Text
<gR RICy
c'~p0'~i
lta*44'n
Reply Refer To:
RII:EJV
50-389/78-09
, UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
Hav ys 1978
Florida Power
and Light Company
Advanced
Systems
6 Technology
Attn:
Robert
E. Uhrig, Vice President
P.
0.
Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Mr. E. J. Vallish of this
office on October
17-19,
1978, of activities authorized
by
NRC Construction
Permit Yo. CPPR-144 for the St. Lucie Plant, Unit
2 facility, and to the
discussion
of our findings held with Mr. B. J.
Escue at the conclusion
of the inspection.
Areas
examined during the inspection
and our findings are discussed
-in
the enclosed
inspection report,.
Vithin these
areas,
the inspection
consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
I'ithin the scope
of this inspection,
no items of noncompliance
were
disclosed.
In accordance
with Section
2.790 of the NRC's "Rules of Practice",
Part
2, Title 10,
Code of Federal Regulations,
a copy of this letter
and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room.
If this report contains
any information that
you (or
your contractor) believe to be proprietary, it is necessary
that
you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include
a full statement
of the reasons
on the basis of which it is
claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained
in a separate
part of the document.
If we do not hear
from you in this regard within the specified period,
the report
vill be placed
in the Public Document
Room.
a hlf
Ql~
~~
~
NOV y6 iS7e
Florida Power and Light Co.
Should you have
any questions
concerning this letter,
we will be glad
to discuss
them with you.
Sincerely,
/
C.
E. Murphy, Chief
Reactor Construction
and
Engineering
Support
Branch
Enclosure:
Inspection Report
No.
50-389/78-09
cc w/encl:
Mr.
C.
M. Wethy, Plant Manager
St. Lucie Plant
~
~
P.
0.
Box 128
Ft. Pierce,
33450
Mr. Nat Weems, Assistant
QA Manager
P.
0.
Box 128
Ft. Pierce,
33450