ML17206A534
| ML17206A534 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/14/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17206A533 | List: |
| References | |
| 781102, NUDOCS 7811290322 | |
| Download: ML17206A534 (2) | |
See also: IR 05000389/1978008
Text
rg
gP,R REMI 'Ip
<<>>*<<>>
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
NOV 0 2 578
In Reply Refer To:
RII:NE
50-389/78-08
Florida Power
and Light Company
Advanced
Systems
and Technology
Attn:
Dr.
R.
E. Uhrig, Vice President
P.
0.
Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Mr. N.
Economos of this office on
September
12-15,
1978, of activities authorized
by NRC Construction
Permit
No.
CPPR-144 for the St. Lucie
2 facility, and to the discussion
of our
findings held with Mr. B. J.
Escue at the conclusion of the inspection.
1'reas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room.
If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include
a full statement
of the reasons
on the
basis of which it is claimed
t.hat the information is proprietary,
and should
be prepared
so that proprietary informat,ion identified in the application is
contained
in a separate
part. of the document.
If we do not hear
from you in
this regard within the specified period,
the report will be placed in the
Public Document
Room.
(
Florida Power
and Light Company
~ JV OR is/8
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
C.
E. Murphy, Chief
Reactor Construction
and Engineering
Support
Branch
Enclosure:
Inspection Report No.
50-389/78-08
cc w/encl:
Mr.
C.
M. Wethy, Plant Manager
St. Lucie Plant
P. 0.
Box 128
Ft. Pierce, Florida,
33450
Mr. Nat Weems, Assistant
gA Manager
P.
0.
Box 128
Ft. Pierce, Florida
33450