Request for Additional Information Regarding the Diesel Generator Initiation - Degraded Voltage Time Delay Setting Change License Amendment Request (Tac No. MF1022)
ML14342A097
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/10/2014
From: Nadiyah Morgan
Plant Licensing Branch 1
To: Costanzo C
Nine Mile Point
Morgan N
References
TAC MF1022
Download: ML14342A097 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Christopher Costanzo Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 December 10, 2014

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING THE DIESEL GENERATOR INITIATION-DEGRADED VOLTAGE TIME DELAY SETTING CHANGE LICENSE AMENDMENT REQUEST (TAC NO. MF1022)

Dear Mr. Costanzo:

By letter dated March 8, 2013, as supplemented by letters dated May 16, 2013, July 8, and July 16, 2014, Nine Mile Point Nuclear Station, LLC submitted a license amendment request for Nine Mile Point Nuclear Station, Unit No. 1. The proposed amendment would modify Technical Specification Table 3.6.2i, "Diesel Generator Initiation," by revising the existing 4.16kV Power Board 102/103 Emergency Bus Under-voltage (Degraded Voltage) Operating Time value and updating the Set Point heading title.

The Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff is requesting a response to the RAI within 45 days of the date of this letter.

If you have any questions regarding this matter, please contact me at (301) 415-1016.

Docket No. 50-220

Enclosure:

As stated Additional Distribution via Listserv Sincerely, Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REQUEST FOR ADDITIONAL INFORMATION REGARDING DIESEL GENERATOR INITIATION-DEGRADED VOLTAGE TIME DELAY SETTING CHANGE LICENSE AMENDMET REQUEST NINE MILE POINT NUCLEAR STATION. LLC NINE MILE POINT NUCLEAR STATION. UNIT NO. 1 DOCKET NO. 50-220 By letter dated March 8, 2013 (Agencywide Documents Access & Management System (ADAMS) ML13073A103), Nine Mile Point Nuclear Station, LLC, the licensee, submitted a license amendment request (LAR) for Nine Mile Point Nuclear Station, Unit No. 1 (NMP1 ). The proposed amendment would modify Technical Specification (TS) Table 3.6.2i, "Diesel Generator Initiation," by revising the existing 4.16kV Power Board 102/103 Emergency Bus Under-voltage (Degraded Voltage) Operating Time value and updating the Set Point heading title. By letter dated May 16, 2013 (ADAMS Accession No. ML13144A068), the licensee submitted their response to the Nuclear Regulatory Commission (NRC) staff's request for supplemental information, required to complete the Acceptance Review in accordance with LIC-109. In addition, by letters dated July 8 (ADAMS Accession No. ML14203A050) and July 16, 2014 (ADAMS Accession No. ML14199A384), the licensee submitted responses to the NRC staff's requests for additional information and to confirm the results of the preliminary study referenced in the May 16, 2013, letter. Additionally, the NRC staff performed a Component Design Basis Inspection (CDBI) inspection at NMP1 and NMP2 from September 8, 2014, to October 10, 2014, and the licensee was made aware of its findings in the exit meeting on October 10, 2014.

The Inspection Report No. 05000220/2014001 dated November 20, 2014, (ADAMS Accession No. ML14325A019) documents the findings.

The NRC staff has determined that the following information is needed to complete its review:

Inspection Report No. 05000220/2014007 describes the following findings/violations for NMP1 with respect to the failure to implement design control measures to verify that the connected Class 1 E loads would not be damaged or become unavailable for a design-basis loss-of-coolant (LOCA) coincident with a sustained degraded voltage condition:

Enclosure

1. Failure to adequately evaluate the transient voltages to the Class 1 E accident initiated motors and motor operated valves (MOVs) on the-safety related buses and motor control centers (MCCs). Specifically, the licensee's calculations incorrectly used 115 kilovolts (kV) grid voltage instead of incorporating the 3.5% grid voltage sag into calculation NIMO-ELMS-AC01. Consequently, the licensee did not verify and assure adequate voltages would be available to Unit 1 Class 1 E accident initiated motors, MOVs, and control circuits powered from the 4160 V, 600 V, and 120 V distribution systems during a design-basis LOCA with subsequent unit trip and resulting sag of the 115 kV grid.
2. The inspection team noted that NMP1 electrical design calculations had not evaluated for the following conditions:
a. Connected Class 1 E loads would not be degraded or rendered inoperable for a design-basis LOCA and a sustained degraded voltage condition between the degraded voltage dropout setting (3705 V) and the loss of voltage setting (3200 V) for the degraded voltage time delay of 21 +/- 3 seconds and subsequent reconnection to the emergency diesel generator.
b. Safety-related equipment that is operating or safety-related loads that are required to start (motors, MOVs, etc.) had not been evaluated to ensure that their protective devices would not actuate during a sustained degraded grid condition coincident with a design-basis LOCA.

For the conditions identified above, the required equipment may not be available after transfer of safety busses to the onsite power sources.

1.

For COB I finding 1 above, provide a summary of the preliminary evaluations provided during the COB I to verify that the critical Class 1 E loads that operate during the first 24 seconds of a LOCA would not be damaged or become unavailable for a design basis LOCA coincident with a sustained degraded voltage condition. Clearly identify each input and assumption used for each preliminary evaluation, including load tap changer performance during the 24 second period.

2.

For CDBI finding 2 above, provide a summary of preliminary evaluations performed to evaluate conditions 2.a and 2.b described above. Clearly identify each input and assumption used for each associated preliminary evaluation.

3.

For CDBI findings 1 and 2 above, please provide corrective actions planned and taken, including the review of the extent-of-condition for components required during a LOCA.

Mr. Christopher Costanzo Site Vice President December 10, 2014 Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING THE DIESEL GENERATOR INITIATION-DEGRADED VOLTAGE TIME DELAY SETTING CHANGE LICENSE AMENDMENT REQUEST (TAC NO. MF1022)

Dear Mr. Costanzo:

By letter dated March 8, 2013, as supplemented by letters dated May 16, 2013, July 8, and July 16, 2014, Nine Mile Point Nuclear Station, LLC submitted a license amendment request for Nine Mile Point Nuclear Station, Unit No. 1. The proposed amendment would modify Technical Specification Table 3.6.2i, "Diesel Generator Initiation," by revising the existing 4.16kV Power Board 102/103 Emergency Bus Under-voltage (Degraded Voltage) Operating Time value and updating the Set Point heading title.

The Nuclear Regulatory Commission (NRC) staff has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff is requesting a response to the RAI within 45 days of the date of this letter.

If you have any questions regarding this matter, please contact me at (301) 415-1016.

Docket No. 50-220 Sincerely, IRA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Additional Distribution via Listserv

Enclosure:

As stated DISTRIBUTION:

Public LPLI-1 R/F RidsNrrDoriDpr RidsOGCMaiiCenter T. Martinez-Navedo R. Mathew RidsNrrDoriLpl1-1 RidsNrrLAKGoldstein RidsRgn1 MaiiCenter D. Kern R. Stattel J. Thorp ADAMS ACCESSION NO ML14342A097 OFFICE LPLI-1/PM LPLI-1/LA NMorgan NAME (DPickett for)

KGoldstein DATE 12/09/2014 12/08/2014 RidsNrrPMPilgrim RidsAcrsAcnw _MaiiCTR P. Krohn G. Matharu C. Tilton M. Razzaque

  • b

'I

>y ema1 DE/EEEB*

LPLI-1/BC TMartinez-Navedo BBeasley 12/04/2014 12/10/2014 OFFICIAL RECORD COPY