CNL-14-034, Correction to Unique Component Identifier Number
| ML14062A055 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 02/27/2014 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-034 | |
| Download: ML14062A055 (2) | |
Text
L44 140227 007 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-034 February 27, 2014 10 CFR 50.4 10 CFR 50.54(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License Nos. NPF-90 NRC Docket No. 50-390
Subject:
Correction to Unique Component Identifier Number
References:
Letter from TVA to NRC, Tennessee Valley Authority (TVA) - Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2013 (ML13080A073)
On March 12, 2013, the Tennessee Valley Authority (TVA) provided the referenced letter to the Nuclear Regulatory Commission (NRC). Page E1A2-7 of Enclosure 1 of the referenced letter, provided a list of flood mode related spool pieces which were identified by their respective TVA unique component identifier numbers (UNIDs). One of the UNIDs, 0-SPPC-067-0687, was identified as having an incorrect unit designator number. This condition was documented in the Corrective Action Program.
The purpose of this letter is to provide the correct UNID for the spool piece provided in the referenced letter. The UNID 0-SPPC-067-0687 should have been provided as UNID 1-SPPC-067-0687.
U.S. Nuclear Regulatory Commission Page 2 February 27, 2014 There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Kevin Casey at (423) 751-8523.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27th day of February 2014.
cc:
President, Nuclear Licensing NRR Director - NRC Headquarters NRO Director - NRC Headquarters NRC Regional Administrator - Region II NRC Project Manager - Watts Bar Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant