206A585
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/28/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A584 List:
References
NUDOCS 7901020428
Download: ML17206A585 (3)


See also: IR 05000335/1978026

Text

e

~s R<<o.

(4

fp0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

In Reply Refer To:

RII:EHW

50"335/78-26

Nay

P 8

~978

Florida Power and Light Company

Advanced Systems

and Technology

ATTN:

Dr,. R. E. Uhrig, Vice President

P.

O. Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. E.

H. Webster of this office on

October

31-November

3, 1978, of activities authorized by NRC Operating License

No.

DPR-67 for the St. Lucie Unit

1 facility, and to the discussion

of our

findings held with Mr. C.

M. Wethy at the conclusion of the inspections

Areas

examined

during the inspection

and

our findings are

discussed

in the

enclosed

inspection

reports

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section

2 '90 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report

contains

any information that

you (or your contractor) believe to be

proprietary, it is

necessary

that

you

make

a written application within

20 days

to this office to withhold such information from public disclosure.

Any such application

must include

a full statement

of the

reasons

on the

basis of which it is claimed that the information is proprietary,

and should

be prepared

so that proprietary information identified in the application is

contained in

a separate

part of the document.

If we do not hear

from you in

this

regard within the specified period,

the report vill be placed

in the

Public Document

Room.

0

Florida Power

and Light Company

-2-

Should

you have

any questions

concerning this letter,

we will be

glad to

discuss

them with you.

Sincerely,

eG

. J.

Long, Chief

R

ctor Operat

s

d Nuclear

upport Branc

Enclosure:

Inspection Report No. 50-335/78-26

cc w/encl:

Mr.

C.

M. Wethy, Plant Manager

St. Lucie Plant

P. 0,

B'ox 128

Ft. Pierce, Florida

33450

Mr. Nat Weems, Assistant

QA Manager

P. 0.

Box 128

Ft. Pierce, Florida

33450