Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24019A193 | 30 January 2024 | Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 | |
ML24026A053 | 30 January 2024 | Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information | Safe Shutdown Exemption Request Fire Protection Program |
ML24010A003 | 30 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting | |
IR 05000348/2023040 | 24 January 2024 | 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter | |
ML24012A122 | 12 January 2024 | Single Positive Test Form Collected on 09/25/2023 | |
ML24012A126 | 12 January 2024 | Single Positive Test Form Collected on 10/11/2023 | |
ML24012A124 | 12 January 2024 | Single Positive Test Form Collected on 10/02/2023 | |
ML23341A204 | 12 January 2024 | Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) | Exemption Request |
ML24012A127 | 12 January 2024 | Single Positive Test Form Collected on 10/16/2023 | |
ML24012A128 | 12 January 2024 | Single Positive Test Form Collected on 10/18/2023 | |
ML24012A125 | 12 January 2024 | Single Positive Test Form Collected on 10/09/2023 | |
ML24012A123 | 12 January 2024 | Single Positive Test Form Collected on 10/02/2023 | |
NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis | 11 January 2024 | Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis | |
ML23361A081 | 8 January 2024 | SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR | Incorporated by reference Condition Adverse to Quality Control of Heavy Loads |
ML23345A131 | 3 January 2024 | Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) | Exemption Request |
ML23356A028 | 27 December 2023 | December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam | |
ML23346A222 | 22 December 2023 | Transmittal of Dam Inspection Report - Public | |
ML23356A143 | 22 December 2023 | Marsh USA, LLC - Certificate of Liability Insurance for Joseph M. Farley Nuclear Power Plant, Hatch Nuclear Power Plant and Alvin W. Vogtle Nuclear Power Plant | |
NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers | 15 December 2023 | 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers | |
NL-23-0908, Cycle 30 Core Operating Limits Report | 13 December 2023 | Cycle 30 Core Operating Limits Report | Shutdown Margin |
PMNS20231383, Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR | 11 December 2023 | Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR | |
ML23335A012 | 1 December 2023 | FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) | |
ML23335A011 | 1 December 2023 | IP 95001 Inspection Notification and Request for Information (EA-23-080) | Condition Adverse to Quality |
PMNS20231347, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle | 29 November 2023 | Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle | |
NL-23-0877, Request for Exemption from Security Event Notification Implementation | 29 November 2023 | Request for Exemption from Security Event Notification Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23228A143 | 22 November 2023 | Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals | Stroke time Incorporated by reference Surveillance Frequency Control Program |
ML23311A130 | 17 November 2023 | Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 | Exemption Request |
NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection | 14 November 2023 | Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection | Condition Adverse to Quality Significance Determination Process Preliminary White Finding |
ML23319A079 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Boric Acid Hydrostatic Pressure Boundary Leakage Overspeed trip |
ML23319A084 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 18, License Renewal - Aging Management Programs and Activities | Boric Acid Ultimate heat sink Coatings Incorporated by reference Aging Management Pressure and Temperature Limits Report License Renewal Fire Protection Program |
ML23319A082 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | Probabilistic Risk Assessment |
ML23319A073 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Unanalyzed Condition Boric Acid Health Physics Network Shutdown Margin Loop seal Ultimate heat sink Grab sample Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Tornado-Generated Missile Aging Management License Renewal Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Fire Protection Program GOTHIC Power Uprate Overspeed trip |
ML23319A078 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Safe Shutdown Earthquake Operating Basis Earthquake Incorporated by reference Job Performance Measure Process Control Program |
ML23319A075 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Stroke time Hydrostatic Nondestructive Examination Turbine Missile Biofouling Power Uprate Measurement Uncertainty Recapture Overspeed trip |
ML23319A071 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Operator Manual Action Emergency Lighting Surveillance Frequency Control Program Open Phase Condition Large early release frequency Earthquake Offsite Circuit Overspeed trip |
ML23318A070 | 31 October 2023 | Technical Specifications Bases | |
ML23319A068 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Shutdown Margin Packing leak Mission time Grab sample Stroke time Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Finite Element Analysis Aging Management Time Critical Operator Action Fuel cladding Pressure Boundary Leakage Fire Protection Program GOTHIC Power Uprate Measurement Uncertainty Recapture Overspeed trip |
ML23318A067 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, | Fire Protection Program |
ML23319A064 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Met Tower Finite Element Analysis Earthquake |
ML23319A065 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Met Tower Operating Basis Earthquake Nondestructive Examination Emergency Lighting Incorporated by reference Finite Element Analysis Tornado-Generated Missile Aging Management Tornado Generated Missile Tornado Missile Protection Design basis earthquake Tornado Missile Risk Evaluator License Renewal Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Power change Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture Overspeed trip |
NL-23-0806, Technical Requirements Manual | 31 October 2023 | Technical Requirements Manual | Boric Acid Shutdown Margin Ultimate heat sink Grab sample Overspeed trip |
ML23319A063 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML23319A069 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Water Inventory Control Earthquake Fuel cladding Power change Overspeed trip |
ML23319A083 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Boric Acid Hydrostatic Coatings Nondestructive Examination Emergency Lighting Liquid penetrant |
ML23319A066 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Nondestructive Examination Aging Management Design basis earthquake Earthquake Fuel cladding Power change Power Uprate Measurement Uncertainty Recapture Failure to Scram Overspeed trip |
ML23319A062 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Effective Page Listing | |
ML23319A080 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Safe Shutdown Earthquake Tornado-Generated Missile Earthquake Fuel cladding Power change Coast down Power Uprate Measurement Uncertainty Recapture Failure to Scram |
ML23319A076 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Fuel cladding Pressure Boundary Leakage Power Uprate |
ML23319A077 | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Fuel cladding Overexposure |