Forwards IE Inspec Rept 50-335/78-19 & Notice of Violation
ML17206A524
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/27/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A522 List:
References
NUDOCS 7811240009
Download: ML17206A524 (2)


See also: IR 05000335/1978019

Text

In Reply Refer To:

RII:GRJ

50-335/78-19

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

SEP 27

1978

Florida Power and Light Company

Advanced

Systems

and Technology

Attn:

Dr. R. E. Uhrig, Vice President

P.

0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Messrs.

G. R. Jenkins

and

L. L. Jackson of this office on August 21-22 and 24-25,

1978, of activities

authorized

by NRC Operating License No. DPR-67 for the St. Lucie

1 facility,

and to the discussion of our findings held with Mr., C.

M. Wethy at the

conclusion of the inspection.,

<

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

or"

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspectors.

One new unresolved

item resulted

from this inspection

and is discussed

in

the enclosed report.

This item will be examined during subsequent

inspec-

tions.

During the inspection, it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

These

items

and references

to pertinent requirements

are listed in the Notice of Viola-

tion enclosed

herewith

as Appendix A.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations.

Section 2.201 requires

you to submit

to this office, within 20 days of your receipt of this notice,

a written

statement

or explanation in reply including:

(1) corrective steps

which

have been taken by you and the results

achieved;

(2) corrective steps

which

will be taken to avoid further noncompliance;

and (3) the date

when full

compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20

days to this office to withhold such information from public disclosure.

Any such application must include

a full statement of the reasons

on the

7819.845 0 ~ ~

SEp 27

1978

Florida Power and Light Co.

basis of which it is claimed that the information is proprietary,

and should

be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

,'v, M

J.

T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

l. Appendix A, Notice of Violation

2. Inspection Report No. 50-335/78-19

cc w/encl:

Mr. C.

M. Wethy, Plant Manager

St. Lucie Plant

P. 0.

Box 128

Ft. Pierce, Florida

33450

Mr. Nat Weems, Assistant

QA Manager

P. 0.

Box 128

Ft. Pierce, Florida

33450