 Issue dateTitleTopic
ML21160A2319 June 2021Order (Granting Joint Motion to Amend Protective Order)
ML21155A1224 June 2021Proposed Order Granting Joint Motion to Amend Protective Order
ML21139A32519 May 2021(Corrected) Order (Granting Joint Motion for Entry of a Protective Order)
ML19151A81331 May 2019Licensed Operator Positive Fitness-For-Duty Test
ML17156A21418 September 2017Transmittal Letter Requesting Licensee Comments on OPC 2.206 Proposed DDSafe Shutdown
Anticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Open Phase Condition
ML17220A32810 August 2017Nuclear Regulatory Commission Audits of Licensee Responses to Phase 2 of Order EA-13-109 to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML17192A45218 July 2017Generic Audit Plan for 50.54(f) Flooding Focused Evaluation ResponsesFukushima Dai-Ichi
Flooding Focused Evaluation
ML16259A1895 December 2016Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML16333A00029 November 2016Issuance of Emergency Amendment Regarding HPCS and RCIC System Actuation Instrumentation Technical SpecificationsReactor Vessel Water Level
Anticipated operational occurrence
ML16011A35118 October 2016Unit No.2 - Correction Letter for the Correction Letter to Amendment No. 151 Maximum Extended Load Line Limit Analysis PlusSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Probabilistic Risk Assessment
Operator Manual Action
Aging Management
Fukushima Dai-Ichi
Pressure and Temperature Limits Report
Feedwater Controller Failure
MELLLA
Time Critical Operator Action
License Renewal
Exemption Request
Biofouling
Power change
Flow Induced Vibration
Power Uprate
Stretch Power Uprate
Failure to Scram
ML16013A21718 October 2016MF3056, Corrected Redacted Safety Evaluation to Match Second Correction LetterSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Probabilistic Risk Assessment
Operator Manual Action
Aging Management
Fukushima Dai-Ichi
Pressure and Temperature Limits Report
Feedwater Controller Failure
MELLLA
Time Critical Operator Action
License Renewal
Exemption Request
Biofouling
Power change
Flow Induced Vibration
Power Uprate
Stretch Power Uprate
Failure to Scram
ML16281A11817 October 2016Correction to License Amendment No. 158, Reactivity Anomalies
ML16188A02915 September 2016Issuance of Amendment Nos. 224 and 158 Reactivity AnomaliesAnticipated operational occurrence
ML16197A48631 August 2016Issuance of Amendment Secondary Containment Personnel Access Door OpeningsSurveillance Frequency Control Program
Recently irradiated fuel
ML16236A09626 August 2016R. E. Ginna - Correction Letter to License Amendment No. 122 Licence Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program - Adoption of TSTF-425, Revision 3Surveillance Frequency Control Program
ML16229A23926 August 2016R. E. Ginna Nuclear Power Plant - Correction Letter to License Amendment No. 115 Issuance of Amendment to Conform the Renewed Facility Operating License to Reflect the Direct Transfer of Operating Authority
ML16225A00322 August 2016Status of NRC Operating Reactor Regulatory and Licensing Review Procedures
ML16088A05319 April 2016Issuance of Amendment License Amendment Request for Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements ManualSquib
Hardened vent
ML16064A4627 March 2016Release of Information Pursuant to a Freedom of Information Act Request
ML15364A54418 February 2016Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific LicenseesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15341A3365 January 2016Issuance of Amendment Technical Specifications for Safety Limit Minimum Critical Power RatioReactor Vessel Water Level
Anticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
ML15343A04317 December 2015Request for Additional Information Regarding Bypass Leakage Paths
ML15317A30730 November 2015Issuance of Amendment Adoption of Technical Specification Task Force Traveler 425High winds
Reactor Vessel Water Level
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Squib
Surveillance Frequency Control Program
Large early release frequency
Spiral reload
Overtravel
Pressure Boundary Leakage
Recently irradiated fuel
Backfit
ML15328A48223 November 2015Initial Operator Licensing Operating Test and Written Examination Approval (Nine Mile Point, Unit 2)
ML15296A05623 November 2015Correction Letter to Amendment No. 151 Maximum Extended Load Line Limit Analysis Plus
IR 05000220/201500915 October 2015IR 05000220/2015009 and 05000410/2015009; 08/10/2015 - 08/27/2015; Nine Mile Point Nuclear Station (Nmpns), Units 1 and 2; Biennial Baseline Inspection of Problem Identification and ResolutionMission time
Condition Adverse to Quality
Aging Management
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leak
ML15125A34211 September 2015Withdrawal of Request for Relief 21SI-012, End of Interval Relief Request Associated with the Second 10-Year Risk-Informed ISI Inspections - Relief from the Requirements of the ASME Code
ML15096A0762 September 2015Issuance of Amendment Maximum Extended Load Line Limit Analysis PlusReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Scram Discharge Volume
MELLLA
Exemption Request
ML15210A0064 August 2015Correction Letter Regarding Issuance of Amendments - Change to Technical Specification Requirements Regarding Education and Experience Eligibility Requirements for Licensed Operators (TAC Nos. MF4786-87)
ML15167A3158 July 2015Issuance of Amendments Change to TS Requirements Regarding Education and Experience Eligibility Requirements for Licensed Operators
IR 05000220/20154052 July 2015IR 05000220/2015405 and 05000410/2015405; 06/15/2015 to 06/18/2015; Nine Mile Point Nuclear Station; Security Baseline Inspection Letter OnlyAffidavit
ML15153A66016 June 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15166A56811 June 2015Senior Reactor and Reactor Operator Initial License Examinations - Nine Mile Point Nuclear Station, Unit 2
ML15152A52728 May 2015Response to Request for Early Waiver Review for Four Proposed Licensed Operator Applicants at Nine Mile Point, Unit 2
ML15124A04812 May 2015Response Regarding Phase 2 Staffing Submittals Associated Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentFukushima Dai-Ichi
Minimum staff
ML15132A04612 May 2015Project Manager Assignment
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment DesignSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Time to boil
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Fuel cladding
ML15105A18817 April 2015Correction Letter for Proposed Director'S Decision Regarding Saporito Petition Dated March 12, 2011
IR 05000220/201500810 April 2015Notice of Violation - Severity Level III Problem - NRC IR 05000220/2015008 and 05000410/2015008
ML15084A34325 March 2015Notification of Conduct Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Job Performance Measure
Thermoset
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Exemption Request
Maintenance Rule Program
Fire Protection Program
ML15075A15917 March 2015Correction Letter to Amendment No. 217 Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change (Tac No. MF1022)
IR 05000220/20140055 February 2015IR 05000220-14-005, 05000410-14-005; 10/01/2014 - 12/31/2014; Nine Mile Point Nuclear Station (Nmpns), Units 1 and 2; Licensed Operator Requalification Program and Licensed Operator Performance and Maintenance EffectivenessTime of Discovery
Half scram
Offsite Dose Calculation Manual
Fire Barrier
Functionality Assessment
Missed surveillance
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Large early release frequency
Operability Determination
License Renewal
Flow Induced Vibration
ML15033A00230 January 2015MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation RelatedPressure and Temperature Limits Report
Minimum Critical Power Ratio
ML15002A16226 January 2015Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+
ML14227A34711 December 2014Request for Permission to Use Copyrighted Graphics and Material
ML14342A09710 December 2014Request for Additional Information Regarding the Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change License Amendment Request (Tac No. MF1022)
ML14310A6186 November 2014TAC Nos. MF4786 & MF4787 - Acceptance of Requested Licensing Action License Amendment Request- Experience Eligibility Requirements for Licensed Operators
ML14248A08530 October 2014Issuance of Amendments Revision of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Tac Nos. MF2927 and MF2928)Shutdown Margin
Packing leak
Anticipated operational occurrence
Power change
ML14246A3963 September 2014NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+)Safety Limit Minimum Critical Power Ratio
Operator Manual Action
ML14065A0903 September 2014Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056)MELLLA