Forwards IE Inspec Rept 50-335/78-22 on 780919-22 & Notice of Violation
ML17206A562
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/08/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A561 List:
References
NUDOCS 7812140265
Download: ML17206A562 (3)


See also: IR 05000335/1978022

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

'EGION

II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

NOY 8

1978

In Reply Refer To:

RII:HLW

- 50-335/78-22

Florida Power and Light. Company

Advanced Systems

and Technology

'TTN:

Dr. R. E. Vhrig, Uice President

P.O.

Box 529100

Miami, Florida

33152

Gentlemen

This refers to the inspection

conducted

by Mr.

H. L. Whitener of this office

on

September

19-22,

1978, of activities authorized

by

NRC Operating License

No.

DPR-67 for the St. Lucie

1 facility, and to the discussion of our findings

held with Mr.

C.

M. Wethy at. the conclusion of the inspection.

Areas

examined

during the

inspect.ion

and our findings are discussed

in the

enclosed

inspection

report..

Within t.hese

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observat.ions

by t.he inspectors.

During

the. inspection it

was

found

that

certain activities

under

your

license

appear

to be in noncompliance

with NRC requirements.

This item and

references

to pertinent

requireraents

are listed in the Notice of 'Violation

enclosed

herewith

as

Appendix A.

Corrective actions

to prevent

recurrence

were

completed

prior to

the

conclusion

of this inspection;

therefore,

a

reply is not. requested.

Based

on discussions

during this inspect.ion, it is our understanding

that

you will revise

your surveillance

procedure

to incorporate specific accep-

tance criIeria

and

data

requirements

as

delineated

in the enclosed

report

and will establish written guidelines

for the selection

of

a representative

sample of suppressors

for fun<<I.ional testing.

In accordance

wit,h Section

2.790 of th(

NRC's "Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulat.ions,

a copy of this letter and the enclosed

inspection

report will be placed

in the

NRC's Publi<< Document

Room. lf this

report contains

any information t.hat

you {or your contractor)

believe

to be

proprieI.ary,

it, is necessary

that

you make

a written application within 20

days

to this office to withhold such

information

from public disclosure.

Any such application

must

include

a full statement

of the

reasons

on

the

basis of which it is claimed that the information is proprietary,

and should

Florida Power and Light Company

-2-

NOV

8

S7P

be prepared

so that proprietary information identified in the application is

contained

in

a separate

part of the document.

If we do not hear

from you in

this

regard within the specified period,

the report will be placed

in the

Public Document.

Room.

Should

you

have

any questions

concerning this letter,

we wall

be

glad

to

discuss

them with you.

Sincerely,

F. J.

Long, Chief

Reactor Operations

and Nuclear

Support

Branch

Enclosure:

l.

Appendix A, Notice of Violation

2.

Inspection

Report

No. 50-335/78-22

cc w/encl:

Mr.

C.

M. Wethy, Plant

Manager

St.

Lucie Plant

P.O.

Box

128

Ft. Pierce,

Florida

33450

Mr. Nat Veems, Assistant

QA. Manager

P.O.

Box

128

Ft. Pierce,

Florida

33450