ML17206A534

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Rept 50-389/78-08 on 780912-15 During Which No Items of Noncompliance Were Noted
ML17206A534
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/14/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A533 List:
References
781102, NUDOCS 7811290322
Download: ML17206A534 (2)


See also: IR 05000389/1978008

Text

rg

gP,R REMI 'Ip

<<>>*<<>>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

NOV 0 2 578

In Reply Refer To:

RII:NE

50-389/78-08

Florida Power

and Light Company

Advanced

Systems

and Technology

Attn:

Dr.

R.

E. Uhrig, Vice President

P.

0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. N.

Economos of this office on

September

12-15,

1978, of activities authorized

by NRC Construction

Permit

No.

CPPR-144 for the St. Lucie

2 facility, and to the discussion

of our

findings held with Mr. B. J.

Escue at the conclusion of the inspection.

1'reas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include

a full statement

of the reasons

on the

basis of which it is claimed

t.hat the information is proprietary,

and should

be prepared

so that proprietary informat,ion identified in the application is

contained

in a separate

part. of the document.

If we do not hear

from you in

this regard within the specified period,

the report will be placed in the

Public Document

Room.

(

Florida Power

and Light Company

~ JV OR is/8

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

C.

E. Murphy, Chief

Reactor Construction

and Engineering

Support

Branch

Enclosure:

Inspection Report No.

50-389/78-08

cc w/encl:

Mr.

C.

M. Wethy, Plant Manager

St. Lucie Plant

P. 0.

Box 128

Ft. Pierce, Florida,

33450

Mr. Nat Weems, Assistant

gA Manager

P.

0.

Box 128

Ft. Pierce, Florida

33450