In Reply Refer To:
RII:GRJ
50-335/78-19
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
SEP 27
1978
Florida Power and Light Company
Advanced
Systems
and Technology
Attn:
Dr. R. E. Uhrig, Vice President
P.
0.
Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Messrs.
G. R. Jenkins
and
L. L. Jackson of this office on August 21-22 and 24-25,
1978, of activities
authorized
by NRC Operating License No. DPR-67 for the St. Lucie
1 facility,
and to the discussion of our findings held with Mr., C.
M. Wethy at the
conclusion of the inspection.,
<
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
or"
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspectors.
One new unresolved
item resulted
from this inspection
and is discussed
in
the enclosed report.
This item will be examined during subsequent
inspec-
tions.
During the inspection, it was found that certain activities under your
license
appear to be in noncompliance with NRC requirements.
These
items
and references
to pertinent requirements
are listed in the Notice of Viola-
tion enclosed
herewith
as Appendix A.
This notice is sent to you pursuant
to the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations.
Section 2.201 requires
you to submit
to this office, within 20 days of your receipt of this notice,
a written
statement
or explanation in reply including:
(1) corrective steps
which
have been taken by you and the results
achieved;
(2) corrective steps
which
will be taken to avoid further noncompliance;
and (3) the date
when full
compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20
days to this office to withhold such information from public disclosure.
Any such application must include
a full statement of the reasons
on the
7819.845 0 ~ ~
SEp 27
1978
Florida Power and Light Co.
basis of which it is claimed that the information is proprietary,
and should
be prepared
so that proprietary information identified in the application is
contained in a separate
part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
,'v, M
J.
T. Sutherland,
Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
l. Appendix A, Notice of Violation
2. Inspection Report No. 50-335/78-19
cc w/encl:
Mr. C.
M. Wethy, Plant Manager
St. Lucie Plant
P. 0.
Box 128
Ft. Pierce, Florida
33450
Mr. Nat Weems, Assistant
QA Manager
P. 0.
Box 128
Ft. Pierce, Florida
33450