Semantic search

Jump to navigation Jump to search
 Issue dateTitle
NOC-AE-18003543, Errata Sheet17 January 2018Errata Sheet
NOC-AE-18003538, No Active Safety Function Anchor Darling Double Disc Gate Valves3 January 2018No Active Safety Function Anchor Darling Double Disc Gate Valves
ML16207A54128 April 2016Revision 18 to Updated Safety Analysis Report, Chapter 3, Conformance with NRC General Design Criteria
NOC-AE-03001626, Inservice Inspection Summary Reports for Repairs and Replacements and for System Pressure Tests - 1RE115 November 2003Inservice Inspection Summary Reports for Repairs and Replacements and for System Pressure Tests - 1RE11
ML0306905884 March 2003Inservice Inspection Summary Reports for Repairs & Replacements & for System Pressure Tests - 2RE09
ML20147D73112 February 1997Forwards Listing of Recent Part 21 Repts
ML20133N40522 January 1997Forwards Computer Listing of Recent Part 21 Repts to R Foote of Houston Lighting & Power Co,Per Telcon Request
ML20117H55920 August 19961RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve5 February 1996Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve
ST-HL-AE-4966, Responds to NRC Insp Findings of Insp Repts 50-498/94-32 & 50-499/94-32 on 940926-1014 Re Verification of Commitments Made to GL 89-10, Safety-Related MOV Testing & Surveillance9 January 1995Responds to NRC Insp Findings of Insp Repts 50-498/94-32 & 50-499/94-32 on 940926-1014 Re Verification of Commitments Made to GL 89-10, Safety-Related MOV Testing & Surveillance
ML20072P13924 August 19942REO3 Inservice Insp Summary Rept for Repairs & Replacements,Stp Electric Generating Station,Unit 2
Information Notice 1994-55, Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves4 August 1994Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves
ML20078Q77230 March 1994Final Rept, Assessment of MOV Program, for Period 940108-26
Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities4 October 1993Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities
Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves19 February 1993Failures of Not-Locking Devices in Check Valves
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl
Information Notice 1992-67, Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure10 September 1992Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure
Information Notice 1992-41, Consideration of Stem Rejection Load in Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load in Calculation of Required Valve Thrust
Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load In Calculation of Required Valve Thrust
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.
ML19354E45222 January 1990Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling.... Plant Has No safety-related Valves Subj to Bulletin
ML20006A7399 January 19901RE01 Inservice Insp Summary Rept for Repairs & Replacements at South Texas Project Electric Generating Station,Unit 1.
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers
IR 05000498/198903026 September 1989Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Licensee Action on Previous Insp Findings & Preparation for Refueling
ML20245L80631 August 1989Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2
ML20246D42818 August 1989Preservice Insp Summary Rept for Repairs & Replacements & Pressure Tests at South Texas Project Electric Generating Station,Unit 2
ML20245F21521 June 1989Insp Repts 50-498/89-16 & 50-499/89-16 on 890605-09. Violations Noted.Major Areas Inspected:Audit,Procurement & Receipt,Storage & Handling of Equipment Matls Programs
ML20196B95931 December 1988Preservice Insp (PSI) Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station Unit 2. Rept Reviews Bases for PSI Program & Describes Scope of PSI Exams
Information Notice 1988-92, Potential for Spent Fuel Pool Draindwon22 November 1988Potential for Spent Fuel Pool Draindwon
Information Notice 1988-90, Unauthorized Removal of Industrial Nuclear Gauges22 November 1988Unauthorized Removal of Industrial Nuclear Gauges
Information Notice 1988-89, Degradation of Kapton Electrical Insulation21 November 1988Degradation of Kapton Electrical Insulation
Information Notice 1988-87, Pump Wear and Foreign Objects in Plant Piping Systems16 November 1988Pump Wear and Foreign Objects in Plant Piping Systems
Information Notice 1988-88, Degradation of Westinghouse Ard Relays16 November 1988Degradation of Westinghouse Ard Relays
ML20195B89131 October 1988Amended Preservice Insp Summary Rept for Class 1,Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station-Unit 1
ML20195E82525 October 1988Preservice Insp Summary Rept for Repairs & Replacements & Pressure Tests at South Texas Project Electric Generating Station Unit 1
Information Notice 1988-86, Operating with Multiple Grounds in Direct Current Distribution Systems21 October 1988Operating with Multiple Grounds in Direct Current Distribution Systems
Information Notice 1988-85, Broken Retaining Block Studs on Anchor Darling Check Valves14 October 1988Broken Retaining Block Studs on Anchor Darling Check Valves
ML20155B9733 June 1988Insp Repts 50-499/88-24 on 880405-0502.Violations Noted. Major Areas Inspected:Tagging Status of Equipment,Cable Protection,Followup on Previous Insp Findings & Followup on Licensee Reported Significant Const Deficiencies
ML20235A4235 January 1988Errata to Auxiliary Feedwater Sys:Investigation of Hydraulic Transient Events
IR 05000498/198703916 August 1987Insp Repts 50-498/87-39 & 50-499/87-39 on 870530-0626. Violations Noted.Major Areas Inspected:Standby Diesel Generator Review,Preoperational Test Results Review,Ie Bulletins & Circulars & Temporary Mod Program Review
ML20235E54730 June 1987Preservice Insp Summary Rept for Class 1,2 & 3 Component Supports at South Texas Project Electric Generating Station Unit 1
ML20214Q56129 May 1987Insp Repts 50-498/87-08 & 50-499/87-08 on 870309-0410. Violations Noted:Failure to Follow Procedures for Testing & Inadequate Cleanliness Controls Over Open Rcs.Major Areas Inspected:Tmi & Generic Ltr 83-28 Action Items
ML20214H7058 May 1987Forwards Audit Rept from NRC Contractors on Pump & Valve Operability Program.Nrc Evaluation of Audit Incorporated Into Sser 3
ML20214Q35021 April 1987Forwards EGG-NTA-7681, Audit of Pump & Valve Operability Assurance Program for South Texas Project,Unit 1. Several Specific & Generic Issues Identified That Applicant Must Resolve Before Fuel Load
Information Notice 1987-08, Degraded Motor Leads in Limitorque DC Motor Operators4 February 1987Degraded Motor Leads in Limitorque DC Motor Operators
ST-HL-AE-1773, Forwards Responses to Sqrt & Pump & Valve Operability Review Team pre-audit Questions.Rev a to STP-33186-1, Qualification Test Procedure on Valve & Actuator for Valtek,Inc,Springsville,Ut, Also Encl9 October 1986Forwards Responses to Sqrt & Pump & Valve Operability Review Team pre-audit Questions.Rev a to STP-33186-1, Qualification Test Procedure on Valve & Actuator for Valtek,Inc,Springsville,Ut, Also Encl
ML20151V03517 January 1986Const Appraisal Team Insp Repts 50-498/85-21 & 50-499/85-19 on 851021-1101 & 12-22.Potential Enforcement Action Noted: Failure to Provide Adequate Interface Between Design Organizations (A/E) & NSSS
ML20073S13827 April 1983Final Deficiency Rept Re Incorrect Motor Operator Weights Used in Stress Analyses of Valves Supplied by Anchor Darling Valve Co.Initially Reported on 820629.Stress Analysis for Valve MS-143 Will Be Reperformed Using Actual Weight
ML20058H32228 July 1982First Interim Deficiency Rept Re Incorrect Motor Operator Weights for Valves.Initially Reported on 820629.Bechtel Will Initiate Nonconformance Rept Covering Existing Condition of Valves Identified.Next Rept Will Be Submitted by 830429