Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2 February 2024Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML23342A1189 January 2024Independent Spent Fuel Storage Installation Security Inspection Plan
L-23-019, Proof of Financial Protection 10 CFR 140.1518 December 2023Proof of Financial Protection 10 CFR 140.15
ML23334A18230 November 2023Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Locked High Radiation Area
Tornado-Generated Missile
Aging Management
Abnormal operational transient
Design basis earthquake
Annual Radiological Environmental Operating Report
License Renewal
Earthquake
Control of Heavy Loads
Accidental discharge
Fire Protection Program
Fire Watch
Scaffolding
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point13 November 2023Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point
ML23306A0992 November 2023and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7)
L-23-011, 10 CFR 72.48 Biennial Change Summary Report27 October 202310 CFR 72.48 Biennial Change Summary Report
IR 05000293/202340131 August 2023NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only)Affidavit
IR 05000293/20230024 August 2023NRC Inspection Report No. 05000293/2023002Grab sample
Offsite Dose Calculation Manual
IR 05000293/195700126 May 2023635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077
L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)23 May 2023Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)
ML23135A21515 May 2023Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
ML23136A77915 May 2023Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Chernobyl
Fuel cladding
Grace period
ML23125A05525 April 2023FOIA-2023-000081 - Resp 1 - Final
L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 202224 April 2023HDI Annual Occupational Radiation Exposure Data Reports - 2022
ML23125A06013 April 2023FOIA-2023-000079 - Resp 1 - Final
ML23113A02311 April 2023NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit)Offsite Dose Calculation Manual
Process Control Program
L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations31 March 2023Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML23088A03829 March 2023Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance
ML23125A05420 March 2023FOIA-2023-000081, Request for Copies of Any and All Complaints, Investigate Reports, Witness Statements, Memoranda, Correspondence, Records, And/Or Other Documents Which Refer or Relate to an Incident Located at 600 Rocky Hill Road, Plymout
ML23125A05916 March 2023FOIA-2023-000079, Request for Documentation Received by the NRC from Holtec Dated 2021 to the Present (March 16, 2023) on Discussions with the Plymouth Police Department (Ppd) on the Memorandum of Agreement (Moa) for an Enhanced Emergency R
ML23069A27813 March 2023Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application
ML22361A10224 February 2023Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities
IR 05000293/202200415 February 2023NRC Inspection Report No. 05000293/2022004High Radiation Area
Coatings
Fire Protection Program
ML22356A07131 January 2023Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover LetterAnnual Radioactive Effluent Release Report
Exemption Request
ML22356A07231 January 2023Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report-SERAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Exemption Request
ML23023A03619 January 2023Velan, Inc., Notification of Entergy Report That a Butterfly Valve, Model W19-0CP13-KCDN-B0001, Was Found to Have a Number of Fasteners Loose
ML22347A27821 December 2022Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022
L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.1514 December 2022Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15
L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension9 December 2022Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date ExtensionOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Exemption Request
ML22321A1041 December 2022Lessons Learned Recommendations Effectiveness Review
IR 05000293/202200318 November 2022NRC Inspection Report No. 05000293/2022003High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
ML22335A27715 November 2022NRC 699 - Conversation Record with HDI Regarding Pilgrim ISFSI Exemption Request Related to Radioactive Effluent Reporting RequirementsExemption Request
L-22-036, Decommissioning Trust Fund Agreement8 November 2022Decommissioning Trust Fund Agreement
ML22335A2804 November 202211-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption RequestExemption Request
ML22276A17624 October 2022Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages
ML22270A04226 September 2022Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293)Annual Radioactive Effluent Release Report
ML22266A19223 September 2022and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration
ML22272A03522 September 2022S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions
ML22269A42022 September 2022Citizen Lawsuit
ML22241A11229 August 2022Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
Exemption Request
NRC-2015-0070, Comment (044) from Mary Lampert of Pilgrim Watch on PR-20, 26, 50, 51, 52, 72, 73 and 140 - Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning22 August 2022Comment (044) from Mary Lampert of Pilgrim Watch on PR-20, 26, 50, 51, 52, 72, 73 and 140 - Regulatory Improvements for Production and Utilization Facilities Transitioning to DecommissioningFitness for Duty
Cyber Security
Aging Management
Design basis earthquake
Earthquake
Chernobyl
Fuel cladding
Backfit
IR 05000293/202200212 August 2022NRC Inspection Report No. 05000293/2022002Fire Barrier
Fire Protection Program
ML22227A07410 August 2022Overview of Pilgrim Liquid Discharge Considerations NOAA
ML22215A1773 August 2022Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages
ML22206A1511 August 2022NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006
ML22221A2591 August 2022LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293)
ML22175A17328 July 2022LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod BayLicense Renewal
Exemption Request
ML22193A16628 July 2022LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293)License Renewal
Exemption Request
ML22154A4881 June 2022Letter from Conservation Law Foundation Regarding Irradiated Water Release from PilgrimPandemic
COVID-19