ML14062A122
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/03/2014
From: Cortopassi L
Omaha Public Power District
To: Garchow S
Document Control Desk, NRC Region 4
References
LIC-14-0027
Download: ML14062A122 (2)


Text

-~

fjjjjjfj Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 10 CFR 55 March 3,2014 LlC-14-0027 Mr. Steve Garchow, Chief Examiner Chief, Operations Branch, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No.1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285

Reference:

Letter from NRC (V. G. Gaddy) to OPPD (L. Cortopassi) dated May 16, 2013 (NRC-13-0064)

SUBJECT:

Fort Calhoun Station 2014 Initial License Examination Outline In accordance with the referenced letter, enclosed is the Omaha Public Power District's (OPPD) licensed operator examination outline for the examination scheduled to be conducted May 19-27, 2014. The enclosed material was developed in accordance with NUREG 1021 ,

Revision 9, Supplement 1, "Operator Licensing Examiner Standards," and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.

The outline is being provided in both printed and electronic formats. The enclosed CDROM contains the outline in password protected Adobe Acrobat (PDF) format.

Also enclosed are the signed Examination Outline Quality Checklist (ES-201-2) and Examination Security Agreement (ES-201-3). As additional individuals are required to participate in the examination development and validation process, they will be added to the security agreement.

Employment with Equal Opportunity

U. S. Nuclear Regulatory Commission L1C-14-0027 Page 2 To ensure exam security, it is requested that these materials be withheld from public disclosure until after the examinations are complete.

If you require additional information, please contact Terrence W. Simpkin, Manager, Site Regulatory Assurance, at (402) 533-6263. No commitments are made in this letter.

LPC/epm Enclosed: Initial License Test Materials c: J. M. Sebrosky, NRC Senior Project Manager (w/o enclosures)

M. L. Dapas, Regional Administrator, Region IV (w/o enclosures)

J. C. Kirkland, NRC Senior Resident Inspector (w/o enclosures)

V.G. Gaddy, Chief, Operations Branch, Region IV(w/o enclosures)

Document Control Desk (w/o enclosures)