Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14059A546 + (ML14059A546)
- IR 05000498/2013501 + (ML14059A547)
- IR 05000382/2013501 + (ML14059A549)
- IR 05000482/2013501 + (ML14059A553)
- ML14059A554 + (ML14059A554)
- ML14059A555 + (ML14059A555)
- IR 05000272/2013001 + (ML14062A013)
- IR 05000354/2013001 + (ML14062A017)
- IR 05000443/2013001 + (ML14062A021)
- ML14062A032 + (ML14062A032)
- IR 05000219/2013001 + (ML14062A036)
- ML14062A044 + (ML14062A044)
- CNL-14-026, Transmittal of Supplemental Clarification Information for the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, TAC No. ME8200 (WBN-UFSAR-12-01) + (ML14062A045)
- NRC 2014-0015, Response to Request for Additional Information Spring 2013 Unit 1 (U1R34) Steam Generator Tube Inspection Report + (ML14062A047)
- CNL-14-014, Revised Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (ML14062A050)
- CNL-14-034, Correction to Unique Component Identifier Number + (ML14062A055)
- RS-14-017, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14062A056)
- RS-14-018, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (ML14062A057)
- RS-14-019, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14062A058)
- RS-14-020, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No EA-12-051) + (ML14062A060)
- PLA-7137, Second Six-Month Status Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14062A061)
- RS-14-021, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14062A062)
- RS-14-025, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (ML14062A063)
- RS-14-045, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14062A064)
- RS-14-046, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML14062A065)
- NRC 2014-0013, NextEra Energy Point Beach. LLCs Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event + (ML14062A073)
- ML14062A074 + (ML14062A074)
- IR 05000334/2013001 + (ML14062A090)
- 05000306/LER-2014-001, Re Unanalyzed Condition Due to Removal of Multiple Steam Generator Lateral Support Shims and Bumpers + (ML14062A091)
- IR 05000289/2013001 + (ML14062A095)
- LIC-14-0027, 2014 Initial License Examination Outline + (ML14062A122)
- L-PI-14-022, Technical Evaluation to Support LOCA 10 CFR 50.46 30 Day NRC Submittal + (ML14062A123)
- ML14063A000 + (ML14063A000)
- AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14063A041)
- AEP-NRC-2014-17, Second Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. + (ML14063A042)
- AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model + (ML14063A043)
- ML14063A044 + (ML14063A044)
- 3F0214-06, Complex - Environmental Protection Plan Report: 2013 Sea Turtle Rescue and Recovery Summary Report + (ML14063A045)
- IR 05000247/2013001 + (ML14063A053)
- IR 05000483/2013501 + (ML14063A055)
- IR 05000333/2013001 + (ML14063A056)
- L-2014-051, Annual Fitness-for-Duty Program Report for 2013 + (ML14063A062)
- L-14-091, Discovery of Tritium in Groundwater, 30-Day Report in Accordance with the Industry Ground Water Protection Initiative + (ML14063A063)
- TMI-14-029, T1R20 Refueling Outage Inservice Inspection (ISI) Owners Activity Report and Attachments + (ML14063A064)
- NG-14-0061, NextEra Energy Duane Arnold Energy Center, LLCs Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order + (ML14063A065)
- NG-14-0068, NextEra Energy Duane Arnold Energy Center, LLCs Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14063A066)
- RC-14-0021, Relief Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations + (ML14063A067)
- ML14063A073 + (ML14063A073)
- ML14063A078 + (ML14063A078)
- PNP 2014-022, Response to Second Request for Additional Information Dated February 27, 2014 for Relief Request RR 4-18 - Proposed Alternative Use of ASME Code Case N-770-1 Baseline Examination + (ML14063A089)
- ML14063A109 + (ML14063A109)