ML14062A044
| ML14062A044 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Fermi, Clinton, PROJ0710 |
| Issue date: | 03/03/2014 |
| From: | Harrison J GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| MFN 13-072, Suppl. 1, NEDE-33766P | |
| Download: ML14062A044 (5) | |
Text
GE Hitachi Nuclear Energy James F. Harrison GE-Hitachi Nuclear Energy Americas LLC Vice President, Fuel Licensing, Regulatory Affairs P.O. Box 780, M/C A-75 Wilmington, NC 28401 USA T 910.620.1826 james.harrison@ge.com MFN 13-072 Supplement 1 March 3, 2014 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Additional Utility Support for NEDE-33766P, GEH Simplified Stability Solution (GS3)
As noted in Reference 1, GE-Hitachi Nuclear Energy Americas LLC (GEH) is transmitting two additional letters from utilities documenting support for the review of licensing topical report (LTR) NEDE-33766P, Revision 0, GEH Simplified Stability Solution (GS3) and documenting the intent to implement the GS3 solution when approved by the U.S. Nuclear Regulatory Commission.
Specifically, Southern Nuclear Operating Company (SNC) has indicated a desire to implement GS3 in concurrence with the Hatch 2 Reload 23 in the Spring of 2015, pending successful approval of GS3 by the NRC. This is similar to the request stated in the Exelon letter contained in Reference 1 regarding the implementation at the Clinton plant in Spring of 2015.
If you have any questions, please contact me.
Sincerely, James F. Harrison Vice President, Fuel Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC Project No. 710
MFN 13-072 Supplement 1 Page 2 of 2 No commitments are made in this letter or its enclosures.
Enclosure:
- 1.
Additional Utility Support Letters
Reference:
- 1. Letter, James F. Harrison (GEH) to Document Control Desk, Licensing Topical Report NEDE-33766P and NEDO-33766, GEH Simplified Stability Solution (GS3),
MFN 13-072, September 10, 2013.
cc:
SS Philpott, US NRC J Golla, US NRC JG Head, GEH/Wilmington PL Campbell, GEH/ Washington JG Anderson, GEH/Wilmington J Vedovi, GEH/Wilmington CL Heck, GEH/Wilmington PT Tran, GEH/Vallecitos PLM Specification 000N5725 R0
ENCLOSURE 1 MFN 13-072 Supplement 1 Additional Utility Support Letters
DTE Energy Company 6400 North Dixie Highway Newport, MI 48166 September 11, 2013 J. Michael Downs GNF Customer Projects 3901 Castle Hayne Rd.
Wilmington, NC 28401
Subject:
Fermi 2 Intention to Implement GE Hitachi Simplified Stability Solution Mr. Downs, I am writing you to communicate DTE Energy Companys interest in the review of Licensing Topical Report NEDE-33766P for the GE Hitachi Simplified Stability Solution (GS3). At DTE Energys Fermi 2 Power Plant, we believe that GS3 represents a significant improvement over the current stability methodology and plan to implement this new stability option as soon as final NRC approval is obtained. GS3 will have a positive impact on simplified reactor operation. Additionally, a lower stability based Operating Limit Minimum Critical Power Ratio can be leveraged to reduce fuel cost which benefits our ratepayers.
It is our desire that the review of this submittal receive an appropriately high level of priority by the NRC.
Regards Paul Kiel Core Design and Fuel Economics Technical Expert - Reactor Engineering Fermi 2 Power Plant MFN 13-072 Supplement 1 Non-Proprietary Information - Class I (Public)
Page 1 of 2
MFN 13-072 Supplement 1 Non-Proprietary Information - Class I (Public)
Page 2 of 2